An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPRR 555 NPRR 532Aggregate Load Resource OBD ERCOT Staff Presentation NDSWG July 29, 2013

  2. NPRR 555: Loads in SCED 1.0 • NPRR 555 represents ERCOT’s effort to find a way for demand response to contribute to price formation, with potential for implementation by Summer 2014 ALR/NPRR 555

  3. Timeline • To meet summer 2014 goal, ERCOT will need to meet following market rules timeline: • May 28 Concept doc distributed to TAC/WMS/DSWG • May 31 DSWG discussion • June 6 TAC discussion • June 10 Loads in SCED Workshop I • June 12 WMS discussion • June 27 NPRR draft posted • June 28 DSWG detailed review of draft NPRR • July 3 NPRR 555 filed with preliminary IA • July 8 DSWG Subgroup – deep dive review • July 10 WMS NPRR discussion (vote deferred) • July 18 PRS NPRR discussion: Urgency granted, votedeferred • July 29NDSWG Webex • Aug. 8 Loads in SCED Workshop II • Aug. 14 WMS (vote) • Aug. 15 ROS (vote) • Aug. 22 PRS (vote) • Sept. 5 TAC (vote) • Sept. 17 BOD (vote) Today’s discussion should inform ROS endorsement vote ALR/NPRR 555

  4. High-level summary (cont.) • Eligibility to participate: LSE QSEs representing Load Resources capable of following 5-minute SCED base point instructions • Existing or new single-site Controllable Load Resources (CLRs) • Aggregate Load Resources (ALRs) (subset of CLR) • Candidates for initial participation are expected to be residential aggregations with centralized load control over AC units • QSEs/aggregators will be able to respond to base points by cycling AC units via compressor switches or thermostat control ALR/NPRR 555

  5. OBD on Aggregate Load Resources: Phase 1 • Implementation is related to adoption of NPRR 532 (CPS Energy: LR Participation in Non-Spin), and… • Other Binding Document on Aggregate Load Resources • Phase 1 of ALR integration: ALR must be composed of multiple sites within a single ERCOT Load Zone • ALRs will be assigned to a single Load in the ERCOT CIM (consistent with current Load Resources) • SCED will dispatch LRs for power balance and congestion management • For congestion management, LRs will be assigned the applicable Load Zone Shift Factor, which is an approximation • This interim approach will work as long as ALR participation remains relatively low ALR/NPRR 555

  6. ALR Evolution • Low levels of ALR participation are expected in the first few years • Limited number of LSEs with this type of DR capability • Many in DR community are citing difficulty of participation and lack of financial incentive • Nevertheless, we need a long-term plan for Network Modeling to ensure consistency with premises of Texas Nodal and Security-Constrained Economic Dispatch • ERCOT will work with stakeholders to develop a workable long-term approach to ALR modeling • May be several options including Texas Load Aggregation Points (TLAPs) • PUC Rulemaking may be necessary ALR/NPRR 555

  7. Why we’re here: NDSWG Action Items 1. How do we define the interim period? • Load Zone approach for ALRs is interim • Assuming regulatory questions are resolved, OBD proposes interim caps on ALR participation • Caps would be in place until long-term approach is developed and system upgrades are implemented • Proposed caps are: • System-wide ALR participation capped at 250 ALRs • Combined demand response capability of all ALRs within any single ERCOT Load Zone capped at 5% of the Load Zone’s summer peak demand • Are these capped at the right levels? ALR/NPRR 555

  8. Why we’re here: NDSWG Action Items 2. What information do the TDSPs need? • TDSPs have expressed concern over potential for growth in ALRs and the location of the participating loads • Growth in distribution-level DR could affect: • Firm load shed capacity at the feeder level • UFLS capacity at the feeder level • Concern not limited to ALRs; it has also been raised relative to Load Resources, ERS Loads and Distributed Generation • Not to mention 4CP, retail price response, and response to media appeals -- all much more difficult to quantify • ERCOT is committed to working with TDSPs to identify scope of issue and find solutions • Informal task force has been formed • ERCOT Staff: Woody Rickerson and Mark Patterson • We encourage NDSWG to get engaged ALR/NPRR 555

  9. Questions? ON OFF paul.wattles@ercot.com 512/248-6578 mark.patterson@ercot.com 512/248-3912 ALR/NPRR 555