The agile mission 415 days ahead of glast
Download
1 / 11

The AGILE Mission “415 days ahead of GLAST” - PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on

The AGILE Mission “415 days ahead of GLAST”. Dr. Luca Salotti – Mission Director. Guest. Malindi – Fucino – ASDC – PI Team - Guest. Fucino – SCC/MCC/FDS. ASDC/ESRIN. PI Team. Industry - RTI. Orbcom. Intelsat. MLD-2 Ground Station. AGILE in ASI.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' The AGILE Mission “415 days ahead of GLAST”' - fergus


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
The agile mission 415 days ahead of glast

The AGILE Mission“415 days ahead of GLAST”

Dr. Luca Salotti – Mission Director


Malindi fucino asdc pi team guest

Guest

Malindi – Fucino – ASDC – PI Team - Guest

Fucino – SCC/MCC/FDS

ASDC/ESRIN

PI Team

Industry - RTI

Orbcom

Intelsat

MLD-2 Ground Station


AGILE in ASI

OSU – Observation of the Universe – S. Di Pippo/E. Flamini

SMI – Small Mission – F. Viola

TST – Ground Segment – R. Ibba


AGILE Industry - RTITemporary Consortium

Carlo Gavazzi Space S.p.A.

Rheinmetall Italia S.p.A.

Subco

Thales Alenia Space – Italia – S.p.A.

Telespazio S.p.A.

Prime Contractor: All inclusive, S/C design, building & assembling, P/L assembling, test, launch, operation, data delivery to the ASDC, disposal


The Ground Station

  • N. Passes on the Ground Station MLD-2: 5583 (23/05/2008)

  • N. Passes perturbed or lost: 34 (14 due to station problems)

  • 1 438 Total 24.05.07 SAC off

  • 2 736 Total 14.06.07 Antenna Elevation Brake

  • 3 790 Total 18.06.07 Antenna Elevation Manual System

  • 4 1625 Total 16.08.07 Program Track not working

  • 5 1634 Total 17.08.07 SAC off

  • 6 2728 Total 02.11.07 Fuse on SCR AZ2 F1

  • 7 2729 Total 02.11.07 Fuse on SCR AZ2 F1

  • 8 2969 Total 19.11.07 Fuse on SCR AZ2 F2

  • 9 3015 Total 23.11.07 Fuse on SCR AZ2 F2

  • 10 3372 Total 18.12.07 Wrong TLE ( Spot2 test)

  • 11 4005 Total 01.02.08 Azimut2 SCR Fuse

  • 12 4006 Total 01.02.08 Azimut2 SCR Fuse

  • 13 5409 Total 05.05.08 CMCS MLD-2

  • 14 5460 Total 19.05.08 LAN MLD-2

    • Efficiency: 99.4 %


  • The Orbit

    • NORAD: 31135 A

    • ID: 013/07

    • SEPARATION: 23 04 2007 10 Hrs 22 Min 50.593 Sec (UT)

    • EPOCH : 3062.999469 2008/05/20 23:59:14.163

    • STATE VECTOR J2000 REF SYST ELEMENTS

    • --------------------------------------------------

    • INCLINATION = 2.45°

    • PERIGEE RADIUS = 6916.31580056 KM

    • APOGEE RADIUS = 6927.0823720 KM

    • PERIGEE HEIGHT = 538.17931056 KM

    • APOGEE HEIGHT = 548.94474720 KM

    • A/M = 0,006 sqm/kg H<500 km 20/2014

    • A/M = 0,012 sqm/kg H<500 km 11/2012


    What we have done

    • 23 April 2007: Launch

    • 23 July 2007: End of the Commissioning – SCRB

    • August – October 2007: Science Verification Phase

    • November 2007: Δ Commissioning

    • 1 December 2007: Start of the 1 Cycle Observong Time (one year)

    • 19 December 2007: OVR1

    • OBH SW 2.07

    • PDHU SW V3R3 + Patches

    • TLC: 110000

    • TLM: 65 GB

    • LTP: 30

    • TOO: 8 + Trimmings

    • NCR: 159 whose 18 in orbit

    • NCR open: 13 (in orbit)


    What is still missing …… what is wrong !

    • Test HW Burst Trigger MCAL (will do next week !! - Δ Δ Commissioning)

    • New SW PDHU

    • NCR 143:

      • AC TOP Temperature;

    • NCR 150:

      • PDHU Hang-up and install of AC SAFE mode;

    • NCR 152:

      • TMTC OBH-A Hang-up;

      • In orbit reset of OBH-A 01/01/08;

    • NCR 154:

      • OBH-A math processor instability;

      • We are ready to activate OBH-B in case of progressive degradation;

    • NCR 161:

      • PDHU TC task hang-up;




    Welcome in orbit GLAST !!

    • The official GLAST liftoff time was 11/06/08 12:05:00.521 p.m. EDT (1605 GMT).

    • The 333rd Delta rocket launch since 1960

    • The 2nd to fly this year

    • The 136th Delta 2 rocket mission since 1989

    • The 5th Heavy version of the Delta 2

    • 301 nautical mile (558 Km) circular orbit inclined 25.6 degrees

    • GLAST M$690 vs. AGILE M€ 55