LURA AMBIENTE Spa. Sede PLIS del Lura, 22 Marzo 2010. STATO INFRASTRUTTURE FOGNARIE AL 31/12/09 (1). Per quanto riguarda le reti miste Lura Ambiente Spa gestisce, per conto dei Comuni associati, n. 40 sfioratori sul torrente Lura o relative rogge afferenti.

Download Presentation

Sede PLIS del Lura, 22 Marzo 2010

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Sede plis del lura 22 marzo 2010

LURA AMBIENTE Spa

Sede PLIS del Lura, 22 Marzo 2010


Sede plis del lura 22 marzo 2010

STATO INFRASTRUTTURE FOGNARIE AL 31/12/09 (1)

Per quanto riguarda le reti miste Lura Ambiente Spa gestisce, per conto dei Comuni associati, n. 40 sfioratori sul torrente Lura o relative rogge afferenti.

Tutti questo manufatti sono autorizzati e risultano adeguati.

Nell’ambito del S.Q. interno vengono effettuati controlli trimestrali sui manufatti.


Sede plis del lura 22 marzo 2010

STATO INFRASTRUTTURE DEPURATIVE AL 31/12/09 – L’IMPIANTO DI CARONNO PERTUSELLA

  • Nell’anno 2009 al fine di garantire il corretto funzionamento dell’impianto sono stati eseguiti:

  • 3.172 Controlli interni nelle sezioni d’impianto.

  • 60 controlli sulle reti fognarie

  • 2 controlli sul collettore

  • 2 controlli sul torrente Lura

  • 171 controlli nelle aziende


Sede plis del lura 22 marzo 2010

LE PERFORMANCE DEPURATIVE AL 31/12/09 - (1)


Sede plis del lura 22 marzo 2010

LE PERFORMANCE DEPURATIVE AL 31/12/09 - (2)

NUOVO LIMITE NORMATIVO DAL 01/01/09

MEDIA ANNUA Ntot < 10 mg/l

VALORE LURA AMBIENTE

2009: Ntot = 8,6 mg/l

NUOVO LIMITE NORMATIVO DAL 01/01/09

MEDIA ANNUA Ptot < 1 mg/l

VALORE LURA AMBIENTE

2009: Ptot = 0,7 mg/l


Sede plis del lura 22 marzo 2010

INTERVENTI ESEGUITI CON RILEVANZA SUL TORRENTE LURA

  • REVAMPING SEZIONE DI OSSIDAZIONE PRESSO L’IMPIANTO DI CARONNO PERTUSELLA (2006)

  • IMPLEMENTAZIONE SISTEMA DI DOSAGGIO POLICLORURO DI ALLUMINIO (2008)

  • IMPLEMENTAZIONE SISTEMA DI DOSAGGIO BIOCARBONIO IN SEZIONE NITRIFICAZIONE /DENITRIFICAZIONE (2008)

  • INSTALLAZIONE SCUM BOXES SEDIMENTATORI SECONDARI (2003 – 2004)

  • PIANI TRIENNALI 2001 – 2004 e 2004 – 2007 SULLE RETI ACQUEDOTTISTICHE E FOGNARIE PER UN IMPORTO COMPLESSIVO DI CIRCA € 5.900.000, CON DIVERSI INTERVENTI DI RIFACIMENTO DI RETI AMMALORATE E MANUTEZIONI SU SCOLMATORI.

  • PIANO TRIENNALE 2007 – 2010 IN CORSO PER UN IMPORTO GIA’ FINANZIATO DI CIRCA € 2.800.000.

  • RILIEVO E MAPPATURA COMPLETA INTERA RETE FOGNARIA GESTITA (2004-2005) CON RELATIVA MODELLIZZAZIONE.

  • DIGITALIZZAZIONE RETI FOGNARIE E IMPLEMENTAZIONE S.I.T. (IN CONTINUO AGGIORNAMENTO)


Sede plis del lura 22 marzo 2010

POSSIBILI MACROINTERVENTI DI MIGLIORAMENTO CON RILEVANZA SUL TORRENTE LURA

  • REVAMPING SEZIONE DI FILTRAZIONE FINALE PER ABBATTERE I COSTI DI ESERCIZIO E MIGLIORARE ULTERIORMENTE LE PRESTAZIONI.

  • RIFACIMENTO SEZIONE DI GRIGLIATURA IN INGRESSO ALL’IMPIANTO.

  • OTTIMIZZAZIONE SCOLMATORI

  • IMPLEMENTAZIONE NUOVI PIANI TRIENNALI PER INTERVENTI DI RIFACIMENTO E ADEGUAMENTO TRATTI FOGNARI AMMALORATI


Sede plis del lura 22 marzo 2010

GRAZIE E ARRIVEDERCI …………..

CONTATTI:

LURA AMBIENTE Spa – VIA LAINATE, 1200

21042 CARONNO PERTUSELLA (VA)

TEL. 02/9655646 – FAX. 02/9659422

Mail: [email protected]

Web: www.lura-ambiente.it


  • Login