Stanford EVSE Expansion Project. Ramses Madou Transportation Program Developer and Planner Stanford Parking & Transportation Services CHESC 2014. Overview. Scope of program Location selection Technology selection Program design. Scope of Program. 500 EVSE ports on campus Phase one

Download Presentation

Stanford EVSE Expansion Project

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Stanford evse expansion project

Stanford EVSE Expansion Project

Ramses Madou

Transportation Program Developer and Planner

Stanford Parking & Transportation Services

CHESC 2014


Overview

Overview

  • Scope of program

  • Location selection

  • Technology selection

  • Program design


Scope of program

Scope of Program

  • 500 EVSE ports on campus

  • Phase one

    • ~50 new ports (total ~56 on campus)

    • construction start late Fall/Winter 2014

  • Growth based on demand thereafter


Location selection

Location Selection

  • Land use density and regional balancing model

  • Specialist insight

  • Electrical capacity and equipment


Expansion plan p hase o ne l ocations and ports

Expansion Plan: phase one locations and ports


Expansion plan 500 p ort build o ut draft one

Expansion Plan: 500 port build out draft one


Technology selection

Technology selection

  • Station type

    • Level 1 and/or 2 and/or DC fast charge

  • Service type

    • Stations vs charging as a service

  • Other questions

    • Network

    • Panel level power management


  • Program design station m anagement p roblems

    Program design: Station management problems

    • Multiple kinds of users

    • Multiple kinds of vehicles

    • Intersection with current parking system


    Program design current solution

    Program design: Current solution

    • Commuter lots

      • Payment for EVSE use on top of normal parking prices

        • Special area permits for longer term permit parkers

        • Parking rate plus hourly EVSE use charge, equivalent to electricity costs

      • Panel managed, ten level 2 chargers per location template

    • Power stations

      • Shorter period charging for the needy

      • Mix of level 2 and DC fast chargers

      • No panel management