Renton Nickel

Renton Nickel. It’s your nickel, watch it work!. A Little Background. National Environmental Policy Act (NEPA) “P” stands for Policy Signed into law by President Nixon NEPA documentation started out simply enough Quickly proceeded to get very complicated

Download Presentation

Renton Nickel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renton Nickel It’s your nickel, watch it work!

  2. A Little Background • National Environmental Policy Act (NEPA) • “P” stands for Policy • Signed into law by President Nixon • NEPA documentation started out simply enough • Quickly proceeded to get very complicated • Documentation now driven by litigation

  3. I-405 Corridor • Started in 1965, completed in 1971 • Two lanes in each direction from Tukwila to Lynnwood (I-5 to I-5) right at 30 miles • High occupancy vehicle (HOV) lanes added in the 1990s. • Made three lanes in each direction

  4. I-405 Corridor “Master Plan” 2002 • Developed a corridor master plan • Used a Tiered NEPA approach • First step • Environmental Impact Statement (FEIS) • Second step • Record of Decision • Third step • How to fund it? • Fourth Step • Additional NEPA documentation and Permitting

  5. FEIS Recommendations • Add two additional lanes in each direction • Improve interchanges • Add up to two lanes each direction along SR 167 • Bus rapid transit throughout corridor including east west connections (not fixed guide way) • HOV direct access • Anybody seen the Totem Lake HOV direct access? • Could add a 4’ buffer between HOV and GP lanes • Why?

  6. Record of Decision • “The FTA in coordination with FHWA, WSDOT, KCDOT, and Sound Transit concurs that the Selected Alternative meets the Purpose and Need of the I-405 Corridor Program, finds that the Draft and Final Environmental Impact Statement represent detailed statements required by NEPA and by 42 U.S.C. Section 4332 on: • the environmental impacts of the proposed action; • the adverse environmental effects which can not be avoided should the proposed action be implemented; • alternatives to the proposed action; • And mitigation measures required to minimize the harm of irreversible and irretrievable impacts on the environment should the proposed action be implemented; • and finds that, on a corridor level, the requirements of NEPA and of 49 U.S.C. Section 5324(b) have been satisfied or met.

  7. How do we fund it? • Nickel gas tax of 2003 • Funded $4 billion in Washington state projects • $485 million on I-405 • Added 5 cents a gallon of gasoline and diesel • Transportation Partnership Account (TPA) • Funded an addition $7 billion • $972 million for I-405 • 9.5 cents more per gallon in fuel taxes

  8. Nickel projects along I-405 • Kirkland Nickel (partly constructed) • $164 million • Would add a lane in each direction (520 to 522) • Staged construction • Will be fully constructed with a later project • Bellevue Nickel(mostly constructed) • $186 million • Would add a lane each direction (NE 4th to I-90) • Staged construction • Removed the Wilburton tunnel • Renton Nickel • $136 million • What was proposed to be funded is not exactly what’s being constructed… • Staged construction

  9. Remember the “Master Plan”? • Based on two lanes in each direction? • BRT (Bus rapid transit) • SR 167 improvements • Other elements

  10. Renton Nickel is now Renton Stage I • Renton Stage I • Combination of Nickel Funds and TPA funds • Allowed for one lane in each direction from I-5 to SR 167 • Allowed for one additional south bound lane on SR 167 • $91.5 million construction cost

  11. Renton Nickel EA • Environmental Assessment was one of the first supported by the corridor ROD • EA and permitting from early 2005 through late 2006 • FONSI early 2007 • Two year environmental process • Design-Build Contract awarded in June 2007 • Construction is a portion of what was covered by the EA

  12. Renton Nickel Wetland Impacts • There were 19.4 acres of total wetlands within the EA limits • Permanently fill 1.66 acres • Temporarily disturb 0.64 acres • Mitigation • Accomplished at the Springbrook Mitigation site

  13. “Typical Wetlands”

  14. Renton Nickel Stream Impacts • 0.07 acres of stream impacts • Some associated with new bridge over Springbrook creek • Box culvert removal • Side channel reconstruction • Some associated with SR 167 changes • About 2’ lengthening of a non-fish bearing culvert

  15. Tribal Resources • Court cases have determined that the tribe has “rights” to fish and shell fish resources • The Muckleshoot Indian Tribe (MIT) have “usual and accustom” fishing areas in Renton and most other I-405 areas • The Tribe has generally weighed in during Corps 404 permitting

  16. So, What does Environmental Do? • Determine resources • IDT field visits • Determine impacts with preliminary design • Make reconditions for modified designs • Pursue permitting and mitigation • Monitor construction and make permit modifications as construction proceeds

  17. Today’s site visit • We will see the stream mitigation site • Adding a main channel by-pass • Removing the main channel box culvert • Re-watering the main channel • Enhancing the side channel • Will all need to be completed in this year’s fish window • June 15 – September 1st

  18. Safety • Active construction site • Likely not “live” today • Slips, trips, and falls are most common • Watch for traffic • Stay together • Others?