TCC Budget Highlights. Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M. Major Projects. Blakey’s Crossing completion (State Funding) TECC $5m upgrade (Federal Funding) $7m inner city water & sewer upgrades $6M Magnetic Island Waste Transfer Station

flo
Download Presentation

TCC Budget Highlights

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M

  2. Major Projects • Blakey’s Crossing completion (State Funding) • TECC $5m upgrade (Federal Funding) • $7m inner city water & sewer upgrades • $6M Magnetic Island Waste Transfer Station • $3.14 onshore works for Townsville Recreational Boat Park

  3. Roads • $35M for reconstruction, reseals & overlays of 129 streets • $4.9M kerb & channel replacement • $1.6M road safety measures

  4. Maintenance • $53.32M – Road & Transport Maintenance – potholes, footpaths, traffic signals, bridge repairs, etc. • $42.3M – Parks & Open Space • $10.3M Drain & Stormwater Management • $815K – Coastal Facilities

  5. Drainage • $7M reconstruction of Howitt St stormwater • $350K storage area Garbutt • $350K table drains Rossmead Estate • $150K refurbishing flood pump stations • $120K replacing drainage pit grids/grates etc.

  6. WATER • $6.5M reservoir – Mt Louisa • $3M Mt Kilburn booster pump – Northern Beaches • $4M rehab of water pipes • $880K refurbishment of reservoirs

  7. Waste Water • $5.3M southern Suburbs Pump Station & pressure main • $1.5M upgrade to Cleveland Bay STP • $5M Construction & rehab of sewers • $3M STP renewals • $2M pump station upgrades & renewals