Capacity release offer maintenance enhancements
This presentation is the property of its rightful owner.
Sponsored Links
1 / 13

Capacity Release Offer Maintenance Enhancements PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on
  • Presentation posted in: General

Capacity Release Offer Maintenance Enhancements. Capacity Release Enhancement. The LINK system has new functionality that will help releasing shippers create their capacity releases.

Download Presentation

Capacity Release Offer Maintenance Enhancements

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Capacity release offer maintenance enhancements

Capacity ReleaseOffer Maintenance Enhancements


Capacity release enhancement

Capacity Release Enhancement

The LINK system has new functionality that will help releasing shippers create their capacity releases.

  • Apply a Percentage of quantity available to segments by entering a quantity and allowing the system to calculate based on the Zone Boundary Exit Quantity Available.

  • Filter segments by Zone Boundary Entry/Exits.

  • Filter segments by Zone Boundary Entry/Exits that are out of balance.


Capacity release enhancement1

Capacity Release Enhancement

  • Offer Maintenance - Segments Tab – Apply ZB Qty Button

    • This button will allow the customer to apply a percentage of the quantity available for all the segments in a given zone which is filtered down to the individual path (24 or 30 inch), based on the Quantity Available in the Zone Boundary Exit segment for that zone.

    • The releasing shipper will need to first filter down to the individual path for a given zone using the View By filter, as shown on the next two slides.


Capacity release enhancement2

Capacity Release Enhancement

  • Segments – Filtering Criteria

    A customer may select how it wants to view segment entitlements. Entitlements can be filtered by Type, Zone ID, Lateral Type, Diff Ind, and P/L Sect (Pipeline Section).

Type – On Texas Eastern customers can view segments by 24 inch path, 30 inch path, Entry/Exits, ZB – All and ZB – Out Bal for the zones being released. Type will default to All. The releasing shipper will select 24 or 30 inch path .


Capacity release enhancement3

Capacity Release Enhancement

  • Segments – Filtering Criteria

    • Zone Id - A customer may view and assign segments by zones on Texas Eastern (STX, WLA, ELA, ETX, 1, 2, 3). Segments can also be filtered and assigned by the Access Area or the Market Area. The releasing shipper will filter on an individual Zn ID.


Capacity release enhancement4

Capacity Release Enhancement

  • Offer Maintenance - Segments Tab – Apply ZB Qty Button

    Segments must be filtered to Path and Zone ID as shown below.


Capacity release enhancement5

Capacity Release Enhancement

  • Offer Maintenance - Segments Tab – Apply ZB Qty Button

    Click on the Sel box to select all segments or choose individual segments. The Apply ZB Qty button will activate.


Capacity release enhancement6

Capacity Release Enhancement

  • Offer Maintenance - Segments Tab – Apply ZB Qty Button

  • Enter the quantity and click on the Apply ZB Qty as shown in the red boxes below.


Capacity release enhancement7

Capacity Release Enhancement

  • Offer Maintenance - Segments Tab – Apply ZB Qty Button

  • Notice that the Min and Max offer quantity of 270 was applied to the ZB exit. All other segments that were selected Min and Max offer quantity are 10% of Qty Avail for that segment. This is calculated by LINK 270/2699 (ZB Exit Qty Avail) = 10%.


Capacity release enhancement8

Capacity Release Enhancement

  • Offer, Bid and Award Maintenance - Segments Tab

    New Filters Available in the View By: Type Filter

    ZB – All – This filter will display Zone Boundary Entry and Exit segments matched by the zone boundary that is being crossed. In the View By: filter line in the type filter dropdown choose ZB – ALL as shown below. LINK will display as shown on the following page.


Capacity release enhancement9

Capacity Release Enhancement

  • Offer, Bid and Award Maintenance - Segments Tab

    View By: Type Filter – ZB - ALL

    Notice that each zone boundary exit is matched with the corresponding entry.


Capacity release enhancement10

Capacity Release Enhancement

  • Offer, Bid and Award Maintenance - Segments Tab

    New Filters Available in the View By: Type Filter

    ZB – Out Bal – This filter will display only Zone Boundary Entry and Exit segments matched by the zone boundary that is being crossed that are out of balance. In the View By: filter line in the type filter dropdown choose ZB – Out Bal as shown below. LINK will display as shown on the following page.


Capacity release enhancement11

Capacity Release Enhancement

  • Offer, Bid and Award Maintenance - Segments Tab

    View By: Type Filter – ZB – Out Bal

    Notice that each zone boundary exit is matched with the corresponding entry that is out of balance.


  • Login