Infiltration Trenches

Infiltration Trenches. Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection. Diversion for WQ v Stilling pool and spreader Sedimentation channel or chamber Overflow weir or protective covering layer Infiltration trench with gravel Overflow & outlet. Pavement edges

gamma
Download Presentation

Infiltration Trenches

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection

  2. Diversion for WQv Stilling pool and spreader Sedimentation channel or chamber Overflow weir or protective covering layer Infiltration trench with gravel Overflow & outlet Pavement edges < 5 acres drainage ≤ 2 day drawdown No hotspot application 2-4 feet to water table – close may need to do mounding computation Setbacks for groundwater protection WQv diverted into trench Major ComponentsInfiltration Trench

  3. Compute WQv and if applicable Cpv Screen site Screen local criteria Compute Qwq Size diversion Size filtration area Size pretreatment area Size overflow 24-48 hour drawdown Fill time estimate of 2 hours is normal Porosity = 0.32 If pretreatment facility size for 25% WQv Design Steps

  4. n=0.32 d=depth in feet k=percolation rate (in/hr) T = fill time = 2 hrs. Gravel Trench Volume A = WQv/(nd+kT/12) = WQv/(0.32d+k/6)

  5. Gravel Trench Area Per Acre Percent Impervious k=1 in/hr (sandy loam), n=0.32, T=2 hrs

  6. Erosion & Sediment Control Considerations • Ensure sediment is trapped before entering filter area • Installation sequencing is important • After adjacent areas are stabilized • Converted temporary sediment basins (Sd3) • Provide pretreatment with sediment basin or filter strip

  7. An example of Infiltration trench design Taken from Appendix D4

  8. Calculated Volumes….

  9. Step 1. Determine if the site conditions are appropriate

  10. Step 1. Determine if the site conditions are appropriate

  11. Step 2. Calculate WQv peak discharge (Qwq)WQv = 8102 cf, P = 1.2”, Qwv = WQv/Area = 0.74”CN = 95…Ia=(1000/CN-10)…Ia/P…qu…Qwq • Back out curve number • Calculate unit peak discharge using SCS simplified peak figures • Calculate peak discharge as: Qwq = 2.2 cfs

  12. Step 3. Size the infiltration trench • n=0.32 • D= 5 feet • k=1 (in/hr) • T = 2 hrs. • A = 8,102 (32.2x5)+(1x2/12) • A = 4,586 sf • Max. width = 25 ft • L = 4,586/25 = 183 ft A = WQv/(nd+kT/12) = WQv/(0.32d+k/6) • n=porosity • d=depth in feet • k=percolation rate (in/hr) • T = fill time

  13. Step 3. Size Point A flow diversion structure Q25 = 17cfs, WQv= 2.2 cfs 2/3 of the flow to Point A (1/3 to Point B) Point A: Q25= 5.7cfs, WQv = 0.73 cfs Design orifice for low flow (0.73 cfs) • Set max. head = 1.5’ • Q=CA(2gh)1/2…C=0.6…A=0.12 sf (4”dia.) …use 6-inch pipe w/ gate valve

  14. Step 3. Size Point A flow diversion structure Q25 = 17cfs, WQv= 2.2 cfs 2/3 of the flow to Point A (1/3 to Point B) Point A: Q25 = 5.7cfs, WQv = 0.73 cfs Design weir for 25-yr flow (5.7 – 0.73 = 5cfs) • Set max. head = 1.0’ • Q=CLH3/2…C = 3.1…L=1.6 ft

  15. Coastal Challenges… See Handouts for LID Practices…

  16. Coastal Challenges… See Handouts for LID Practices…

  17. Coastal Challenges… See Handouts for LID Practices…

  18. Coastal Challenges… See Handouts for LID Practices…

  19. Coastal Challenges… See Handouts for LID Practices…