Mithi rejuvenation work mithi widening political road block
This presentation is the property of its rightful owner.
Sponsored Links
1 / 23

MITHI REJUVENATION WORK MITHI WIDENING - POLITICAL ROAD BLOCK PowerPoint PPT Presentation


  • 137 Views
  • Uploaded on
  • Presentation posted in: General

MITHI REJUVENATION WORK MITHI WIDENING - POLITICAL ROAD BLOCK. Dr. Kirit Somaiya, BJP Leader Gopal Shetty, President BJP Mumbai. APPEAL. MITHI WIDENING “LET POLITICIANS BECOME STATESMEN” -- DR. KIRIT SOMAIYA. MITHI WIDENING – An Appeal.

Download Presentation

MITHI REJUVENATION WORK MITHI WIDENING - POLITICAL ROAD BLOCK

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


MITHI REJUVENATION WORK MITHI WIDENING - POLITICAL ROAD BLOCK

Dr. Kirit Somaiya, BJP Leader

Gopal Shetty,President BJP Mumbai


APPEAL

MITHI WIDENING

“LET POLITICIANS BECOME STATESMEN”

-- DR. KIRIT SOMAIYA


MITHI WIDENING – An Appeal

  • Political Leaders Think and Act for Mumbai First.

  • Narrowness of vote bank keeping Mithi narrow.

  • No progress - Mithi widening since July 2006

    • Airport South (Kalpana Talkies / Kurla Kalina Road)

    • CST/BKC Zone

    • Kapadia Nagar area

    • Parigh Khadi area.


MITHI WIDENED…

  • Sanjay Gandhi Rashtriya Udyan till Airport

  • BKC to Mahim Creek Bridge.

  • Water bottleneck feared between

    • Airport

    • Kalpana Talkies Junction to BKC.


MITHI WIDENED…

  • The man-made water bottleneck to affect 7 sq. km area.

  • Shall affect

    • Airlines Colonies,

    • Kalpana Talkies Junction,

    • LBS Marg

    • Central Railway tracks near Kurla.


MITHI WIDENING

  • 3 years are over to 26th July 2005.

  • Widening work held up at Airport-Kalpana Talkies, Kurla.

  • Widening done from 60 to 300 feet…..

  • Suggestions of Experts Committees implimented at various places.


MITHI WIDENING

  • Good progress has been done

    • Mithi Janmasthan,

    • Vihar Lake

    • Sanjay Gandhi Rashtriya Udyan

    • Kranti Nagar side of Airport.


MITHI FINANCING

  • No contribution from Central Govt.

  • No contribution from State Govt.

  • The project Implemented by BMC and MMRDA from their own funds.


Width Statement – (MCGM)


Part of the river developed by BMC


Part of the river developed by BMC


Part of the river developed by BMC


Part of the river developed by BMC


Width Statement – (MMRDA)


Part of the river developed by MMRDA


Width Statement – (MMRDA)


Part of the river developed by MMRDA


Part of the river developed by MMRDA


Political Compromise…

  • Congress-NCP “Understanding”

  • Mithi be 150 to 180 feet

  • Airport (south) to CST & BKC

  • Political Pressures

  • Chief Secretary, MMRDA & BMC Commissioner coming under pressure


Effects of the Compromise

  • River will overflow at above places

  • Water logging & River Blockade

  • The area near Kalpana Talkies will be flooded again

  • Decision to save the local existing structures

  • To protect ‘Bhangarwalas’…

  • Disastrous for Mumbaikars


Effects of the decision…

  • Chitale & Experts Committees Report Thrown out

  • Rejuvenation work to be a waste.

  • Invitation to another “26 July”


Suggestions

  • Width of river at the spot should be kept at 100 mtrs or so as recommended by Experts.

  • Transparent decision to save this area from disaster

  • Bureaucrats & Executives to perform their duty to protect Mumbai

  • We appeal to the politicians to have ‘Healthy’ approach


Let us make the dream of MITHI

VASTAVIKTA

DHANYAWAD

Kirit SomaiyaGopal Shetty


  • Login