1 / 6

Efficient Power Line Construction for Renewable Energy: Helicopter Tower Lowering

Figure 1.1 showcases a helicopter lowering towers for high-voltage power lines, highlighting the need for building more lines to enhance renewable energy movement and efficiency. Figure 1.2 presents the projected timeline of Tesla's Gigafactory, a significant development in battery technology. Figure 1.3 illustrates the concept of the time value of money, while Figure 1.4 demonstrates differential analysis. Figure 1.5 explores marginal analysis, and Figure 1.6 delves into the risk and return trade-off.

genec
Download Presentation

Efficient Power Line Construction for Renewable Energy: Helicopter Tower Lowering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Figure 1.1 A helicopter lowers towers for high-voltage power lines into place. Many say the country needs to build more of these lines to move renewable power and become more efficient.

  2. Figure 1.2 Projected Timeline of Tesla’s Gigafactory.Source: “Assault on Batteries,” The Economist, June 14, 2014.

  3. Figure 1.3 Time value of money.

  4. Figure 1.4 Differential analysis.

  5. Figure 1.5 Marginal analysis.

  6. Figure 1.6 Risk and return trade off.

More Related