1 / 26

Super LHC - SLHC

Super LHC - SLHC. LHC Detector Upgrade Dan Green Fermilab. Outline. Physics Basics Z’ vs Rapidity Range Minbias Pileup and Jets Occupancy and Radiation Dose Tracker Upgrade Calorimetry Muons Trigger and DAQ.

gisela
Download Presentation

Super LHC - SLHC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Super LHC - SLHC LHC Detector Upgrade Dan Green Fermilab

  2. Outline • Physics Basics • Z’ vs • Rapidity Range • Minbias • Pileup and Jets • Occupancy and Radiation Dose • Tracker Upgrade • Calorimetry • Muons • Trigger and DAQ CERN-TH/2002-078 “Physics Potential and Experimental Challenges of the LHC Luminosity Upgrade” [10x will be challenging]

  3. Mass Reach vs L VLHC LHC Tevatron The SLHC defines a decades long LHC Physics program. In general mass reach is increased by ~ 1.5 TeV for Z’, heavy SUSY squarks or gluinos or ~ 20% of extra dimension mass scales. A ~ 20% measurement of the HHH coupling is possible for Higgs masses < 200 GeV. However, to realize these improvements we need to maintain the capabilities of the LHC detectors.

  4. Kinematics 5 TeV 1 TeV barrel y barrel Heavy States decay at wide angles. For example Z’ of 1 and 5 TeV decaying into light pairs. Therefore, for these states we will concentrate on wide angle detectors.

  5. LHC SLHC s 14 TeV 14 TeV L 1034 1035 100 1000 Bunch spacing dt 25 ns 12.5 ns N( interactions/x-ing) ~ 12 ~ 62 dNch/d per x-ing ~ 75 ~ 375 Tracker occupancy 1 5 Pile-up noise 1 ~2.2 Dose central region 1 10 Detector Environment Bunch spacing reduced 2x. Interactions/crossing increased 5 x. Pileup noise increased by 2.2x if crossings are time resolvable.

  6. Pileup and Luminosity • For ~ 50 mb, and = 6 charged pions/unit of y with a luminosity and a crossing time of 12.5 nsec : • In a cone of radius = 0.5 there are ~ 70 pions, or ~ 42 GeV of transverse momentum per crossing. This makes low Et jet triggering and reconstruction difficult.

  7. WW Fusion and “Tag Jets” Pileup, R=0.5, |y|=3 These jets have ~ pileup R = 0.5 and <y> ~ 3. Lose 5x in fake rejection. We must use the energy flow inside a jet cone to further reduce the fake jets due to pileup (~ uniform in R). WW fusion

  8. Tracking Detectors • Clearly, the tracker is crucial for much of the LHC physics [e.g. e, , jets (pileup, E flow), b tags]. • The existing trackers will not be capable of utilizing the increased luminosity as they will be near the end of their useful life. • It is necessary to completely rebuild the LHC tracking detectors.

  9. Tracker - Occupancy • The occupancy, O, for a detector of area dA and sensitive time time dt at (r,z) is • e.g. Si strip 10 cm x 100 m in a 12.5 nsec crossing at r = 20 cm is 1.5 % • For higher luminosity, decrease dA, or decrease dt (limit is x-ing time) or increase r – smaller, faster or further away.

  10. Tracker Occupancy • Preserve the performance using : • Push Si strips out to ~ 60 cm. – development • Push pixels out to 20 cm. – development • For r < 20 cm. Need new technologies – basic research • Shrink dA 5x at fixed r to preserve b tagging? If 12.5 nsec bunch x-ing, need 5x pixel size reduction. • Possibilities • 3-d detectors – electrodes in bulk columns • Diamond (RD42) - radhard • Cryogenic (RD39) – fast, radhard • Monolithic – reduced source capacity.

  11. Tracker ID vs. Radius 1 2 3 naive Define 3 regions. With 10x increase in L, need a ~ 3x change in radius to preserve an existing technology. The ID scales as ~

  12. 10mm P. Sharp Industry 1mm Research 0.1mm 1985 2000 Electronics – Moore’s Law • Micro-electronics: line-widths decrease by a factor 2 every 5 years. DSM (0.25 m) is radiation hard.Today 0.13 m is commercially available. In the lab 0.04 m, e.g. extreme UV lithography, is in existence. Expect trend will continue for a decade. • R&D • Characterize emerging technologies •  more radiation tolerance required – dose and Single Event Effects •  advanced high bandwidth data link technologies • system issues addressed from the start

  13. HCAL and ECAL Dose ecal hcal naive The dose ratio is ~ . Barrel doses are not a problem. For the endcaps a technology change may be needed for 2 < |y| < 3 for the CMS HCAL. Switch to quartz as in HF? SD ~ ID/sin.

  14. HCAL - Coverage Reduced forward coverage to compensate for 10x L is not too damaging to “tag jet” efficiency, SD ~ 1/3 ~ e3

  15. Scintillator - Dose/Damage |y|=2, 1 yr. This technology will not survive gracefully at |y| ~ 3. Use the technology that works at LHC up to |y|~ 5, quartz fibers/plates ?

  16. Muons and Shielding There is factor ~ 5 in headroom at design L. With added shielding, dose rates can be kept constant if angular coverage goes from |y|<2.4 to |y|<2. r r z

  17. Trigger and DAQ • Assuming LHC initial program is successful, raise the trigger thresholds? • Rebuild trigger system to run at 80 MHz? Utilize those detectors which are fast enough to give a BCID within 12.5 nsec (e.g. Calorimetry, Tracking, Muon?). • Examine algorithms to alleviate degraded e isolation, for example. • Design for the increased event size (pileup) with reduced L1 rate and/or data compression. • For DAQ track the evolution of communication technologies, e.g. 10 Gb/sec Ethernet.

  18. Level-1 Trigger Table (2x1033) Steeply falling spectra. Use muons and calor only? Jets and muons ~ clean  HLT is resolution on spectral “edge”

  19. Level-1 Trigger Table (1034) L1 Trigger on leptons, jets, missing ET and calib/minbias. Does this suite cover all the Physics we want?

  20. L1 at 1035 ? • Muons are ~ clean. Issue of low momentum muons from b jets. Jets are ~ clean. ECAL jets are mostly “garbage”  need tracker to make big L1 improvements. • Rutherford scattering ~ 1/PT3.

  21. Higgs Self Coupling Baur, Plehn, Rainwater HH  W+ W- W+ W-   jj jj Find the Higgs? If the H mass is known, then the SM H potential is completely known  HH prediction. If H is found, measure self-couplings, but ultimately SLHC is needed. CMS will not, in all scenarios, be moving to higher masses. Sometimes rarer processes must be measured at the same mass scale.

  22. HLT Summary: 2x1033 cm-2s-1

  23. HLT Performance — Efficiency Gains in HLT? Tracker (pixel) biggest gain for e. Single muon and electron still the highest rates.

  24. Level-1 Trigger • Trigger Menus • Triggers for very high pT discovery physics: no rate problems – higher pT thresholds • Triggers to complete LHC physic program: final states are known – use exclusive menus • Control/calibration triggers with low thresholds (e.g. W, Z and top events): prescale • Impact of Reduced Bunch Crossing Period • Advantageous to rebuild L1 trigger to work with data sampled at 80 MHz ? Work out the consequences • Require modifications to L1 trigger and detector electronics • Could keep some L1 trigger electronics clocked at 25 ns? • R&D Issues • Data movement is probably the biggest issue for processing at 80 MHz sampling • Processing at higher frequencies and with higher input/output data rates to the processing elements. Technological advances (e. g. FPGA ) will help • Synchronization (TTC) becomes an issue for short x-ing period

  25. HCAL Timing

  26. Summary • The LHC Physics reach will be substantially increased by the higher luminosity of the SLHC program. • To realize that improvement, the LHC detectors must preserve performance. • The trackers must be rebuilt – with new technology at r < 20 cm. • The calorimeters, muon systems, triggers and DAQ will need development. • The upgrades are likely to take ~ (6-10) years. Accelerator is ready ~ (2012, 2014). The time to start is now. • The work on the SLHC for CMS are beginning.

More Related