1 / 5

SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08

SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08. MTest. MCenter. KTeV Hall (proposed for E906). P2. P1. MI52. P1  P2 . 3 km beam line from MI52 to MT6 and MC7 2.5 km from MI52 to KTeV Hall http://home.fnal.gov/~chuckb/KTeVBeam.ppt.

freja
Download Presentation

SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 MTest MCenter KTeV Hall (proposed for E906) P2 P1 MI52 P1  P2  3 km beam line from MI52 to MT6 and MC7 2.5 km from MI52 to KTeV Hall http://home.fnal.gov/~chuckb/KTeVBeam.ppt

  2. 120 GeV proton beam to the KTeV Hall • An 800 GeV proton beam which created a secondary neutral kaon beam was most recently delivered to KTeV hall in ~1999 • The 1999 beam line contained one large superconducting string of dipoles. Since then, the lab has decommissioned the cryogenic system in the Switchyard. Fortunately, we can deliver 120 GeV beam with normal magnets (after some reconfiguration). • The renovation of the Switchyard to deliver an intense 120 GeV proton beam to the KTeV Hall will be an Accelerator Division Project. It can be done mostly while the Tevatron is running.

  3. Extracted 120 GeV proton beam line to KTeV Hall Encl-NM3 KTeV Hall Encl-NM2 Encl-NM1 Encl-G2 Encl-G2 <1e12 to MTest Encl-G1 Encl-C Enclosures in RED must be modified To transmit 120 GeV protons Encl-B High Intensity 120 GeV To Pbar Production - 14” dia. Underground beam pipe Transfer Hall To Tevatron P3 P2 MainInjector P1

  4. Counting Room Last quad doublet about 200’ upstream

  5. Time structure of the 120 GeV proton beam. • The Main Injector RF operates at 53 MHz; • thus the beam is bunched in 1 nsec long pulses every 19 nsec. • RF timing signal is available at the experiment – makes timing counters easy! • Can be used to clock the electronics • The circumference of the MI is about 10 μsec.; thus there is • an injection gap every 10 μsec. • There is an random variation of the resonant slow extraction • intensity due to magnet ripple, beam oscillations, etc. This leads • to a gross duty cycle of less than 50%. • I.e. 2 uncorrelated counters, each counting 0.1% of the beam would have a • randoms rate of 1e-6 if duty cycle was 100% - can realistically expect 2-3e-6 • randoms because beam is not perfectly random in time.

More Related