Gridpp collaboration board
This presentation is the property of its rightful owner.
Sponsored Links
1 / 9

GridPP Collaboration Board PowerPoint PPT Presentation


  • 90 Views
  • Uploaded on
  • Presentation posted in: General

GridPP Collaboration Board. Wednesday 12 January 2005. Agenda. Minutes of Previous Meeting (14 July 2004) Actions arising CCLRC Investigate VAT exemption SL to notify CB of standard template talk for schools SL to provide briefing note for Tier-2 MoU Project Leader's report - Tony Doyle

Download Presentation

GridPP Collaboration Board

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Gridpp collaboration board

GridPP Collaboration Board

Wednesday 12 January 2005


Agenda

Agenda

  • Minutes of Previous Meeting (14 July 2004)

  • Actions arising

    • CCLRC Investigate VAT exemption

    • SL to notify CB of standard template talk for schools

    • SL to provide briefing note for Tier-2 MoU

  • Project Leader's report - Tony Doyle

  • Project Manager's report - Dave Britton

  • Tier-2 Status – Steve Lloyd

  • Beyond GridPP2 – Tony Doyle

  • Beyond GridPP2 - Discussion

  • AOB

  • Next meeting (21 or 22 June ?)

GridPP CB Meeting 12 Jan 2005


Tier 2 board

Tier-2 Board

Tier-2 Board Membership

Chair:Steve Lloyd

4 Tier-2 Regional Management Board Chairs:

Dave Colling, Roger Jones, Phil Clark, Jeff Tseng

4 Tier-2 Technical Coordinators:

Owen Maroney, Alessandra Forti, Fraser Speirs, Pete Gronbech

Production Manager: Jeremy Coles

Tier-1 Board Representative: John Gordon

User Board Representative: Roger Jones

Deployment Board Representative: Dave Kelsey

GridPP CB Meeting 12 Jan 2005


Tier 2 mou

Tier-2 MoU

Separate MoUs in each Tier-2 between institutes gave local Chair authority to sign the MoU between GridPP and the 4 Tier-2 Centres.

GridPP CB Meeting 12 Jan 2005


Tier 2 mou status

Tier-2 MoU Status

GridPP – Tier-2 MoU

ScotGrid MoU

SouthGrid MoU

London MoU

NorthGrid MoU

Brunel

Lancaster

Durham

Birmingham

Imperial

Liverpool

Edinburgh

Bristol

Manchester

Cambridge

QMUL

Glasgow

Sheffield

Oxford

RHUL

UCL

RAL PPD

Warwick

GridPP CB Meeting 12 Jan 2005


Hardware posts

Hardware Posts

As of 11 January 2005

GridPP CB Meeting 12 Jan 2005


Experimental shares

Experimental Shares

Attempted to determine what the ‘fair shares’ of the Tier-2 resources are.

e.g.

Linear Collider

Multiply each resource by HEP Share and experiment share (+ time/belief weight) and integrate over all institutes.

GridPP CB Meeting 12 Jan 2005


Experimental shares1

Experimental Shares

Probably needs to be updated yearly

If overall Tier-2 resources were used in these proportions then (on average) everyone's kit would be used for what it was bought for.

GridPP CB Meeting 12 Jan 2005


Status

Status

Challenge now is to deliver the resources and to be able to monitor and schedule them

From GIIS – Some numbers are x2 too high (hyperthreading)

(LCG only – doesn't include contributions to BaBar, CDF, D0)

Number of UK Tier-2 'CPU's

HEFCE SRIF2 Procurement issues

Configuration Issues

+930 at Tier-1 gives UK:

2381 CPUs out of 9122 in 94 sites in 31 countries

GridPP CB Meeting 12 Jan 2005


  • Login