Future of European ISOL. Peter Butler. ISOL in Europe. CRC, Louvain-la-Neuve ( 1989-2008). SPIRAL, GANIL (2001). DRIBS, Dubna. REX-ISOLDE, CERN ( 2001). EXCYT, Catania (2006). World ISOL. Next generation ISOL facilities in Europe. SPIRAL II. EURISOL. SPES. HIE-ISOLDE.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Future of European ISOL' - freya


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Future of european isol
Future of European ISOL

Peter Butler

Coseners meeting Sept 10-11 2008


Isol in europe
ISOL in Europe

CRC, Louvain-la-Neuve

( 1989-2008)

SPIRAL, GANIL

(2001)

DRIBS, Dubna

REX-ISOLDE, CERN

( 2001)

EXCYT, Catania

(2006)

Coseners meeting Sept 10-11 2008


World isol
World ISOL

Coseners meeting Sept 10-11 2008


Next generation isol facilities in europe
Next generation ISOL facilities in Europe

SPIRAL II

EURISOL

SPES

HIE-ISOLDE

Coseners meeting Sept 10-11 2008


HIE-ISOLDE CERN

HIE-LINAC

RFQ

Existing

IH-structure

Existing

7 & 9-gap

high-b

high-b

high-b

high-b

300 keV

1.2 MeV/u

2.8 MeV/u

4.5 MeV/u

6 MeV/u

8 MeV/u

10 MeV/u

low-b

low-b

cavity

low-b

solenoid

diagnostic box

high-b

Coseners meeting Sept 10-11 2008


HIE-ISOLDE timeline

Solid state RILIS is now installed

RFQ cooler (ISCOOL) ready for exploitation

SC LINAC 10 MeV/u construction 2009-2013

EBIS, new RFQ Cooler, HRS upgrade 2011-2013

HIGH-POWER TARGET UPGRADE 2011-2015

Coseners meeting Sept 10-11 2008


SPIRAL-2 GANIL

GANIL/SPIRAL 1 today

CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for ff)

DESIR Facility

low energy RIB

Fission Production Cave

Up to 1014fiss./sec.

Phase 2

HRS+RFQ Cooler

Production Cave for other beams

Transfer, fusion-evap,

A/q=3 HI source

Up to 1mA

LINAC

Phase 1

AEL High intensity stable HI beams up to 14.5 A MeV

A/q=6 Injector

option

A/q=2 source

p, d, 3,4He 5mA


RIB production SPIRAL-2

DESIR

Coseners meeting Sept 10-11 2008



SPES LEGNARO

Coseners meeting Sept 10-11 2008


SPES

UCx target

40 MeV p driver

Coseners meeting Sept 10-11 2008


EURISOL: GANIL?

CIME would be replaced by a 100 MeV/u postaccelerator


EURISOL: CERN?

Coseners meeting Sept 10-11 2008


Low Power SPL (CERN)

(1.4 GeV 50 kW to HIE-ISOLDE)

High Power SPL (CERN)

(1.4 GeV 3 MW to EUR-ISOLDE)

Earliest 2020

Coseners meeting Sept 10-11 2008


EURISOL SITE COMPARISON COMMITTEE

Alan Shotter (chair)

Alex Mueller (IN2P3)

Giacomo Cottone (INFN)

Don Geesaman (ANL)

Steve Myers (CERN)

CERN, RAL, Legnaro, GANIL

EURISOL Users Group

Angela Bonacorrso (Italy, chair)

Dieter Ackermann (Germany),

Bertram Blank (France),

Giacomo De Angelis (Italy),

Ari Jokinen (Finland),

Marek Lewitowicz (France),

Robert Page (UK),

Berta Rubio (Spain),

Michael Thoennessen (USA)

Coseners meeting Sept 10-11 2008


Finis
FINIS

Coseners meeting Sept 10-11 2008