1 / 13

FOOD PRODUCTION CENTER

Laredo Independent School District. FOOD PRODUCTION CENTER. September, 2008. L.I.S.D. FOOD PRODUCTION CENTER. EXISTING CENTRAL KITCHEN PHOTOS. L.I.S.D. FOOD PRODUCTION CENTER. SITE ANALYSIS LAREDO INDEPENDENT SCHOOL DISTRICT FOOD PRODUCTION CENTER

feoras
Download Presentation

FOOD PRODUCTION CENTER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Laredo Independent School District FOOD PRODUCTION CENTER September, 2008

  2. L.I.S.D. FOOD PRODUCTION CENTER EXISTING CENTRAL KITCHEN PHOTOS

  3. L.I.S.D. FOOD PRODUCTION CENTER • SITE ANALYSIS • LAREDO INDEPENDENT SCHOOL DISTRICT • FOOD PRODUCTION CENTER • SCHEME A - 101 W. SAUNDERS STREET SITE • 1. OWNER: LAREDO I.S.D. • 2. ADDRESS: 101 WEST SAUNDERS AVE. • 3. LEGAL DESCRIPTION: LOTS 1-8, BLOCK 425 ED • 4. SIZE: 277.8’ X 277.8’ OR 77,172.84 SF • 5. ACRES: 1.771 AC • 6. PRESENTLY ZONED: B-3 (NORTHERN HALF) & R-3 (SOUTHERN HALF) • 7. REQUIRED ZONING: B3 & R3–C.U.P. (CONDITIONAL USE PERMIT)PLANNING & ZONING APPLICATION & PROCESS (75 TO 90 CALENDAR PROCEDURE FOR APPROVAL) • 8. SETBACKS: NORTH (20’), SOUTH (20’), EAST (10’), WEST (10’) • 9. IMMEDIATE SURROUNDINGS: RESIDENTIAL(SOUTH) COMMERCIAL(EAST )RECREATIONAL(WEST) COMMERCIAL(NORTH) • 10. MAIN ACCESS: SAUNDERS AVE. & McDONNEL AVE. GOOD • 11. DRIVEWAY ENTRANCES: 3 (1 STAFF, 1 DELIVERY, 1 EMERGENCY) • 12. PARKING SPACES REQ’D: 36 • 13. SITE ELEVATIONS & GRADING: SLOPES NORTH (HIGH) TO SOUTH (LOW) (APP. 2’-0’) • 14. UTILITIES: AVAILABLE WATER, SEWER, ELECTRICAL, GAS, PHONE, CABLE, COMMUNICATIONS, STMS • 15. STORM WATER DETENTION: POSSIBLE REQUIREMENT FROM CITY ENVIRONMENT • 16. PARKING SPACES PROVIDED: 38 ( 3 VISITOR, 2 HC, 33 STAFF) • 17. DELIVERY VEHICLE SPACES: 21 (VANS, PICKUPS, SMALL DELIVERY TRUCKS) • 18. LOADING DOCKS: 7 (5 – DELIVERY TRUCKS & 1 SEMI TRUCK, 1 RAMP) • 19 MECHANICAL YARD: ENCLOSED WALLS FOR EQUIPMENT @ SOUTH SIDE • 20 SIDEWALKS REQUIRED: PER ORDINANCE, FOUR SIDES • 21. LANDSCAPING REQUIRED: PER ORDINANCE • 22. FENCING AND SCREENING: REQUIRED ALONG WEST, SOUTH AND NORTH • 23. TRAFFIC CIRCULATION: VERY HEAVY ALONG SAUNDERS • 24. PROXIMITY TO HIGHWAYS: VERY CLOSE AND GOOD • 25. NOISE FACTOR: DOCKS, TRUCKS AWAY FROM RESIDENCES, MECH. YARD IN CLOSE PROX. TO RESIDENCES • 26. ENVIRONMENTAL SITE: PENDING REPORT (ASBESTOS ABATEMENT LIKELY FOR BUILDINGS & POSSIBLE FUEL TANK AND SOIL REMOVAL, MONITORING WELLS POSSIBLE) • 27. SOIL INVESTIGATION SITE: PENDING REPORT – ORDERED • 28. SURVEY – PLAT: PENDING – ORDERED – IN PROGRESS • 29. CITY PLANNING COMMENTS: RECOMMEND SITE FOR PROPOSED USE WITH APPROVAL FOR C.U.P. AND P&Z BOARD • 30. ARCHITECT’S RECOMMENDATION: RECOMMEND SITE FOR PROPOSED USE, • GOOD ACCESS TO MAJOR ROADS AND HIGHWAYS, LOCATION IS IN MAINLY A COMMERCIAL AREA WITH ONE SIDE RESIDENTIAL SITE ANALYSIS – SCHEME A

  4. L.I.S.D. FOOD PRODUCTION CENTER • SITE ANALYSIS • LAREDO INDEPENDENT SCHOOL DISTRICT • FOOD PRODUCTION CENTER • SCHEME B - 3000 TILDEN AVENUE SITE • 1. OWNER: LAREDO I.S.D. • 2. ADDRESS: 3000 TILDEN AVENUE • 3. LEGAL DESCRIPTION: LOTS 1-8, BLOCK 538 ED LESS LOT 4 • 4. SIZE: 277.8’ X 277.8’ OR 77,172.84 SF • 5. ACRES: 1.771 AC • 6. PRESENTLY ZONED: R-3 ENTIRE BLOCK • 7. REQUIRED ZONING: R3–C.U.P. (CONDITIONAL USE PERMIT)PLANNING & ZONING APPLICATION & PROCESS (75 TO 90 CALENDAR PROCEDURE FOR APPROVAL) • 8. SETBACKS: NORTH (20’), SOUTH (20’), EAST (10’), WEST (10’) • 9. IMMEDIATE SURROUNDINGS: RESIDENTIAL (EAST), COMMERCIAL (SOUTH)EDUCATIONAL (WEST), RESIDENTIAL (NORTH) • 10. MAIN ACCESS: TILDEN AVE. AND FAIR • 11. DRIVEWAY ENTRANCES: 3 (1 STAFF, 1 DELIVERY, 1 EMERGENCY) • 12. PARKING SPACES REQ’D: 36 • 13. SITE ELEVATIONS & GRADING: SLOPES NE (HIGH) TO SW (LOW) (APP. 2’-3’) • 14. UTILITIES: AVAILABLE WATER, SEWER, ELECTRICAL, GAS, PHONE, CABLE, COMMUNICATIONS, STMS • 15. STORM WATER DETENTION: POSSIBLE REQUIREMENT FROM CITY ENVIRONMENT • 16. PARKING SPACES PROVIDED: 38 ( 3 VISITOR, 2 HC, 33 STAFF) • 17. DELIVERY VEHICLE SPACES: 21 (VANS, PICKUPS, SMALL DELIVERY TRUCKS) • 18. LOADING DOCKS: 7 (5 – DELIVERY TRUCKS & 1 SEMI TRUCK, 1 RAMP) • 19 MECHANICAL YARD: ENCLOSED WALLS FOR EQUIPMENT @ SE SIDE • 20 SIDEWALKS REQUIRED: PER ORDINANCE, THREE SIDES • 21. LANDSCAPING REQUIRED: PER ORDINANCE • 22. FENCING AND SCREENING: REQUIRED ALONG WEST, EAST • 23. TRAFFIC CIRCULATION: HEAVY ALONG TILDEN, LIGHT ON ADJACENT STS. • 24. PROXIMITY TO HIGHWAYS: CLOSE BY AND GOOD • 25. NOISE FACTOR: DOCKS, TRUCKS AWAY FROM RESIDENCES, MECH. YARD IN CLOSE PROX. TO RESIDENCES • 26. ENVIRONMENTAL SITE: PENDING REPORT (ASBESTOS ABATEMENT LIKELY FOR BUILDINGS, NO FUEL TANK ON SITE) • 27. SOIL INVESTIGATION SITE: PENDING REPORT – HAS NOT BEEN ORDERED • 28. SURVEY – PLAT: PENDING – HAS NOT BEEN ORDERED • 29. CITY PLANNING COMMENTS: RECOMMEND SITE FOR PROPOSED USE WITH APPROVAL FOR C.U.P. AND P&Z BOARD • 30. ARCHITECT’S RECOMMENDATION: RECOMMEND SITE FOR PROPOSED USE, • FAIR ACCESS TO MAJOR ROADS AND HIGHWAYS, LOCATION IS IN MIXED USED AREA – EDUCATIONAL, COMMERCIAL, MULTI-FAMILY AND RESIDENTIAL SITE ANALYSIS – SCHEME B

  5. L.I.S.D. FOOD PRODUCTION CENTER PROGRAM OF REQUIREMENTS

  6. L.I.S.D. FOOD PRODUCTION CENTER PROGRAM OF REQUIREMENTS

  7. L.I.S.D. FOOD PRODUCTION CENTER SAUNDERS AVE. EXISTING CENTRAL KITCHEN TRAVIS ST. McDONNELL AVE. MONTERREY AVE. SCHEME A EXISTING CENTRAL KITCHEN SITE 101 W. SAUNDERS ST

  8. L.I.S.D. FOOD PRODUCTION CENTER SCHEME A - SITE PLAN- 101 W. SAUNDERS

  9. L.I.S.D. FOOD PRODUCTION CENTER EXISTING TRANSPORTATION COMPOUND SCHEME B EXISTING DIVISION OF OPERATIONS & TRANSPORTATION COMPOUND

  10. L.I.S.D. FOOD PRODUCTION CENTER SCHEME B EXISTING BUS TRANSPORTATION SITE 3000 TILDEN AVE

  11. L.I.S.D. FOOD PRODUCTION CENTER PLUM ST TILDEN HENDRICKS FROST SCHEME B - SITE PLAN- 3000 TILDEN AVE.

  12. L.I.S.D. FOOD PRODUCTION CENTER SCHEMATIC FLOOR PLAN

  13. L.I.S.D. FOOD PRODUCTION CENTER LAREDO INDEPENDENT SCHOOL DISTRICT FEASIBILITY STUDY – MINIMAL COOK-CHILL W/ DISTRIBUTION WAREHOUSE CONCEPT AT SAUNDERS EXISTING SITE FOOD PRODUCTION CENTER - COST ESTIMATE

More Related