Utility’s Perspective Of Future Transmission

Utility’s Perspective Of Future Transmission. September 23, 2008. Topeka. Kansas. Vertically Integrated Kansas Utility. Key Operational Facts: ≈ 667,000 customers More than 6,100 MW of generation – 2006 reserve margin 12% 11,000 sq mile service territory 33,000 miles of T & D

Download Presentation

Utility’s Perspective Of Future Transmission

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Utility’s Perspective OfFuture Transmission September 23, 2008

  2. Topeka Kansas Vertically Integrated Kansas Utility • Key Operational Facts: • ≈ 667,000 customers • More than 6,100 MW of generation – 2006 reserve margin 12% • 11,000 sq mile service territory • 33,000 miles of T & D • 2,100 employees • Kansas retail market remains fully regulated

  3. Westar’s Transmission • 4300 miles of transmission > 60 kV • Member of Southwest Power Pool (SPP) • SPP Transmission Tariff Member • SPP Regional Entity Member for Reliability • 2008 Transmission Construction budget - $150 million • Two Major 345 kV projects • Wichita to Hutchinson to Salina 345 kV line • Wichita to Oklahoma 345 kV line

  4. Current Transmission Projects • Wichita to Hutchinson • Approximately 40 miles • Hutchinson to Salina • Approximately 60 miles • Wichita to Oklahoma • Approximately 50 miles • Other significant projects “inside regional footprint”

  5. Current Transmission Projects • Wichita to Hutchinson to Salina 345 kV Project • Wichita to Hutchison (Reno) line to be completed by the end of 2008 • Reno to Salina (Summit) line to be completed by the end of 2009 • Wichita to Oklahoma 345 kV project • Project to be completed by the end of 2010 • These Projects eliminate two of the most highly active constraints in the SPP system

  6. Prairie Wind Transmission • Joint venture between Westar and Electric Transmission America (ETA) • ETA is owned 50/50 by AEP and Mid American • AEP is the only utility in nation that has 765kV in operation • AEP has designed, constructed and operated 765kV for almost 40 years

  7. Prairie Wind Transmission • Prairie Wind was formed to design, construct and operate the first 765kV transmission west of the Mississippi • SPP’s consultant Quanta identified the Prairie Wind project as the logical first step in building a 765kV overlay in the SPP • Coupled with the Tallgrass Project announced by Oklahoma Gas & Electric and ETA, substantial progress will be made in realizing a transmission “interstate highway” in the SPP

  8. Prairie Wind Project Prairie Wind Transmission

  9. Benefits of Prairie Wind Project • Enables substantial renewable wind development in western Kansas • Provides substantial economic development benefits to Kansas via jobs for construction of line and wind farms and royalty payments to landowners • Enables broader opportunities for energy markets in Kansas thereby lowering power supply costs • Substantial environmental benefits • Lower voltage lines will be unloaded • Using 765kV technology results in substantially lower losses on the transmission system and improved reliability

  10. 765-kV Value Proposition Advanced Technology Environmental Stewardship • Advanced six-conductor bundles for higher capacity, lower line losses and reduced noise • Fiber-optic shield wires for better protection and control • Wide-area monitoring, control, and remote diagnostics • Independent-phase operation for improved line performance • Line design and right-of-way usage for least environmental impact More capacity on less land