BEE3 Update. Chuck Thacker John Davis Microsoft Research Chen Chang BWRC/BEECube 16 January 2008. Outline. BEE3 board properties BEE3 gateware BEE3 schedule. Lab. John explains a tricky point to Chuck. BEE3. BEE3. Bandwidths (per-FPGA). Memory

Download Presentation

BEE3 Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Bee3 update

BEE3 Update

Chuck Thacker

John Davis

Microsoft Research

Chen Chang

BWRC/BEECube

16 January 2008

January 2008 RAMP Retreat


Outline

Outline

  • BEE3 board properties

  • BEE3 gateware

  • BEE3 schedule

January 2008 RAMP Retreat


Bee3 update

Lab

January 2008 RAMP Retreat


John explains a tricky point to chuck

John explains a tricky point to Chuck

January 2008 RAMP Retreat


Bee3 update

BEE3

January 2008 RAMP Retreat


Bee3 update

BEE3

January 2008 RAMP Retreat


Bandwidths per fpga

Bandwidths (per-FPGA)

  • Memory

    • 400 MT/s * 9B/T * 2 channels: 7.2 GB/s

  • Ring

    • 500 MT/s * 9 B/T * 2 channels: 9.0 GB/s

  • QSH

    • 400 MT/s * 10 B/T: 4 GB/s

  • Ethernet

    • 125 MB/s

  • CX4

    • 1.25 GB/s * 2 directions * 2 channels: 5GB/s

  • PCI Express

    • Same as CX4

January 2008 RAMP Retreat


Initial gateware

Initial Gateware

  • Mostly things required for production testing and board characterization:

  • Signal connectivity checks

    • Some are AC coupled, must test at speed

    • QSH tested with a crossover card

  • Temperature and power supply monitoring

  • DDR-2 Controller

    • Useful in other designs

  • CX4 and PCI Express for at-speed tests

  • Xilinx and others have lots of IP (alas, it either doesn’t work very well, or is proprietary).

January 2008 RAMP Retreat


Project participants and roles

Project Participants and Roles

  • Microsoft Research (Silicon Valley)

    • Funds, manages system engineering, does some gateware

  • Celestica (Ottawa and Shanghai)

    • Did main board engineering, prototype fabrication

    • Microsoft has a very deep relationship with Celestica

  • BEECube

    • Builds and delivers functioning systems

  • Function Engineering (Palo Alto)

    • Did thermal and mechanical engineering

  • Xilinx (San Jose)

    • Provides FPGAs for academic machines

    • Provides FPGA application expertise

  • Ramp Group (BWRC)

    • Control board, basic software

  • Ramp Community

    • Uses the systems for research

    • Expanding to industrial users (e.g., us)

January 2008 RAMP Retreat


Bring up status

Bring-up Status

  • Most subsystems work:

    • Brought up a MicroBlaze on day 3 of bring-up

    • Ring wiring

    • 10 Gbit channels

      • Works, but requires respin to relocate MGTs

    • GB Ethernet

    • PCI Express

January 2008 RAMP Retreat


Bring up status 2

Bring-up Status (2)

  • DDR2 controller doesn’t work (yet)

    • Largest piece of “new” IP

    • Works flawlessly in post-route simulation

    • Timing complete at 200 MHz.

  • Problems:

    • Design is complex

      • Six Verilog modules, including a 36-bit RISC

      • Design turnaround is ½ hour (i.e., tools suck).

      • Simulator is slow

    • Board testing uses ChipScope

      • Which doesn’t replace a ‘scope

      • Very difficult to probe

January 2008 RAMP Retreat


Schedule

Schedule

  • Generate Specification – Done

  • Schematic Entry – Done

  • Board Layout – Done

  • Thermal modeling, heat sink design – Done

  • Chassis design -- Done

  • Signal Integrity – Done

  • Board Qualification – In progress

  • Board Respin -- TBD

  • Prototypes: Spring

  • Production: Start Summer ‘08