Hospital/Medical/Infectious Waste Incinerators (HMIWI)

Hospital/Medical/Infectious Waste Incinerators (HMIWI). Tiffany Miesel & John Glunn Florida DEP, Division of Air Resource Management May 26, 2010. What happened at the Federal Level?. September 15, 1997 – EPA promulgated final NSPS and Emissions Guideline rules for HMIWI

gerard
Download Presentation

Hospital/Medical/Infectious Waste Incinerators (HMIWI)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hospital/Medical/Infectious Waste Incinerators (HMIWI) Tiffany Miesel & John Glunn Florida DEP, Division of Air Resource Management May 26, 2010

  2. What happened at the Federal Level? • September 15, 1997 – EPA promulgated final NSPS and Emissions Guideline rules for HMIWI • December 1, 2008 - EPA proposed an updated rule which would tighten limits for HMIWI facilities • October 6, 2009 – EPA promulgated final, updated rules for new and existing HMIWI • 40 CFR 60, Subpart Ec for new sources (NSPS) • 40 CFR 60, Subpart Ce for existing sources (EG) • State plans for implementing the Emissions Guidelines must be submitted to EPA by October 6, 2010

  3. What are the differences? • New Source Performance Standards (NSPS) • For new or modified facilities • “For which construction is commenced after December 1, 2008; or for which modification is commenced after April 6, 2010” • Emissions Guidelines (EG) • For existing facilities • “For which construction was commenced on or before June 20, 1996, or for which modification was commenced on or before March 16, 1998” • “For which construction was commenced after June 20, 1996 but no later than December 1, 2008, or for which modification is commenced after March 16, 1998 but no later than April 6, 2010”

  4. Emissions Guidelines for Large HMIWI

  5. What has been done at the state level? • April 30, 2010 - DEP published notice of fast track, adoption-by-reference of subparts Ce & Ec • NSPS (Ec) • Federal effective date: April 6, 2010 • State effective date: June 11, 2010 • Emissions Guidelines (Ce) • State effective date for fast-track adoption of updated emissions guidelines is April 1, 2012 • April 30, 2010 – DEP published notice of Secretarial rule development to amend the fast-track adoption in support of state plan development

  6. Why the need for a Secretarial Adoption? • EPA requires the states to implement an enforceable plan (state rules) to ensure compliance with the emissions guidelines • Changes proposed to the fast-track adoption are: • To establish, with stakeholder input, Florida-specific compliance dates and permit application deadlines • To require additional metals testing • To clarify the interaction between the requirements of EG and the state rule for biological waste incinerators • Also, DEP is proposing to remove obsolete adoption by reference of Subpart HHHH (CAMR)

  7. Compliance and Performance Testing • Large HMIWI are covered by the DEP testing requirements in 62-296.401(4)(e)2. and 62-297.310, in addition to the federal performance testing requirements in 60.37e and 60.56c • Large HMIWI subject to annual PM and HCl testing under state rules will not be able to take advantage of the NSPS ‘’skip testing” provisions

  8. Compliance and Performance Testing (cont’d) • Mercury(Hg), cadmium(Cd) and lead(Pb) emissions are input-driven and may vary under similar control conditions • Proposed language in 62-204.800(9)(g)7., F.A.C. requires that a performance test for Hg, Cd, and Pb be conducted whenever a PM test is done • Proposed requirement doesn’t apply, for any of the metals, if a facility operates a continuous monitor for mercury • Testing would be effective beginning April 1, 2012