Two methods to observe tutorial Standard Method

Two methods to observe tutorial Standard Method This method allows presentation to be resized to user preference. Slide Show Method (Example below) Presentation fills entire screen Click on Slide Show tab at top of screen Click icon <From Beginning>

faustus
Download Presentation

Two methods to observe tutorial Standard Method

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Two methods to observe tutorial • Standard Method • This method allows presentation to be resized to user preference. • Slide Show Method (Example below) • Presentation fills entire screen • Click on Slide Show tab at top of screen • Click icon <From Beginning> • Note: Either method; to advance click the progression arrow in the bottom right corner of each slide or press the down-arrow key.

  2. Welcome to BSIP 101 Transaction Procedures Cancel Material Movement Instructor: Stephen Wright DPI Technical Consultant

  3. Purpose:To credit or debit inventory items to and from stock.

  4. One transaction is required to complete this procedure: • MIGO Let’s get started -

  5. From the SAP R/3 Easy Access screen box type MIGO or from your favorites menu, select transaction MIGO – Goods Movement Your screen should look similar to the example at the right.

  6. A new window opens: Cancellation Material Document – {Username} • Items to select • (Note: When MIGO is reopened it will default to the last transaction performed). 1st Match code = Cancellation 2nd Match code = Material Document (Software will often default automatically, based upon 1st Match code entry). • Material Document field = Material Document Number form the work order (10 digits). • Press <Enter>

  7. The window updates: The screen update will display in the table the inventory item(s) associated with the material document entered. OK column - ü the box next to the items to be cancelled. Tip: If the top line in your table has the OK column box grayed out and is unavailable to be checked; it is not an error it simply means the detail data is active. Click Close Detail Data icon to deactivate.

  8. The window updates: With the Detail Data Table closed your screen should look very similar to the screen displayed to the right. The OK column fields should now display with white back-grounds and be available to receive a ü . Tip: The Detail data table can be relaunched if needed; by clicking in the bottom left corner of the screen on the icon.

  9. Tip: If the material document was created in a prior (closed) financial period, the posting date must be changed to the current date. Click the Execute iconto verify changes.

  10. A “Document OK” message will display in the status bar or if you are canceling a receipt of materials into inventory you will be prompted to enter a reason for the cancellation (Shown to the right). Click on the Continue icon to close the Display logs window. Click on the tab in the bottom left corner of the screen to open the detail data for the inventory.

  11. On the Where tab; in the Reason for Movement field enter the code 0001.

  12. Click the Save icon to record all changes. “Material document XXXXXXXXXX posted” will be display in the status bar. Click the Exit icon to return to main menu.

  13. Questions Email: Stephen.Wright@dpi.nc.gov

  14. Thank You! Stephen Wright DPI Technical Consultant