An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas Mitigation ProgramResidents out of homes406 days—1 year, 1 month, 9 days September 12, 2013

  2. Gas Mitigation Program • Control shallow gas above the MRAA with dual-phase vapor extraction • Remove gas from MRAA using similar gas/water extraction

  3. Respec Dual-Phase Vapor Extraction (DPVE) Pilot Test • Pilot test ran for a total of 219 hours. • DPVEtest was shut down at 14:00 on September 6, 2013. • Total methane removed = 6.9 pounds per hour methane or ~4,000 scfd • Bubbles started to reappear at NSDBS-026 within 90 minutes of shut down.

  4. Dual Phase Vapor Extraction Pilot Test PRIOR TO START UP Wednesday August 28, 2013 07:30 AM 3 hours prior to startup September 6 12:45 1 hour prior to shut down Forty horsepower oil-sealed dual phase liquid ring pump September 10, 2013 4 days after shutdown Compressor Very successful test conducted by Respec!

  5. Dual-Phase Vapor Extraction System Crawl space Slab-on-grade DPVE System Clay Aquitard Fine-grained sand MRAA Aquifer Gas

  6. Trailer Mounted DPVE Unit