An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENERGY CONSERVATION WORKSHOPON ENERGY EFFICIENCY S. R. Meena AEE/N.W.Rly./BIKANER

  2. Divisional Railway HospitalLalgarh, Bikaner

  3. Divisional Railway HospitalLalgarh, Bikaner • The Divisional Hospital of Bikaner Division situated at Lalgarh was commissioned on 18.05.1967. • It is a double story building consisting of 13 nos. wards, ICU, OPD, Indoor, Operation theatre, Laboratory, X-ray & USG, Dental unit, Chest Ward and Physiotherapy unit. • The indoor patient capacity is 100 beds and approx. 300 patients are being treated daily as out door patients. • The complete hospital is connected with backup DG supply to ensure uninterrupted power supply. • Water coolers with water purifiers have been provided to facilitate purified cold water during hot summer period of Bikaner.

  4. Divisional Railway HospitalLalgarh, Bikaner • At the roof of the hospital, Solar water heater is provided for kitchen & bathrooms of all wards. • Total built-up area of hospital is 5316 sqm. • Air conditioned area is 267.36 sqm. • Non air conditioned area is 5048.64 sqm. • Building operating hours per year is 8640 Hrs.

  5. Energy scenario • The source of Electrical Energy for hospital is 11 kV supply received from JdVVNL (SEB) at railway substation Lalgarh. • The connected load - 210 Kw (2008-09) - 215 Kw (2009-10) • Average power factor - 0.99

  6. Comparison of Energy Consumption

  7. ELECTRICITY COST

  8. Specific Energy Consumption (SEC)

  9. Comparison of Energy Consumption • Total Electrical consumption/ Total built-up area (Kwh/sqm) (Year 2008-09) – 28.07 (Year 2009-10) – 24.07 % saving over year 2009-10 is 14.25% • Total thermal energy consumption/ total built-up area (MKcal/sqm) (Year 2008-09) – 0.002079 (Year 2009-10) – 0.001883 % saving over year 2009-10 is 9.427%

  10. ENERGY MANAGEMENT POLICY & SETUP Railway’s Organization for Energy Efficiency and Renewable Energy (RE) Management Group on this Railway, monitor the energy consumption intensively. Electrical staff are regularly counseled about energy conservation & its importance.

  11. CEE as Chairman CEGE as Chief Energy Manager Dy. CEE/Plg.&EM Energy Management Co-ordinator at HQ Sr.DEE Ajmer Sr.DEE Bikaner Sr.DEE Jaipur Sr.DEE Jodhpur DyCEE/WS Ajmer DyCEE/W Jodhpur WAEE Bikaner At Divisional Level Including Railway Hospitals At Workshop Level ORGANIZATION OF ENERGY EFFICIENCY AND RENEWABLE ENERGY (RE) MANAGEMENT GROUP

  12. Monitoring of Energy consumption • Daily monitoring of Energy consumption by Energy management group. • Energy conservation week is observed every year in the month of December. • Activities during the week :- • Display of banners & posters in HQ office, Divisional offices & in workshops at prominent places and locations. • Awareness programme by showing message on Home page of website. • Message on telephone. • Seminar on Energy conservation in divisional offices & workshops. • Essay, Slogan writing & drawing competition on Energy conservation at HQ and divisional level. • Releasing of souvenir on Energy Conservation. • Organizing workshop on Energy conservation at major stations, colonies, hospitals by Electrical supervisors. • Distribution of GMs appeal.

  13. ENERGY MANAGEMENT POLICY & SETUP • Adopt Cleaner and Eco - friendly Renewable Energy (RE) sources on Railways. • Striving to reduce specific energy consumption (SEC) by continuously taking energy efficiency improvement measures & minimizing energy wastages. • To carry out internal and external Energy Audits on regular basis to identify areas for improvement. • Involvement of employees at all levels in the energy conservation efforts. • Extensive use of 3 star () & above labeled electrical products/equipments.

  14. Implemented measures • Provision of Energy Efficient T-5 fittings

  15. Provision of T-5 Luminaries at Lalgarh Hospital Ward

  16. 322 nos. Energy efficient T-5 fittings were provided in various wards and offices in Divisional Railway Hospital, Lalgarh during the year to conserve energy. • Year of implementation : 2009-10 • Total investment : Rs.1,56,492 /- • Energy consumption before : 46368 Kwh • Energy consumption after : 32458 Kwh • First year energy cost savings : Rs.73,167/- (Energy Tariff – 5.26 Rs./Kwh) • Payback period approx. : 2 Years

  17. Implemented measures • Provision of Solar Water Heater

  18. 03 nos. Solar water heater, having total capacity of 1900 LPD were provided at various locations in Divisional Railway Hospital, Lalgarh during the year to conserve energy. • Year of implementation : 2009-10 • Total investment : Rs.4,27,500/- • Energy consumption before : 4320 Kwh + 981.4 Kg (LPG). • Energy consumption after : 908.8 Kg (LPG) • First year energy cost savings : Rs.24,538/- (Energy Tariff – 5.26 Rs./Kwh, Rs. 25/Kg)

  19. Other Suggestion for Energy conservation • Use of BEE approved star rated equipments i.e. AC’s, fans, pumps etc. • Use of electronic fan regulators. • Use of occupancy sensors in offices/ halls. • Use of natural light inside rooms as per ECBC. • Solar air conditioners. • Use of LED’s for corridor lighting, nights lamps, indicators etc. • Monitoring of MDI, Contract demand. • Use of proper capacity of transformer.