Lmc 25 5 th august
This presentation is the property of its rightful owner.
Sponsored Links
1 / 20

LMC 25 - 5 th August PowerPoint PPT Presentation


  • 56 Views
  • Uploaded on
  • Presentation posted in: General

LMC 25 - 5 th August. Conclusion: 3.5 TeV rising towards 5 TeV later. LMC 26. Steve on the last LMC and the 3.5 TeV decision A first look at 3.5 TeV - Mike. Initial operating energy of the LHC. Steve. 3.5 TeV – prelim. Acknowledgements: Ralph Assmann Werner Herr.

Download Presentation

LMC 25 - 5 th August

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Lmc 25 5 th august

LMC 25 - 5th August

Conclusion: 3.5 TeV rising towards 5 TeV later

BCWG - LMC update etc


Lmc 25 5 th august

BCWG - LMC update etc


Lmc 25 5 th august

BCWG - LMC update etc


Lmc 25 5 th august

BCWG - LMC update etc


Lmc 26

LMC 26

Steve on the last LMC and the 3.5 TeV decision

A first look at 3.5 TeV - Mike

BCWG - LMC update etc


Initial operating energy of the lhc

Initial operating energy of the LHC

Steve

BCWG - LMC update etc


3 5 tev prelim

3.5 TeV – prelim.

Acknowledgements:

Ralph Assmann

Werner Herr


Intensity limit collimation

Intensity limit - collimation

6 e13

Ralph Assmann

BCWG - LMC update etc


Intensity collimators and beam beam

Intensity – collimators and beam-beam

6 e13

Ralph Assmann

BCWG - LMC update etc


Limit stored energy versus beam energy

Limit stored energy versus beam energy

Ralph Assmann

BCWG - LMC update etc


Beta no angle

Beta* - no angle

Werner Herr

BCWG - LMC update etc


Beta with crossing angle

Beta* - with crossing angle

Werner Herr

BCWG - LMC update etc


Crossing angle versus beta

Crossing angle versus beta*

Werner Herr

BCWG - LMC update etc


Crossing angle lrbb v energy

Crossing angle – LRBB v. energy

BCWG - LMC update etc


Peak luminosity

Peak luminosity

BCWG - LMC update etc


Plugging in the numbers 3 5 tev

Plugging in the numbers – 3.5 TeV

BCWG - LMC update etc


Plugging in the numbers with a step in energy

Plugging in the numbers with a step in energy

BCWG - LMC update etc


Step up in energy

Step up in energy?

BCWG - LMC update etc


Latest schedule

Latest Schedule

BCWG - LMC update etc


Lmc 25 5 th august

± first LHC beam

BCWG - LMC update etc


  • Login