Transportation information management system tims presented to doit pcc april 27 2011
This presentation is the property of its rightful owner.
Sponsored Links
1 / 5

New Mexico Department of Transportation PowerPoint PPT Presentation


  • 84 Views
  • Uploaded on
  • Presentation posted in: General

Transportation Information Management System (TIMS) Presented to DoIT PCC April 27, 2011. New Mexico Department of Transportation. Background:.

Download Presentation

New Mexico Department of Transportation

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Transportation information management system tims presented to doit pcc april 27 2011

Transportation Information

Management System

(TIMS)

Presented to DoIT PCC

April 27, 2011

New MexicoDepartment of Transportation


Background

Background:

The Transportation Information Management System (TIMS) was built as a client/server application, to replace the Consolidated Highway Data Base (CHDB). TIMS is a flexible application capable of evolving with technology trends and will provide a base for geospatially managing transportation infrastructure. TIMS was developed to improve data quality and make quality data readily available to the NMDOT.

TIMS provides an integrated GIS and Web system to geospatially manage linear infrastructures, that is accessible and modifiable from either the GIS or web environment.


Project status

Project Status:

  • Testing and Acceptance Phase – Complete

  • Data migration and validation – Complete

  • System Training – On-going

  • ‘Silent go-live Phase” – On-going

  • Development of reports – On-going

  • PR to promote


Next steps

Next Steps:

Closeout Project to Transition to Operation Mode to include:

  • End User Training

  • Continue Development of Dashboard

  • Enhance software

  • Increase User Base

    Budget

    Budget Lifetime: $2,490,000

    Expended: $2,136,692


New mexico department of transportation

TIMS

"The QUALITY of our data reflects the HEALTH of our agency."

Contact: Antonio Abeyta NMDOT

[email protected]

505-827-5543

Pat Oliver-Wright

[email protected]

505-827-5562


  • Login