1 / 20

Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans

Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans. Dr. R. Dubey - DMI. New concept and thought is required Monitoring and implementation is also required Knowledge dissemination is also required in a new way

farren
Download Presentation

Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans Dr. R. Dubey - DMI

  2. New concept and thought is required • Monitoring and implementation is also required • Knowledge dissemination is also required in a new way For all above new tools, are required: - Application of IT - Involvement of like minded institutions and persons - Networking for enrichment of the concepts

  3. OSHAS 18001 describes the HIRA and total emergency management • Manufactures, Storage and Import of Hazardous Chemicals (MS&IHC) Rules 1989 • Schedule 11 and 12 (On-site & Off-site Emergency management Plans ) • Clear approach and evaluation is missing

  4. System description Hazard identification Scenario identification Accident probability Accident consequences Risk determination risk & hazard acceptable ? N Modify design Y Accept system Hazard Ident. / Risk Assess. Procedure HAZARD IDENTIFICATION METHODS: - Process hazard checklist - Hazard survey: DOW index - HAZOP hazard & operability study - Safety review RISK ASSESSMENT: - What can go wrong & how ? - What are the chances ? - Consequences ? EXTREMES: - Low probability - Minimal consequences

  5. Lets think

  6. Answer

  7. ???

  8. ????

  9. ??????

  10. Conclusion • Not a single answer • Encouragement for those willing to do honest efforts in risk reduction by doing HIRA and application in total emergency management planning • Constitution of Task Force in next few workshop for building www.hrdp-idrm.in

More Related