1 / 6

TGs LA Closing Report

TGs LA Closing Report. Author:. Date: 2011-01-20. Abstract. TGs closing report for the January 2011 meeting.

georgiannar
Download Presentation

TGs LA Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TGs LA Closing Report Author: Date: 2011-01-20 Dee Denteneer (Philips)

  2. Abstract TGs closing report for the January 2011 meeting. Extensively discussed most likely timeline, which would lead to a request for Unconditional Approval in July and a publication date around September 2011. Worked on resolutions to the comments received during the first Sponsor Ballot. Expect a first recirculation after the TG s ad hoc in Munich Dee Denteneer (Philips)

  3. Status • Before meeting • TGs passed its first Sponsor Ballot based Draft 8.0 with 95.6% approval rate (closed: January 10 2011). • We received 367 technical comments • During meeting • Reviewed the timeline, joint with a REVmb and in the editors’ meeting. • Resolved comments Dee Denteneer (Philips)

  4. Timeline review • During meeting, we reviewed the timeline, joint with a REVmb and in the editors’ meeting; see 11-11/107r1. Dee Denteneer (Philips)

  5. Comment resolution • During meeting, we resolved 290 comments, or approximately 80% of the comments received in the recirculation; see 11-11/0027r5. Straw polls gave clear directions on the resolutions of remaining comments. Dee Denteneer (Philips)

  6. Plan First recirculation targeted mid february after the Eindhoven ad hoc, February 7-9, hosted by Philips Prepare tutorial for March plenary

More Related