1 / 5

JLab Update

JLab Update. RG ILC Cavity Group Meeting July 20, 2010. TB9NR001 optical inspection and tracking 1 st inspection as received 2 nd inspection after USC + BCP 10um. Equator_NR001_E1_Z161mm_146Degrees0170. Lots of dust particles observed on as-received surface.

fleur-glass
Download Presentation

JLab Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JLab Update RG ILC Cavity Group Meeting July 20, 2010

  2. TB9NR001 optical inspection and tracking • 1st inspection as received • 2nd inspection after USC + BCP 10um

  3. Equator_NR001_E1_Z161mm_146Degrees0170 Lots of dust particles observed on as-received surface. Efficient removal of them by USC + BCP 10 um evident TB9NR001

  4. Equator_NR001_E1_Z171mm_353Degrees0085 Lots of pits observed near equator EBW on as-received surface USC + BCP 10 um ineffective in removing these defects Consistent with previous observations at JLab What is new: pit density significantly higher than early cavities TB9NR001

  5. A Very Large Defect on RF Surface of TB9NR001 Cell#4 (51mm, 175Degree), near equator EBW As received After BCP 10 um

More Related