New York University Concourse Project New York, NY. Kevin Hsia Lighting/Electrical Option Advisor: Dr. Richard Mistrick Ted Dannerth April 15, 2009. Overview. Summary of Thesis. General Building Information / Location. Concept. Gould Plaza – Architecture Breadth, Lighting Depth, .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Kevin Hsia Lighting/Electrical Option Advisor: Dr. Richard Mistrick Ted Dannerth April 15, 2009 ' - geneva


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

New York University Concourse Project

New York, NY

Kevin Hsia

Lighting/Electrical Option

Advisor: Dr. Richard Mistrick

Ted Dannerth

April 15, 2009


Summary of Thesis

  • General Building Information / Location

Concept

Gould Plaza – Architecture Breadth, Lighting Depth,

Tisch Hall Lobby – Lighting Depth

Photovoltaic Feasibility Study– Electrical Depth

Master Depth Study– Daylighting


Lighting Depth Study

  • Gould Plaza

  • Classroom

  • MBA Student Lounge

  • Tisch Hall Lobby

Electrical Depth Study

  • Redesign 4 spaces

  • Backup Generator

  • Photovoltaic Feasibility Study

Breadth Study

  • Architecture – Outdoor Plaza

  • Mechanical – Water Harvest System on Plaza

Master Depth Study

  • Daylighting – Tisch Hall


  • Summary of Thesis

Lighting Depth Study

  • Gould Plaza

  • Classroom

  • MBA Student Lounge

  • Tisch Hall Lobby

Electrical Depth Study

  • Redesign 4 spaces

  • Backup Generator

  • Photovoltaic Feasibility Study

Breadth Study

  • Architecture – Outdoor Plaza

  • Mechanical – Water Harvest System on Plaza

Master Depth Study


  • Building Name: New York University Concourse Project

  • 44 West 4th Street, New York, NY 10012

  • Building Occupant : Education/University

  • Size: 70,000 sq.ft

  • Owner: New York University Stern School of Business

  • Architect: Perkins + Will

  • MEP Engineer: BR+A

  • Structural: Severud

  • Lighting Designer: Cline Bettridge Bernstein Lighting Design

  • Construction dates: Fall 07 – Fall 09

  • Cost : $35 million

KMC

Tisch

Hall

Weaver

Hall

Gould Plaza


  • Building Name: New York University Concourse Project

  • 44 West 4th Street, New York, NY 10012

  • Building Occupant : Education/University

  • Size: 70,000 sq.ft

  • Owner: New York University Stern School of Business

  • Architect: Perkins + Will

  • MEP Engineer: BR+A

  • Structural: Severud

  • Lighting Designer: Cline Bettridge Bernstein Lighting Design

  • Construction dates: Fall 07 – Fall 09

  • Cost : $35 million

Ground Level

Upper Concourse

Lower Concourse


Create Pride

Strengthen Spirit of NYU

Eliminate Depression

Stress related to competitive nature of the business school

Provide Way-finding/Orientation

Congested traffic throughout the building

Improve Physical Health

Lack connection to nature and daylight


Sustainable Systems

Integrate energy efficient systems into architecture

Function

Improve overall usage of building



  • Architecture Breadth

  • New Furniture System

  • Create relaxing atmosphere

  • Bring scale of the plaza down


  • Architecture Breadth

  • New Furniture System

  • Create relaxing atmosphere

  • Bring scale of the plaza down


Considerations and Criteria

Safety to walk

Modeling points of interest: Doors & Walkways

Maintain 1 fc on major walkways

Create sense of pride

Design Solution

Address school identity by lighting a NYU logo

Light perimeter of Plaza to define the boundary


3

2

1

10

9

1

4

6

4

7

6

8

10

9

2

7

5

3

8

5



Design Solution

Achieve average 1 fc on entrance and major walkways

Power Density Designed 0.17 W/sq. ft

Power Density Max Allowed 0.2 W/sq. ft


Considerations and Criteria

Create spacious and pleasant environment

Facial recognition and safety

Achieve 15 fc on floor

Design Solution

Using light to create a hierarchy to direct people

Use of modern looking luminaires


Considerations and Criteria

Create spacious and pleasant environment

Facial recognition and safety

Achieve 15 fc on floor

Design Solution

Using light to create a hierarchy to direct people

Use of modern looking luminaires


  • Tisch Hall Lobby

4

6

1

Considerations and Criteria

Create spacious and pleasant environment

Facial recognition and safety

Achieve 15 fc on floor

Design Solution

Using light to create a hierarchy to direct people

Use of modern looking luminaires

1

2

2

3

5

7

6

5

4

3

7


  • Tisch Hall Lobby


  • Tisch Hall Lobby

Design Solution

Achieve average 15 fc on lobby floor

Power Density Designed 1.05 W/sq. ft

Power Density Max Allowed 1.30 W/sq. ft


Considerations

Promote alternative ways to generate electricity

Design Solution

Install photovoltaic panels on Weaver, Tisch, and KMC


Equinox – March 21st

Considerations

Promote alternative ways to generate electricity

Design Solution

Install photovoltaic panels on Weaver, Tisch, and KMC


PV array positions

Considerations

Promote alternative ways to generate electricity

Design Solution

Install photovoltaic panels on Weaver, Tisch, and KMC

Mounting Area: 21,056 sq. ft.

Total Panels: 1,392

Power Generated: 278kW


Power Generated: 278kW

Power Generated: 278kW

Power Consumed in Tisch Hall : 840kW

Power Consumed in Tisch Hall : 840kW

Save: 33% of power


Grant: $2,689,585

Pay$563,623

Total Cost: $3,253,208

Grant: $2,689,585

Total Cost: $3,253,208


PV Cost

Savings/Year

$563,623

$38,328

Payback Period: 14.7 years


Study

Analyze the daylighting conditions in Tisch Lobby

Calculate energy savings for a photosensor based system

Method

Agi32 - analyze daylighting conditions in the lobby

Ecotect

Excel – find critical point to locate photosensor

Daysim – calculate energy savings


Equinox – March 21st

9 AM

12 PM

3 PM

6 PM


Zone 1 Always on

  • Master Depth Daylighting Study

Zone 2 (time clock)

Zone 3 (photosenor)



Conclusion

  • Create Pride

  • Eliminate Depression

  • Provide Way-finding/Orientation

  • Improve Physical Health

  • Sustainable Systems

  • Function

Gould Plaza

Lounge

Tisch Hall

Plaza

Tisch Hall

Plaza

Plaza


Acknowledgement

Special Thanks

Perkins + Will

New York University

Industry Professionals

Advisors

Dr. Richard Mistrick

Professor Ted Dannerth

Professor Robert Holland

Professor Kevin Parfitt

Fellow AE classmates



ad