Makeshift Surfaces. Main Street - Re-Profiling Of Travel Surface. Insufficient Funds For Full Overlay. Deep Problems. Wilbraham Rd. Catch Basin About 25 Feet Deep. Wilbraham Road. Built in the mid-1970s Life Expectancy of the pipes is about 25 years.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Makeshift Surfaces' - ginger-hale


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
wilbraham road
Wilbraham Road
  • Built in the mid-1970s
  • Life Expectancy of the pipes is about 25 years.
slide6

The Same Vintage Underground Pipe Failed On The Golf Course Last Fall And The Fairway Was Replaced By the Golf Course With This New Water Hazard

hampden s previous paving plan
Hampden’s Previous Paving Plan
  • $110,000 per Year for Paving Only
  • Annual Capital Exclusion Override
  • Passed FY-1997, FY-1998, FY1999
  • Failed FYY-2000, FY-2001, FY-2002
  • Abandoned FY-2003
declining funds due to years of level funding
Declining Funds Due To Years Of Level Funding
  • FY - 1996
  • Year #1 of 6-year paving plan $110,800
  • State Aid (Chapter 90) $198,233
  • Available Local Funds (Highway Maintenance) $ 16,000
  • Total: $325,033
compared to this year
Compared To This Year
  • FY - 2006
  • Unfunded 6-year paving plan $ 0
  • State Aid (Chapter 90) $157,946
  • Available Local Funds (Highway Maintenance) $ 14,000
  • Total $171,946
10 year net reduction of available funds
10-Year Net Reduction of Available Funds
  • FY - 1996 $325,033
  • FY – 2006 $171,946
  • Net Reduction($153,087)
backhoe rental
Backhoe Rental
  • $75 / Hr.
  • Includes Operator, Thus Available Highway Personnel Cannot Be Efficiently Used.
  • Must Be Scheduled In Advance.
possible backhoe purchase
Possible Backhoe Purchase
  • If the cost of renting a backhoe for these projects is greater than the cost of purchasing one…
  • Then the purchase of a backhoe will be considered as part of this infrastructure improvement plan.
infrastructure improvement proposal
Infrastructure Improvement Proposal
  • $4 Million, 10-Year Bond to “Catch Up”
  • $300,000 Annual Funding to “Keep Up”