An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WECC Standards Committee WECC Board of Directors Meeting December 5, 2012

  2. Overview • Snapshot of Standards Activities • Request approval • WECC-0076 • WECC-0065 RBP • WECC-0065 “Plan” • Request Guidance on Procedure

  3. Standards Activity • WECC-0046 Voltage and Reactive Control • NERC reports finalizing for FERC filing • WECC-0068 “ATEC” • Filed October 2012 for December 2012 NERC BOT • WECC-0083 BAL-002-WECC-2 • Filed October 2012 for November NERC BOT • WECC-0096 IRO-006 Redraft • Targeted for ballot January 2012

  4. RBP Overview • Ready to Ballot (within 60 days) • WECC-0077 Reliability Curtailments RBP • WECC-0078 Capacity e-tag Functionality RBP • WECC-0079 Ten Minute Recallable RBP • WECC-0081 WECC Interchange Tool RBP • WECC-0087 Dynamic Scheduling RBP

  5. On the Horizon • Review and redraft of Charter • NERC/FERC review is not required • Review and redraft of Procedures • NERC/FERC review is required • 4 SARs to evaluate RBP as Standards • PRC-001-WECC-RBP-1 • PRC-024-WECC-RBP-0 • TLP-001-WECC-RBP-2 • VAR-502-WECC-RBP-0

  6. Request for Approval RPB • WECC-0076 • Interchange Prescheduling Regional Business Practice

  7. WECC-0076 Negative Votes • Overview • 13 “No” votes • 4 = Should be Guideline • 4 = Should be Regional Business Practice • 4 = Too restrictive on scheduling practices • 1= Requirements conflict with narrative guidance

  8. Request for Approval RBP • Motion to accept WECC-0076, INT-003-WECC-RBP-2, Interchange Prescheduling Regional Business Practice as presented, and retire its predecessor, INT-003-WECC-CRT-1, Interchange Prescheduling Criterion.

  9. Request for Approval RPB • WECC-0065 • Underfrequency Load Shedding Business Practice

  10. WECC-0065 Negative Votes RBP • 49 “No” RBP • Approximately 30 sets of comments on each were duplicative • Majority of these issues raised in the 30 duplicative comments were first raised after the document was posted for ballot

  11. WECC-0065 Negative Votes RBP • Overview • The Applicable Entities are inaccurate • ‘UFLS Entities” should be changed to entities responsible for operation and/or control of the UFLS equipment. • The Applicable Facilities is too inclusive • Should have an exclusion for smaller entities • The reporting requirements apply to the inaccurate entity • Should apply to the UFLS Program owners, not UFLS Entities • Requirements are ambiguous and needs clarification / footnotes • May conflict with NERC PRC-006 • May take generation off line needlessly

  12. Request for Approval RBP • Motion to accept WECC-0065, PRC-006-WECC-RBP-1, Underfrequency Load Shedding Regional Business Practice, and retire its predecessor.

  13. Request for Approval “Plan” • WECC-0065 • Underfrequency Load Shedding Coordinated Plan

  14. WECC-0065 Negative Votes Plan • 40 “No” Plan • Approximately 30 sets of comments on each were duplicative • Majority of these issues raised in the 30 duplicative comments were first raised after the document was posted for ballot

  15. WECC-0065 Negative Votes Plan • Overview • Virtually the same as for the Regional Business Practice • Inaccurate Applicable Entities • Inaccurate Applicable Facilities • Inaccurate Reporting Parties • Ambiguous in need of clarification and footnotes • May conflict with NERC PRC-006 • May take generation off line needlessly

  16. Request for Approval “Plan” • Motion to accept WECC-0065, PRC-006-WECC-RBP-1, Underfrequency Load Shedding Coordinated Plan, and retire its predecessor.

  17. Request for Guidance • From the Minutes • Board consensus “was that all documents impacting sanctionable standards should be processed through the standards development process.” • April 2009

  18. Request for Guidance • Board approved • WECC-0055 /WECC-0059 (FITBs) • WECC-0074 (FITB) approaching completion with same structure • Structure • Allows a WECC Subcommittee to recommend changes to content of Attachments • Followed by WECC Standing Committee approving the recommendation • RBP Developed under the “Procedures” • RBP Modified under the WECC Bylaw/Standing Committee Due Process

  19. Request for Guidance • Query • Did the Board mean all FITB documents should be developed using the Procedures? • Did the Board mean all changes to a FITB document should be developed using the Procedures?