1 / 11

GFE at the NW Forecast Center Harold Opitz Hydrologist in Charge Northwest River Forecast Center

GFE at the NW Forecast Center Harold Opitz Hydrologist in Charge Northwest River Forecast Center. GFE at NWRFC Impetus. New direction by NWS Replacement for WR MM system Collaboration ISC capabilities Expansion to other modeling DHM. GFE at NWRFC Mechanics. Mechanical Hurdles

gaye
Download Presentation

GFE at the NW Forecast Center Harold Opitz Hydrologist in Charge Northwest River Forecast Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GFE at the NW Forecast CenterHarold OpitzHydrologist in ChargeNorthwest River Forecast Center

  2. GFE at NWRFCImpetus • New direction by NWS • Replacement for WR MM system • Collaboration • ISC capabilities • Expansion to other modeling • DHM

  3. GFE at NWRFCMechanics • Mechanical Hurdles • Can GFE run at an RFC? • Initial distribution on DX1 • Performance issues/Compete with CPU resources • Grid Resolution/Domain size • PowerPC attached to AWIPS production • Stand Alone GFE • ATAN Site

  4. GFE at NWRFC3-Phase Project • Experiment with Grids • GFE at an RFC? • PowerPC attached to AWIPS • Stand alone GFE • 3-Phase project • ATAN

  5. GFE at NWRFCPhase I • Parallel with Legacy System • Mitigate Performance issues • Generate Precip/Temp grid and point data • Explore “Smart” Tool and Formatter Development • Demonstrate ISC capabilities • Verification • Emulate WFO verification • BOIverify

  6. GFE at NWRFC • Emulate Current Legacy System Services • 10-day forecast Precip, Temp, Freeze Level • Day 1-3 & Day 4-10 • Forecast Production • Use Model Input - eg, GFS40, ETA12, DGEX • WFO Input - ISC • Blank screen • OR any mix of the above • Exercise ISC capabilities

  7. GFE at NWRFC Precipitation 10 days - 6 hr steps • 2.5 km • 604x644=388976 grid cells • Point data • Precip • Temp (max/min) • Freeze Levels • Mean Areal Precip (phase 2) • Mean Areal Temp (phase 2) • 10 days • 6 hour time steps Temp(mx) 10.5 days - 6 hr steps

  8. GFE at NWRFC • Daily Products • Formatters to SHEF encode

  9. GFE at NWRFC • Spring 2006 used GFE as Supplemental tool during April Through June • Fall 2006 has GFE moving up quickly in priority as an operational tool • Used extensively during all event in Nov/Dec • Priority Change due to new HAS staff • GFE remains “supplemental” in operations.

  10. GFE at NWRFCThe Other Phases • Phase 2 • Mean Areals directly from grid data • Apply PRISM techniques • Reverse ISC – Xmit RFC grids to WFOs… • Phase 3 • Operational? • Training?

  11. GFE at NWRFCTo Be Accomplished or What to do to be Operational • Verification • Training • Meteorologist / Hydrologist • Probabilistic / Ensemble • Support • Hardware/Software • Enhancement

More Related