Hes status report 7oct 08
This presentation is the property of its rightful owner.
Sponsored Links
1 / 4

HES Status Report 7Oct ’08 PowerPoint PPT Presentation


  • 55 Views
  • Uploaded on
  • Presentation posted in: General

HES Status Report 7Oct ’08. EDC1 Wire Study 1. EDC1+2 による FP 分解能. Tight Cut (abs(XFP)<10). No FP Cut. 参考: Wire を f=1 mm, Cu にした場合 Tight Cut で dp /p=2.3 (FWHM). EDC1 Wire Study 2. No Wire 3682. Al Wire 3830. Cu Wire 3781. Summary & Next. EDC1 のワイヤーは Cu+Be で問題なさそう。

Download Presentation

HES Status Report 7Oct ’08

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Hes status report 7oct 08

HES Status Report7Oct ’08


Edc1 wire study 1

EDC1 Wire Study 1

EDC1+2によるFP分解能

Tight Cut(abs(XFP)<10)

No FP Cut

参考:Wireをf=1mm, Cuにした場合Tight Cutでdp/p=2.3 (FWHM)


Edc1 wire study 2

EDC1 Wire Study2

No Wire

3682

Al Wire

3830

Cu Wire

3781


Summary next

Summary & Next

  • EDC1のワイヤーはCu+Beで問題なさそう。

  • EDC1の出発は明日とのこと。Tracking Codeを入手したらメールします。

  • 核理研報告書作成中。明日位に一通り終わると思うのでこれもメールします。

  • Matrix TuningにSSの部分を入れている。めんどくさい。100%自分で書いたプログラムなのに意味不明(;´Д`)

  • 金・土はSANEシフト。

☆OMAKE☆

動くリス