An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview CMAA May 29, 2014

  2. What is Metro Regional Rail To Bakersfield • Manage more than 165 miles of R/W in L.A. County • Develop capital improvement projects and programs. • Coordinate with Metrolink, Amtrak, CHSRA, and freight. High Desert Corridor Antelope Valley Line LOSSAN Corridor San Bernardino Line Los Angeles Union Station

  3. Regional Rail in L.A. County • We are taking a stronger role in the region and the state regarding passenger rail. • Working with Metrolink to define needs in L.A. County. • Working with local municipalities to identify needs in L.A. County. • Developing a program. • Programming projects to advance regional rail. • Working with the LOSSAN JPA on strategic needs.

  4. California High Speed Rail • 2014 Business Plan places an emphasis on southern California • The Blended Service identifies an Initial Operating Segment to the San Fernando Valley in 2022. • This creates the need for substantial infrastructure development in the region to meet the HSR program. • Advanced timeline. • MOU provides for $1B of advance investment in southern California • Identified projects have independent utility.

  5. Regional Rail Capital Program • Advancing projects address the following: • Grade Crossing and Corridor Safety on Metro owned right-of-way. • Capacity. • Community needs. • Advancing these projects: • Facilitates the high speed rail MOU. • Develops programs that are attractive for other sources of funding. • Benefits communities throughout L.A. County. • Benefits all passengers traveling within L.A. County.

  6. L.A. County Regional Rail Projects • SCRIP * • Doran St. Grade Separation * • Raymer to Bernson Second Track * • Van Nuys Second Platform * • Vincent Grade Siding and Platform * • Bob Hope Airport/Hollywood Way Station * • Bob Hope Airport Station Pedestrian Overpass • Rosecrans/Marquardt Grade Separation • CP White to Lone Hill Env. • * Denotes projects in progress 5 6 3 4 2 7 9 1 8

  7. Regional Rail Capital Program

  8. Program Management • The Metro Regional Rail Program is extensive. • Current construction estimate is approx. $750M. • Developing an RFP for Program Management. • The Regional Rail team will need staff augmentation for assistance. • Will include: • Management • Engineering support • Overall staff support.

  9. Southern California Regional Interconnector Project • Extends at least four LAUS platform tracks to exit at the south end of the yard. • Increases station capacity by 40% - 50%. • Reduces GHG by 44%. • Creates operational flexibility. • PM/CM opportunity Fall 2014that will include: • Management • Engineering support • CM support

  10. Southern California Regional Interconnector Project

  11. Bob Hope Airport Pedestrian Bridge • Extends the elevated walkway from the Regional Intermodal Transportation Center to the existing Burbank Airport Station. • Metro awarded a state STIP allocation to connect the Regional Intermodal Transportation Center (RITC) with the existing Bob Hope Airport Station. • $7M is to be allocated for this project. • The Regional Rail team will be working with the Airport and Metrolink to develop this project. • An RFP for engineering is expected Summer 2014.

  12. Bob Hope Airport Pedestrian Bridge

  13. Rosecrans/Marquardt Grade Separation • Grade separates the No.1 hazardous crossing in the state. • Part of the BNSF Triple Track Project. • Needed for safety and capacity. • Benefits passenger and freight rail. • Updating the engineering. Project Area

  14. CP White to Lone Hill • Double Track • Env. and PE • 3.9 Miles in length • Eliminate an existing bottleneck • Provide additional capacity - up to 44 trains • RFP expected Summer of 2014. Project Area

  15. Grade Crossings in L.A. County Incidents at Los Angeles County at-grade crossings over the last 5 years Source: Federal Railroad Administration

  16. L. A. County Grade Crossing and Corridor Safety Program • Examine 111 at-grade crossings. • Develop an overall strategy to corridor solutions based on engineering, education, and enforcement. • Multi-phased program. • Extensive outreach to the communities. • Establish funding strategies to address crossing and corridor issues. • RFP in Summer 2014. • Will identify use of four Project Study Reports.

  17. Brighton to Roxford Double Track • Identified in AVL study as a significant constraint. • Second on the regional MOU priority list. • Will address grade crossing safety issues in the corridor. • Will facilitate HSR.

  18. What is in the Future? • Develop an L.A. County rail program. • AVL study, • San Bernardino Line study, • Grade crossing and corridor safety. • Advance projects and programs that: • Enhance capacity, • Improve mobility for the region, • Provide safety benefits. • Establish the programming need in L.A. County: • Measure R, • Grade crossing funding programs, • Other sources.