html5-img
1 / 26

Hardware Status and Plans of the E mbedded L ocal M onitor B oard

Hardware Status and Plans of the E mbedded L ocal M onitor B oard. Introduction. There is a need for a general-purpose Detector Front-End I/O Control System which can be embedded in the detectors. to monitor voltages, currents, temperatures, ..

faunia
Download Presentation

Hardware Status and Plans of the E mbedded L ocal M onitor B oard

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hardware Status and Plans of theEmbedded Local Monitor Board ATLAS DCS Workshop 2-3 Oct 2000

  2. Introduction There is a need for a general-purpose Detector Front-End I/O Control System which can be embedded in the detectors. • to monitor voltages, currents, temperatures, .. • to control power supplies, cooling system, ... • to read and write status bits • to check in-system programmable devices via serial control e.g. JTAG and I2C ATLAS DCS Workshop 2-3 Oct 2000

  3. Introduction to ELMB ATLAS DCS Workshop 2-3 Oct 2000

  4. Development of the ELMB is motivated by • Radiation Problems • Total Ionising Dose TID CMOS MUX • Non-Ionising Energy Loss NIEL Optocouplers • Single Even Effects SEE Memory bit errors • Magnetic Field (1.5T to 0.1T) DC-DC converters • Access restriction - should work 24h and 365 days/year • I/O points distributed over the whole detector volume <100m • Standardised connections to the SCADA Hardware: CANbus / LAN Software: CANopen, OPC, TCP/IP ATLAS DCS Workshop 2-3 Oct 2000

  5. and furthermore... • Reduced design effort by individual institutes • Common Open Embedded Software • templates, libraries • Spares and maintence during the detector lifetime (15 years) • Low power consumption • cables, local power supplies • Commercial low cost • in ATLAS several thousands will be needed • Common effort • People from many subdetectors involved in HW and SW. ATLAS DCS Workshop 2-3 Oct 2000

  6. ELMB block diagram ATLAS DCS Workshop 2-3 Oct 2000

  7. ELMB block diagram Alternative to the ADC? ATLAS DCS Workshop 2-3 Oct 2000

  8. ELMB front side ISP CANoptos 50mm ADC optos DIP-SW ID BAUD CAN 66 mm ATLAS DCS Workshop 2-3 Oct 2000

  9. ELMB back side ADC ADC Analog MUX 2*50 pin Bergstac connector ATLAS DCS Workshop 2-3 Oct 2000

  10. ELMB specifications • General-purpose plug-on module (50 x 60 mm2) • CANbus interface (Full-CAN controller) • CANopen communication protocol • Powerful 8-bit RISC Microcontrollers • In System Programmable also via CAN bus • second microcontroller with dedicated tasks • Optional 64 inputs of 16-bit ADC with 7 bit gain • General I/O • with 18 I/O, 8 Out and 8 IN (or ADC), 3 wire SPI • Flexible power supply circuits incorporated (4 ) • Est. cost is $2 / ch for ADC +CAN ATLAS DCS Workshop 2-3 Oct 2000

  11. Measurements of theELMB Current Consumption ATLAS DCS Workshop 2-3 Oct 2000

  12. Measurements ATLAS DCS Workshop 2-3 Oct 2000

  13. 2.5 to 4V operation of the 5V ELMB ATLAS DCS Workshop 2-3 Oct 2000

  14. Power ELMB • CAN controller ~20mA @ 5V (CAN specs) • Microcontrollers Digital I/O • 5V 33mA • 3.3V 15mA • ADC ~10mA @ 5V • OK for operation of the 5V ELMB with digital I/O in a 3.3V system • with voltage doubler ADP3607 ATLAS DCS Workshop 2-3 Oct 2000

  15. ELMB ADC ATLAS DCS Workshop 2-3 Oct 2000

  16. Crystal CS5523 Delta-Sigma ADC 2 Hz to 100 Hz ±25 mV to ±5 V differential Resolution 16 + 7 Bits CMR DC, 50Hz 120 dB Linearity ± 0.0015% FS Offset ± 2 LSB Stability 20 nV / ºC Gain 1 ppm/ ºC Not Accurate has to be calibrated! ATLAS DCS Workshop 2-3 Oct 2000

  17. ELMB ADC 1uV ATLAS DCS Workshop 2-3 Oct 2000

  18. ELMB ADC ATLAS DCS Workshop 2-3 Oct 2000

  19. High precision temperature principle After calibration ~3 mK precision at ATLAS LAr calorimeter ATLAS DCS Workshop 2-3 Oct 2000

  20. ELMB Motherboard for prototypes and tests ATLAS DCS Workshop 2-3 Oct 2000

  21. ELMB motherboard for tests in DIN rail housing ATLAS DCS Workshop 2-3 Oct 2000

  22. Motherboard • Signal adapaters for PT100, NTC and voltages • 18 pin DIL sockets • Plug-in on back-side • One for every 4 inputs • Many type of sensors can be mixed ATLAS DCS Workshop 2-3 Oct 2000

  23. ELMBRadiation Tolerance Critieraaccording to the ATLAS POLICY ON RADIATION TOLERANT ELECTRONICS ELMB: ----- * Will be used in MDT and in TGC. * Contains CMOS devices, bipolar devices, and optocouplers. * Foreseen radiation constraint in MDT barrel 1: - TID: 4.7 Gy x 3.5 x 5 x 4 = 330 Gy 33 krad in 10 years; - NIEL: 3.0E10 n/cm2 x 5 x 1 x 4 = 6.0E11 n/cm2 (1 MeV eq.) in 10years; - SEE: 5.4E9 h/cm2 x 5 x 1 x 4 = 1.1E11 h/cm2 (>20 MeV) in 10 years. ATLAS DCS Workshop 2-3 Oct 2000

  24. Quant Component Techn. TID (Gy) NIEL (n/cm2) SEE Comments 1 ATMEGA103-6AC CMOS - - - NEW 1 AT90S2313-10SC CMOS ~30010 13 - If not programmed during irradiation 1 SAE81C91 CMOS ~300 10 13 - 1 PCA 82C250T Bipolar ~300 10 13 - 3 MIC5203-5.0BM4TS Bipolar - - - NEW 1 MIC2754MBM5TS CMOS - - - NEW 1 ADP3607AR CMOS - - - NEW 2 HCPL-0601 Opto - - - NEW 5 BAV70W diode Bipolar ~300 10 13 - 4 BAT54W diode Bipolar - - - NEW 1 74HC1G66GW CMOS - - - NEW 1 CSTCC8.00MG Quartz - - - NEW 2 Quartz 32kHz SMD Quartz ~300 10 13 - 1 CS5523-AS CMOS - - - NEW, better specs 16 MAX4582CEE CMOS - - - NEW, Analog Devices TID failed (75Gy) 1 AD680JR Bipolar ~300 10 13 - 1 MAX871EUK CMOS - - - NEW 1 NC74S14M5 P CMOS - - - NEW 1 74HC74ADT CMOS - - - NEW 4 NC7SZ00P5 CMOS - - - NEW 3 HCPL-0731 Opto ~300 >3 10 12 -Siemens NIELfailed at 3 1011 n/cm2 1 LMC6064 CMOS CMOS - - - NEW ATLAS DCS Workshop 2-3 Oct 2000

  25. Measurements on optocoulers ATLAS DCS Workshop 2-3 Oct 2000

  26. Summary Status of H.W. • The printed circuit board of the ELMB has been tested and is ok! (Only fixation holes 1.6mm instead of 2.4mm) • 20 pc is in production (15 Oct 2000) • Printed circuit board of the Motherboard is ready • 20 prototypes will be available end of Oct 2000 • Radiation tests are planned for February 2001 • A first series of the ELMB will be produced to the Summer of 2001. • Some components are on allocation! ATLAS DCS Workshop 2-3 Oct 2000

More Related