Prac project phase iii sour service evaluation of iso tr 10400 fad equation
Download
1 / 8

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation - PowerPoint PPT Presentation


  • 151 Views
  • Uploaded on

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation. API Production Research Advisory Committee Pete Moore – API PRAC Chairman Peter Ellis – Program Manager. PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris. Detailed Mill Test Report

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation' - flint


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Prac project phase iii sour service evaluation of iso tr 10400 fad equation

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

API Production Research Advisory Committee

Pete Moore – API PRAC Chairman

Peter Ellis – Program Manager


PRAC III C110 Test Pipe Were Donated

and Shipped to Honeywell by Tenaris

Detailed Mill Test Report

Documenting the Pipe

Characterization Attributes


Prac iii phase 3 details
PRAC III – Phase 3 Details

  • Testing Details:

    • NACE Standard TM0177 Method A – Tensile tests complete

    • NACE Standard TM0177 Method D – DCB tests complete

    • Mini/Tiny-Pipe SSC Tests

      – Machining Complete

      – EDM Notch cutting Complete

      – H2S Depletion test Complete

      – Klimit in 7% H2S solution, In-progress

      – Tiny Pipe testing, expected to begin 4th Qtr 2013

    • Full Scale Tests with Man-made OD Surface Imperfections

      • ID/OD and OD only or ID only H2S Exposure – Pressurized ID environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample.

        – Testing to begin 2nd quarter 2014


~ 4 inches

EDM OD Notch

Machining of Tiny Pipe Complete EDM Notching Complete


Tiny Pipe H2S Depletion Test

Soaked in 100% H2S for 17.72 hours, then flushed with distilled H2O

60% Depletion

40% Depletion



Testing of Full Size PipeTo Begin 2nd Quarter 2014