Ship to ship lng transfer technology
This presentation is the property of its rightful owner.
Sponsored Links
1 / 54

Ship to Ship LNG Transfer Technology PowerPoint PPT Presentation


  • 626 Views
  • Uploaded on
  • Presentation posted in: General

Ship to Ship LNG Transfer Technology. Excelsior Class EBRV 138,000 m 3. LNG STS Transfer Double Banked at Anchor. LNG STS Configurations. LNG transferred across dock from LNG Carrier Gas Delivered from EBRV to facility via HP Gas Arm. LNG transferred from LNG Carrier to EBRV down the dock

Download Presentation

Ship to Ship LNG Transfer Technology

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ship to ship lng transfer technology

Ship to Ship LNG Transfer Technology


Excelsior class ebrv 138 000 m 3

Excelsior Class EBRV138,000 m3


Lng sts transfer double banked at anchor

LNG STS TransferDouble Banked at Anchor


Lng sts configurations

LNG STS Configurations

LNG transferred across dock from LNG Carrier

Gas Delivered from EBRV to facility via HP Gas Arm

LNG transferred from LNG Carrier to EBRV down the dock

Gas Delivered from EBRV to facility via HP Gas Arm

LNG

Gas

LNG

Gas

LNG Transferred via Ship to Ship Transfer

Gas Delivered from EBRV to facility via HP Gas Arm

LNG

Gas


Lng lightering

LNG Lightering


Double banked at bahia blanca

Double-Banked at Bahia Blanca


Bah a blanca gasport argentina

Bahía Blanca GasPort(Argentina)

  • Dockside LNG regasification

    • Utilizes ship-to-ship LNG transfer with continuous natural gas send out

    • Capable of 400 mmscfd throughput (closed-loop mode)

    • Provides seasonal service during Argentine winter

  • Short development time and low cost

    • Final investment decision to in-service in less than 6 months

    • Fixed facilities cost <5% of a land-based LNG terminal

  • Project partners are YPF and Repsol-Gas Natural

Gas offloading arm

Bahía Blanca GasPort

Excelsior docked at the Bahía Blanca GasPort


Lng sts transfer risk management

LNG STS TransferRisk Management

L N G

means

Let’s Not Guess


Ship to ship lng transfer technology

LNG STS TransferPartners /Development Basis

  • Developed with partners

    • Exmar NV / Exmar Offshore USA

    • Skaugen PetroTrans

  • STS Operation must meet applicable standards

    • IMO - Gas code

    • Class approvals by BV for LNG-RV’s, focus unrestricted liquid levels / all shipboard systems.

    • IACS rules for LNGC: - Liquid level restrictions due to sloshing loads

    • OCIMF / SIGTTO

      • Ship to Ship Transfer Guide (Liquefied Gases) Second Edition / Draft LNG STS Transfer Guidelines

      • SIGTTO LNG specific STS Transfer Considerations

    • USCG: 33 CFR 156 Subpart B and C

    • EN 1474 - 2 standards for cryogenic transfer systems


Lng sts transfer initial engineering feasibility

LNG STS TransferInitial Engineering & Feasibility

  • By BUREAU VERITAS

    • Target: assess measurable operational criteria to avoid sloshing damage in LNG-C due to any level of partial filling during LNG transfer

    • Conclusion: LNG-C maximum roll angle 2° ; keep heading +/-30° into direction of significant waves

    • Hs < 2.0 m

  • BY GTT

    • Target: determine the maximum LNG transfer flow rate compatible with the treatment capacity of the increased Boil-Off Gas (BOG)

    • Conclusion: Up to 6,000 m3/h with 60 mbar cargo tank pressure difference between LNG-RV and LNG-C

  • HAZID / HAZOP : Original STS design

    • Lloyds Register / BMT


Lng sts transfer risk based assessments

LNG STS TransferRisk Based Assessments

  • Computer Motion Simulation

    • Exmar Offshore / Yokohama Rubber Co. Ltd.

  • Maneuvering Simulations

    • Ship Maneuvering Simulator Training Center – Trondheim / Antwerp Maritime Academy / Lloyds Register / South Tyneside Technical College / SIPORT – Madrid

  • STS Operations Plan

    • Skaugen PetroTrans

  • Dynamic Mooring Analysis

    • Tension Technologies International

  • Operation Manuals for rigging STS equipment

    • Developed based on extensive practical tests on board

  • HAZID / HAZOP : final review

    • Including operation manuals, training and procedures

      (Lloyds Register)


Ship to ship lng transfer technology

LNG STS Transfer

Manifold Configuration

3 liquid lines

6 hoses

Blank flange

1 vapour line

2 hoses

Feeder ship

LNGRV

Spool pieces

Saddles

Flexible hoses

Dry-Break ERC

Water curtain & bath


Lng sts transfer gear general arrangement

LNG STS TransferGear General Arrangement


Lng sts transfer equipment class approvals

LNG STS Transfer Equipment Class Approvals

  • Reducing ‘Y’ Spool Pieces

    • Class approval (BV)

  • Emergency Release Couplings

    • Type approval (BV)

  • LNG Cargo Transfer Hoses

    • Type approval (DNV)

  • Manifold platform structural verification

    • Class approval (BV)

  • Hose Support Saddle verification

    • Class approval (BV)


Lng sts transfer cargo transfer hose

LNG STS TransferCargo Transfer Hose

  • Stainless Steel End Fittings

  • Epoxy Filled & Swaged

  • Standard ANSI 8” Flange

  • Type Approved by Class for STS Transfer of LNG

  • EN 1474 Compliant


Lng sts transfer cargo transfer hose1

LNG STS TransferCargo Transfer Hose

  • 57 Layers of Polyethylene

    • Film and Fabric

  • Inner / Outer Stainless Mandrel

  • Electrically Continuous

  • Failure Mode

    • Leak before fail

  • 400,000 Cryogenic Cycles

  • Comprehensive testing by TNO

  • Flow tests at Nikisso w/ up to 1500 m3/hr


Lng sts transfer cargo transfer hose2

LNG STS TransferCargo Transfer Hose

  • Composite Hose

  • 8” Diameter

  • 15 m Length

  • 0.65 m Min. Bend Radius

  • 300 Liter Volume per Hose

  • DNV Type Approved

  • Fit for Purpose

  • Light and Flexible


Lng sts transfer cargo hose storage

LNG STS TransferCargo Hose Storage

  • Hose Storage on EBRV

  • Test Blinds on Hose Ends

  • Internal Nitrogen Blanket

  • Test, Inspection, Records


Lng sts transfer cryogenic hose impact test

LNG STS TransferCryogenic Hose Impact Test

  • 224 kg x 1.5 m

  • 3 bar LN2

  • No Leakage


Lng sts transfer sudden impact

LNG STS TransferSudden Impact!


Lng sts transfer cryogenic hose impact test1

LNG STS TransferCryogenic Hose Impact Test


Lng sts transfer cryogenic hose crush test

LNG STS TransferCryogenic Hose Crush Test

  • 200 mm Crush Plate

  • 270 kN Load @ 3 bar LN2

  • 106 bar Pressure Test

  • Severe Leakage – No Burst


Lng sts transfer cryogenic hose crush test1

LNG STS TransferCryogenic Hose Crush Test


Lng sts transfer cryogenic hose pressure test

LNG STS TransferCryogenic Hose Pressure Test


Lng sts transfer cryogenic hose integrity

LNG STS TransferCryogenic Hose Integrity

  • 50% Damage of Outer SUS Wire

  • 6 bar – No Leakage

  • 34 bar – Burst Pressure – No Jetting


Lng sts transfer cryogenic hose cycling

LNG STS TransferCryogenic Hose Cycling

  • 400,000 Cycles

  • 2 Meter Stroke

  • Certified by TNO


Lng sts transfer hose support saddle

LNG STS TransferHose Support Saddle

  • One per Hose Pair – Total Four Saddles on Each Vessel

  • Provides Protection and Support in Way of Hand Rails

  • Maintains Adequate Bend Radius of Hose

  • Transfer Loads from Hoses to Manifold Deck

  • Chafe Protection for Hoses

  • 8 mm Marine Aluminum

  • FMEA on saddle


Lng sts transfer hose support saddle1

LNG STS TransferHose Support Saddle


Lng sts transfer reducing wye spool pieces

LNG STS TransferReducing Wye Spool Pieces

  • 16 “ x 12” x 8” (2)

  • Standard ANSI 150# Flanges

  • BV Class Approved

  • Handled by Crane Horizontally


Lng sts transfer specific controls and safety

LNG STS Transfer Specific Controls and Safety

  • Emergency Shut Down (ESD)

    • Pneumatic ESD systems connecting LNGC with EBRV

    • Electric and / or Fiber Optic umbilical available

  • Additional Water Curtain System at both manifold areas

    • Protect ships’ trunk deck / cargo tank covers from accidental LNG release

    • Includes ‘water bath’ on main deck under manifold area


Lng sts transfer water curtains bath

LNG STS Transfer Water Curtains & Bath

  • Additional water curtain rigged under each manifold

  • Water bath installed on deck under manifold using dams


Lng sts transfer emergency release couplings

LNG STS Transfer Emergency Release Couplings

Emergency Release Couplings (ERC)

  • KLAW quick release couplings => quick disconnect of hoses in emergency situations

  • Remote operation

  • ‘Dry Break’

  • Extensive test in cryogenic conditions for STS type approval

  • Actuator reinforced for cryogenic operations


Lng sts transfer dry break emergency release coupling

LNG STS Transfer‘Dry-Break’ Emergency Release Coupling


Lng sts transfer emergency release coupling

LNG STS TransferEmergency Release Coupling

  • BV Class Approved

  • Function Tested w/ 1” ‘Hard’ Ice

  • Liquid Nitrogen @ 10 bar


Lng sts transfer erc actuated

LNG STS TransferERC Actuated

0.8 Liter Volume Between The Disks


Lng sts transfer hose brake system

LNG STS TransferHose Brake System


Lng sts transfer equipment controls and safety

LNG STS TransferEquipment, Controls and Safety

  • Emergency Shut Down (ESD)

    • Pneumatic ESD systems connecting LNGC with EBRV

    • Electric and Fiber Optic umbilical available

  • Additional Water Curtain System at both manifold areas

    • Protect ships’ trunk deck / cargo tank covers from accidental LNG release

    • Includes ‘water bath’ on main deck under manifold area

  • Emergency Release Couplings

    • KLAW quick release couplings offer quick disconnect of hoses in emergency situations

    • Remote operation

    • ‘Dry Break’


Lng sts transfer fender arrangement

LNG STS TransferFender Arrangement


Lng sts transfer approach maneuver

LNG STS TransferApproach Maneuver


Lng sts transfer coming alongside

LNG STS TransferComing Alongside


Lng sts transfer mooring operation

LNG STS TRANSFERMooring Operation


Lng sts transfer cargo hoses rigged

LNG STS TransferCargo Hoses Rigged


Lng sts transfer gear placement

LNG STS TransferGear Placement


Lng sts transfer hose connection

LNG STS TransferHose Connection


Lng sts transfer line cooldown

LNG STS TransferLine Cooldown


Lng sts transfer projected time line

LNG STS TransferProjected Time Line

  • Rigging Fenders 1 hr

  • Approach Maneuver1 hr

  • Mooring 2 hrs

  • Pre-Transfer Meeting / Gauging1 hr

  • Connect Hoses2 hrs

  • Line Cooldown1-½ hr

  • ESD / ERC Tests½ hr

  • Cargo Transfer (130,000 m3 @ 5000 m3/hr)26 hrs

  • Hose Drain / Purge / Disconnect4 hrs

  • Unmooring / Vessel Separation1 hr

  • Fender Recovery1 hr

    Total Projected Time41 hrs


1 st commercial sts transfer scapa flow 8 9 february 2007

1st Commercial STS TransferScapa Flow – 8-9 February 2007


Lng sts transfer site specific assessments

LNG STS TransferSite Specific Assessments

  • Simulator training with Scapa Flow Pilots and EBRV senior staff at South Shields Technical College (UK)

  • Ballast Water Management issues regarding environmental preservation

  • Waterway management risk assesment with Orkney Harbor Authority, Scotish National Heritage and BMT-Isis

  • Simulator training with Bahia Blanca Pilots and EBRV senior staff at SiPort

  • Risk assessment of non-standard conditions prior to STS operation

    • Primarily for weather considerations and forecasted conditions


Lng sts transfer full rate cargo transfer 5 950 m 3 hr

LNG STS TransferFull Rate Cargo Transfer (5,950 m3/hr)


Lng sts transfer routine inspections

LNG STS TransferRoutine Inspections


Lng sts transfer drain purge hoses

LNG STS TransferDrain & Purge Hoses


Lng sts transfer ctms

LNG STS TransferCTMS


Lng sts transfer statistics

LNG STS TransferStatistics


Lng sts transfer

LNG STS Transfer


  • Login