Tests AUG au point 2 (30 janvier 2009 – EL/HCC)
Download
1 / 11

Tests AUG au point 2 (30 janvier 2009 – EL/HCC) - PowerPoint PPT Presentation


  • 59 Views
  • Uploaded on

Tests AUG au point 2 (30 janvier 2009 – EL/HCC). Point 2. Point 1. TUNNEL LHC. Zones concernées. Point 3. Tout le point 2 (surface, souterrain, expérience, TI2, etc…) Secteurs 12 et 23 (US15, RE18, RE22, RE28, RE32, etc…). Zones non concernées. RR17 et UJ16 UJ33.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Tests AUG au point 2 (30 janvier 2009 – EL/HCC)' - fisseha


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Tests AUG au point 2 (30 janvier 2009 – EL/HCC)

Point 2

Point 1

TUNNEL LHC

Zones concernées

Point 3

  • Tout le point 2 (surface, souterrain, expérience, TI2, etc…)

  • Secteurs 12 et 23 (US15, RE18, RE22, RE28, RE32, etc…)

Zones non concernées

  • RR17 et UJ16

  • UJ33


Tests AUG au point 2 (30 janvier 2009 – EL/HCC)

Objectifs

  • Utiliser les tests annuels des AUG afin d’évaluer l’impact d’une coupure électrique sur les différents équipements du LHC:

    • Système de Protection Machine

      • QPS et EE (K. Dahlerup-Petersen, R. Denz)

      • PIC, WIC et BIC (B. Puccio, M. Zerlauth)

      • PC (V. Montabonnet, D. Nisbet, H. Thiesen)

    • Cryo

      • Instrumentation Cryo (S. Claudet, P. Gomes)

      • Vide (J.C. Billy, …)

    • Equipements de Sécurité

      • ACCESS (P. Ninin, J.F. Juget)

      • ODH + Détection Incendie (Rui Nunes)

      • RadMon + Ramses (D. Perrin)

    • Infrastructure

      • CV (S. Deleval)

      • EL (G. Cumer/M. Lonjon)

      • TCR (P. Sollander)

      • Star Points (Olaf Van Der Vossen/Eric Sallaz)

      • OP (G. Arduini, R. Giachino)

    • Beams

      • BI (J.J. Gras)

      • BT (E. Carlier)


Point 4

Point 5

Point 6

B

e

a

m

d

u

m

p

Point 3

S

P

S

Point 7

Point 2

T

I

2

Point 8

I

n

j

e

c

t

i

o

n

T

I

8

Point 1

I

n

j

e

c

t

i

o

n

Tests AUG au point 2 (30 janvier 2009 – EL/HCC)

Déroulement des tests

8H15 : RDV en CCC

8H30 – 8H40 : vérification des équipements (si possible depuis la CCC)

8H45 : ouverture de la chaîne SEM2 (point 2 + les deux 2 secteurs S12 et S23)

8H50 – 9H40 : vérification des équipements sous UPS

9H45 : fermeture de la chaîne 2

9H50 – 10H20 : vérification des équipements

Coordination des tests

El : M. Lonjon

CCC : B. Bellesia

Point 2 : M. Solfaroli Camillocci + H. Thiesen


Tests AUG au point 2 (30 janvier 2009 – EL/HCC)

Prochains points

  • Point 7

    • 16 février

  • Point 1

    • 27 février


Test results (added by Reyes based on Boris email):

Dear Colleagues,

Here is the summary of the events per system. As general comment it seems to me that this test was pretty good almost all the systemreacted as expected.

The only 2 remarkable things are:

-          Few QPS systems found to connected to UPS

-          CUT of the electricity experienced also in SMI2 (to be checked with EN-EL)

Cheers.

Have a nice WE.

Boris


As foreseen an AUG test was done today.

Cut start: 8:45

Power back: 9:30

Affected areas:

P2 all point

Alveols: RE18,RE22,R28,RE32 (UJ33 not included)

P1: the cut of the mains (“boucle LHC 18kV services generaux”) in P2 cut also the US15 and attached areas (UJ14-UJ16)

EVENTS:

PIC (Alex):

Expected reaction in P2-P1

also signal UPS ON in P3 due to a link with the RE32

QPS (Knud-Bob):

Normal reaction for most of the QPS devices.

4 cells in the arc23 (2R) found liked to mains instead to UPS. – to be modified

(18 Main Magnet QPS systems from A30.L3 to C34.L3 affected by one communication repeater not connected to the UPS)

PC (Valerie):

Expected reaction in P2-P1

Reaction of the PC in P3 not recorded because all PC “consigne”, it is then not possible to verify the PIC behavior.

VAC (Jean-Christian):

Expected reaction in P2-P1

Reaction of P3 to be verified

CRYO (Paulo):

Expected reaction in P2-P1

pendant la période 8:45 – 9:45 nous n’avons pas vu de coupures pour (this means that all swithed correctly on UPS):

1.       alimentation des équipements Profibus, dans RE18, RE22, UA23, UA27, RE28, RE32

2.       alimentation des équipement FIP, dans le tunnel et dans UA23, UA27

3.       communication avec les PLCs cryo-tunnel, en surface du P2

BLM (Christos):

Expected reaction in P2-P1

Affected BLM crates: 3 (HC.BLM.SR2.L, HC.BLM.SR2.C, HC.BLM.SR2.R)

-          9:17 crates disconnect from CMW (that is, ~32 min of UPS operation!)

-          9:38 crates’ CPUs are booting (i.e. power-on).

-          9:40 reconnected to CMW

-          all operational, no intervention needed.

ACCESS/ODH (Franck):

Expected reaction in P2-P1

EL (Gerard):

To be seen with him next week

INJECTION SYSTEM (Etienne):

Expected reaction in P2-P1

No problems where found during the switchover to the UPS and none where detected during the restoration of the fully functional system

CONTROLS/NETWORKS (Olaf):

…no info yet…

TI (Peter):

6h18: Tests commencent. 6h22: On perd les couleurs sur l'ENS (D'abord sur les disjoncteurs, peu après sur les jeux de barres) Vu avec TS-EL qui a redémarré les RTUs. 8h46: Perte de comm avec la ventilation SU2 (Depuis PCVue) Plus aucune valeur sur les vues TIM (toutes a 0 - mais pas en défaut)             On a eu un arrêt total du PM32, ou la cause pourrait être l'alimentation depuis le tunnel? Reste à vérifier. La pompe de secours a bien pris la relève.     SMI2 a été coupé aussi, ce qui n’était pas prévu (En tous cas pas sur la NDC), alimentation depuis TI2 ?

[?????Network alarms (seen in the computer centre):p2280-1-ipz-s3c44-1 and T2280-SU2 p2255-r-ipy-s3c44-1 u6622-r-ipy-shp3m-1, u6628-r-pby-shp3m-1, u2290-r-ipx-shp3m-1, u2252-rb-pbz-shp3m-1, u2252-r-ipz-s3c4b-e1, T2280-SU2, p2280-1-ipz-s3c44-1 T2290-SY2, p2290-r-ipz-s3c44-1, u3294-r-pbz-shp3l-1, T2282-SUX2, p2282-1-ipz-s3c44-1, u6611-r-pby-shp3m-1, u2275-r-ip3-shp3m-1, T2265-SF2, p2265-r-ipz-s3c44-1, u2222-p2-pbz-phpyl-1 6628-R, u6515-r-pby-shp3m-1, 6515-R, u6611-r-ipy-shp3m-1, 6611-R, u2252-r-pbz-shp3m-1, u6515-r-ipy-shp3m-1, u2290-r-ipy-shp3l-1, 2290-R (SY2), u3294-r-ipz-shp3l-1, 3294-R u2648-r-pbz-bpr41-1, Rpt_Segment, d6622-r-ipz-shp3m-1, 6622-R, u2252-rb-ipz-shp3m-1, 2252-R-RB,u6622-r-pby-shp3m-1, u2252-r-ipz-shp3m-e2u6628-r-ipy-shp3m-1 mobile-2671 d2127-2v-ipy-shpyl-3930 d2227-0-ip1/2-shp3l-1 d2227-0-ip3/4-shp3l-1 d2222-p2-ip10-shp3l-1 d2222-p5 d2227-0-rhpyl-1 d2222-p2-rhpzm-2 d2222-3v-ip1/3-shp3m-1727/1725 u2222-p5-pbz-phpyl-1, d2222-p2-rhpzm-1 u2227-0-pbz-shp3l-1, u2227-0-ipy-shp3l-1,d2222-3v-ip1-shp3m-1727, d2222-3v-ip2-shp3m-1726, d2222-3v-ip3-shp3m-1725, d2222-3v-ip4-shp3m-1724, u6622-r-ipy-shp3m-1,u2222-p5-pbz-bprmb-1u2222-p5-ipy-shp3l-1 u6611-r-ipy-shp3m-1 d6622-r-ipz-shp3m-1, u2222-p5-pbz-bprm1-1, u2285-r-ipz-shpyl-1 2285-R (SX2) , u2222-p5-pbz-bprm6-1,,u2270-r-ipy-shp3m-1,,2270-R (SG2) u40-s2-pb2-bpr46-2, T2270-SG2, p2270-r-ipz-s3c44-1, u2285-r-pbz-shpyl-1, u2285-r-pby-shpyl-1, u2222-p2-pbz-phpyl-1, T2285-SX2 p2285-r-ipy-s3c44-1,T2282-SUX2 p2282-1-ipz-s3c44-1 u2270-r-pbz-shp3m-1 d2222-3v-ip5-shp3m-1723 u2252-rb-ipz-shp3m-1, u2252-r-ipz-s3c4b-e1, T2290-SY2, p2290-r-ipz-s3c44-1, u2222-p2-pbz-phpyl-1, mobile-2671, u2252-r-ipz-shp3m-e2, u2290-r-ipx-shp3m-1, u2252-r-pbz-shp3m-1 u6515-r-ipy-shp3m-1, u2290-r-ipy-shp3l-1, 2290-R (SY2) , u2252-r-ipz-shp3m-e2, u2290-r-ipx-shp3m-1 u3294-r-pbz-bpr41-1, d2270-r-ipx-shp3l-1, u2290-r-ipy-shp3l-1, 2290-R (SY2), d2285-r-ipx-shp3m-1, u2290-r-ipy-shp3l-1, 2290-R (SY2) ,d2285-r-ipw-shp3m-2, u2285-r-ipz-shpyl-1 u2222-p2-pbz-phpyl-1, u6611-r-ipy-shp3m-1, T2285-SX2, p2285-r-ipy-s3c44-1, 6611-R, d2270-r-ipx-shp3l-1, u6611-r-pby-shp3m-1, u2270-r-ipy-shp3m-1 T2282-SUX2, p2282-1-ipz-s3c44-1, u2222-p2-pbz-phpyl-1, d2285-r-ipx-shp3m-1, d2285-r-ipw-shp3l-1, u6622-r-ipy-shp3m-1 T2270-SG2,,p2270-r-ipz-s3c44-1, d2222-3v-ip2-shp3m-1726 d2222-3v-ip3-shp3m-1725, d2222-3v-ip4-shp3m-1724, u2285-r-pbz-shpyl-1, u2285-r-pby-shpyl-1 u6622-r-ipy-shp3m-1, u6611-r-ipy-shp3m-1, T2282-SUX2, p2282-1-ipz-s3c44-1, u6622-r-pby-shp3m-1, 6622-R, d6622-r-ipz-shp3m-1, u2222-p2-pbz-phpyl-1 as1-ams, x424chi, evo-us u6611-r-pby-shp3m-1, 6611-R, d2285-r-ipw-shp3l-1, u2270-r-pbz-shp3m-1, u2270-r-ipy-shp3m-1 d2285-r-ipx-shp3m-1, u2270-r-ipy-shp3m-1, u2648-r-pbz-bpr41-1 x424nyc, Interoute Geneva, TIFR-ERnet-India, mobile-2647, evo-eu u3191-ra-ipy-shp3m-1, T3191-R, p3191-r-ipz-s3c44-1, u3191-r-pbz-shp3m-1, U3191-R / RA u3191-r-pbz-bpr46-1]

As foreseen an AUG test was done today.

Cut start: 8:45

Power back: 9:30

Affected areas:

P2 all point

Alveols: RE18,RE22,R28,RE32 (UJ33 not included)

P1: the cut of the mains (“boucle LHC 18kV services generaux”) in P2 cut also the US15 and attached areas (UJ14-UJ16)

EVENTS:

PIC (Alex):

Expected reaction in P2-P1

also signal UPS ON in P3 due to a link with the RE32

QPS (Knud-Bob):

Normal reaction for most of the QPS devices.

4 cells in the arc23 (2R) found liked to mains instead to UPS. – to be modified

(18 Main Magnet QPS systems from A30.L3 to C34.L3 affected by one communication repeater not connected to the UPS)


PC (Valerie):

Expected reaction in P2-P1

Reaction of the PC in P3 not recorded because all PC “consigne”, it is then not possible to verify the PIC behavior.

VAC (Jean-Christian):

Expected reaction in P2-P1

Reaction of P3 to be verified

CRYO (Paulo):

Expected reaction in P2-P1

pendant la période 8:45 – 9:45 nous n’avons pas vu de coupures pour (this means that all swithed correctly on UPS):

1.       alimentation des équipements Profibus, dans RE18, RE22, UA23, UA27, RE28, RE32

2.       alimentation des équipement FIP, dans le tunnel et dans UA23, UA27

3.       communication avec les PLCs cryo-tunnel, en surface du P2


BLM (Christos):

Expected reaction in P2-P1

Affected BLM crates: 3 (HC.BLM.SR2.L, HC.BLM.SR2.C, HC.BLM.SR2.R)

-          9:17 crates disconnect from CMW (that is, ~32 min of UPS operation!)

-          9:38 crates’ CPUs are booting (i.e. power-on).

-          9:40 reconnected to CMW

-          all operational, no intervention needed.

ACCESS/ODH (Franck):

Expected reaction in P2-P1

EL (Gerard):

To be seen with him next week

INJECTION SYSTEM (Etienne):

Expected reaction in P2-P1

No problems where found during the switchover to the UPS and none where detected during the restoration of the fully functional system


CONTROLS/NETWORKS (Olaf):

…no info yet…

TI (Peter):

6h18: Tests commencent. 6h22: On perd les couleurs sur l'ENS (D'abord sur les disjoncteurs, peu après sur les jeux de barres) Vu avec TS-EL qui a redémarré les RTUs. 8h46: Perte de comm avec la ventilation SU2 (Depuis PCVue) Plus aucune valeur sur les vues TIM (toutes a 0 - mais pas en défaut)             On a eu un arrêt total du PM32, ou la cause pourrait être l'alimentation depuis le tunnel? Reste à vérifier. La pompe de secours a bien pris la relève.     SMI2 a été coupé aussi, ce qui n’était pas prévu (En tous cas pas sur la NDC), alimentation depuis TI2 ?


[?????Network alarms (seen in the computer centre):p2280-1-ipz-s3c44-1 and T2280-SU2 p2255-r-ipy-s3c44-1 u6622-r-ipy-shp3m-1,

u6628-r-pby-shp3m-1, u2290-r-ipx-shp3m-1, u2252-rb-pbz-shp3m-1, u2252-r-ipz-s3c4b-e1, T2280-SU2, p2280-1-ipz-s3c44-1 T2290-SY2, p2290-r-ipz-s3c44-1, u3294-r-pbz-shp3l-1,

T2282-SUX2, p2282-1-ipz-s3c44-1, u6611-r-pby-shp3m-1, u2275-r-ip3-shp3m-1,

T2265-SF2, p2265-r-ipz-s3c44-1, u2222-p2-pbz-phpyl-1 6628-R, u6515-r-pby-shp3m-1,

6515-R, u6611-r-ipy-shp3m-1, 6611-R, u2252-r-pbz-shp3m-1,

u6515-r-ipy-shp3m-1, u2290-r-ipy-shp3l-1, 2290-R (SY2), u3294-r-ipz-shp3l-1,

3294-R u2648-r-pbz-bpr41-1, Rpt_Segment, d6622-r-ipz-shp3m-1, 6622-R,

u2252-rb-ipz-shp3m-1, 2252-R-RB,u6622-r-pby-shp3m-1,

u2252-r-ipz-shp3m-e2u6628-r-ipy-shp3m-1 mobile-2671 d2127-2v-ipy-shpyl-3930

d2227-0-ip1/2-shp3l-1 d2227-0-ip3/4-shp3l-1 d2222-p2-ip10-shp3l-1 d2222-p5

d2227-0-rhpyl-1 d2222-p2-rhpzm-2 d2222-3v-ip1/3-shp3m-1727/1725

u2222-p5-pbz-phpyl-1, d2222-p2-rhpzm-1 u2227-0-pbz-shp3l-1,

u2227-0-ipy-shp3l-1,d2222-3v-ip1-shp3m-1727, d2222-3v-ip2-shp3m-1726,

d2222-3v-ip3-shp3m-1725, d2222-3v-ip4-shp3m-1724,

u6622-r-ipy-shp3m-1,u2222-p5-pbz-bprmb-1u2222-p5-ipy-shp3l-1

u6611-r-ipy-shp3m-1 d6622-r-ipz-shp3m-1, u2222-p5-pbz-bprm1-1,

u2285-r-ipz-shpyl-1 2285-R (SX2) , u2222-p5-pbz-bprm6-1,,u2270-r-ipy-shp3m-1,

,2270-R (SG2) u40-s2-pb2-bpr46-2, T2270-SG2, p2270-r-ipz-s3c44-1,

u2285-r-pbz-shpyl-1, u2285-r-pby-shpyl-1, u2222-p2-pbz-phpyl-1,


T2285-SX2 p2285-r-ipy-s3c44-1,T2282-SUX2 p2282-1-ipz-s3c44-1 u2270-r-pbz-shp3m-1 d2222-3v-ip5-shp3m-1723 u2252-rb-ipz-shp3m-1, u2252-r-ipz-s3c4b-e1, T2290-SY2, p2290-r-ipz-s3c44-1, u2222-p2-pbz-phpyl-1, mobile-2671, u2252-r-ipz-shp3m-e2, u2290-r-ipx-shp3m-1,

u2252-r-pbz-shp3m-1 u6515-r-ipy-shp3m-1, u2290-r-ipy-shp3l-1, 2290-R (SY2) , u2252-r-ipz-shp3m-e2, u2290-r-ipx-shp3m-1 u3294-r-pbz-bpr41-1, d2270-r-ipx-shp3l-1, u2290-r-ipy-shp3l-1, 2290-R (SY2), d2285-r-ipx-shp3m-1, u2290-r-ipy-shp3l-1, 2290-R (SY2) ,d2285-r-ipw-shp3m-2, u2285-r-ipz-shpyl-1 u2222-p2-pbz-phpyl-1,

u6611-r-ipy-shp3m-1, T2285-SX2, p2285-r-ipy-s3c44-1, 6611-R, d2270-r-ipx-shp3l-1, u6611-r-pby-shp3m-1, u2270-r-ipy-shp3m-1 T2282-SUX2, p2282-1-ipz-s3c44-1, u2222-p2-pbz-phpyl-1, d2285-r-ipx-shp3m-1, d2285-r-ipw-shp3l-1, u6622-r-ipy-shp3m-1 T2270-SG2,,p2270-r-ipz-s3c44-1, d2222-3v-ip2-shp3m-1726 d2222-3v-ip3-shp3m-1725,

d2222-3v-ip4-shp3m-1724, u2285-r-pbz-shpyl-1, u2285-r-pby-shpyl-1 u6622-r-ipy-shp3m-1, u6611-r-ipy-shp3m-1, T2282-SUX2, p2282-1-ipz-s3c44-1,

u6622-r-pby-shp3m-1, 6622-R, d6622-r-ipz-shp3m-1, u2222-p2-pbz-phpyl-1 as1-ams, x424chi, evo-us u6611-r-pby-shp3m-1, 6611-R, d2285-r-ipw-shp3l-1, u2270-r-pbz-shp3m-1,

u2270-r-ipy-shp3m-1 d2285-r-ipx-shp3m-1, u2270-r-ipy-shp3m-1, u2648-r-pbz-bpr41-1 x424nyc, Interoute Geneva, TIFR-ERnet-India, mobile-2647, evo-eu u3191-ra-ipy-shp3m-1, T3191-R, p3191-r-ipz-s3c44-1, u3191-r-pbz-shp3m-1, U3191-R / RA u3191-r-pbz-bpr46-1]


ad