Saturday 22.05

Saturday 22.05. Stable beams from night 11:30 : PC trip RQTD.A81B2, water problem Access to repair. RSD2.A23B1 trip during access, requires additional access. Trip of RD1.LR5, electrical network perturbation. 19:30 : trip of RF, electrical network perturbation. 20:00 : Access finished

freira
Download Presentation

Saturday 22.05

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Saturday 22.05 • Stable beams from night • 11:30 : PC trip RQTD.A81B2, water problem • Access to repair. • RSD2.A23B1 trip during access, requires additional access. • Trip of RD1.LR5, electrical network perturbation. • 19:30 : trip of RF, electrical network perturbation. • 20:00 : Access finished • 21:40 : injection • B2 emittance increasing rapidly. • Re-injected B2 with (almost) ‘everything’ ready to ramp to minimize emittance growth. 8:30 meeting

  2. Saturday 22.05 • 23:30 : Ramp • Good news : we survived an ‘energy glitch’ event in the FB. • Bad news : the FB does not manage to get back to normal state after the glitch. Enters an endless loop and thinks it is at 1 GeV. All values (kicks, Q corrections) published by the FB are ‘corrupted’. It still manages to correct (respectively not to loose the beam). >> We will have to reboot the server during every pre-cycle to reset the energy (unless we get a ‘far East’ patch…). • 00:15 : Flat top • Huge emittances: B1 4.5 um (H), 7.1 (V) B2 4.5 um (H), 6.4 (V) • Problems to measure Q’ due to the issue with the energy (see above). With 1 GeV, the sign of dp/p changes wrtdfRF and Q’ comes out with the wrong sign !! • Lost B2 while trying to understand Q’ (beam excursion interlock after intensity loss). 8:30 meeting

  3. Sunday 23.05 • 01:30 Ramp down • Reboot FB did gave other issues. >> Decided not to use OFB for next ramp • 06:00 Stable beams at last ! 8:30 meeting