Test program
Download
1 / 8

Test Program - PowerPoint PPT Presentation


  • 122 Views
  • Uploaded on

Test Program. Test Program: Accomplishments. Completion of Systems document Hardware: Purchase requests submitted Hardware installation completed for new racks and networking equipment NEIS Beta release: April 2014 Website and CoG projects created. Test Program: In Progress.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Test Program' - faraji


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Test program accomplishments
Test Program: Accomplishments

  • Completion of Systems document

  • Hardware:

    • Purchase requests submitted

    • Hardware installation completed for new racks and networking equipment

  • NEIS Beta release: April 2014

  • Website and CoG projects created


  • Test program in progress
    Test Program: In Progress

    • Verification:

      • Preparation of EMC-like system for HIWPP

      • Development of new MySQL database

      • Coordination with NCEP on verification requirements

  • Testing of new gateway for transfers between zeus and GSD

  • Development of new ensemble post-processing techniques using sample data collected


  • Test program next steps
    Test Program: Next Steps

    • Installation of new storage and compute hardware

    • Making NEIS available to Beta testers and gather feedback

    • Building components for data distribution

    • Testing infrastructure and data flow

    • Set up real-time monitoring and support


    Issues
    Issues

    • Have lost key personnel in Verification, NEIS, and IT

      • Hiring in progress


    System document
    System Document

    4. System Design Description

    • Components and Interface

    • System Architecture - Hardware and Networking

    • NEIS Design

    • Real-time Distribution Design

    • Verification Design

    • Ensemble Post-Processing Design

      5. Data

    • Data Sets

    • Data Formats and Configurations

    • Data Flow

    • Data Lifecycle

      6. Support and Maintenance

    • Real-time Support

    • Documentation

    • Software Defect Handling

    • Lifecycle Maintenance

    1. Overview

    • System Description

    • Other relevant documents

      • HIWPP Project Plan

        2. Planning and Management

    • Schedule

    • Resources

    • Configuration Management

    • Software Development Process

    • Change Control

      3. System Requirements

    • NEIS

      • Functional requirements

      • Performance requirements

      • User interface requirements

    • Real-time Data Distribution

      • Functional requirements

      • Availability requirements

    • Verification requirements

    • Ensemble Post-Processing requirements


    Data sets real time model data
    Data Sets – Real-time Model Data

    • HIWPP Hydrostatic models

      • FIM-1 (on jet)

      • FIM-2 (on zeus), alternate? (Alternative DA, physics, or other)

      • GFS research version for HIWPP

      • GFS alternate?

      • NAVGEM

      • NAVGEM alternate?

    • HIWPP Non-hydrostatic models

      • NIM

      • NMMB

      • NEPTUNE

      • HIRAM

      • MPAS

    • Ensemble Data

      • FIM Ensemble

      • Experimental Ensemble Product

    • GFS Operational Data

    • GEFS Operational Data

    • Initial conditions (from GFS Operational)


    Data specifications review
    Data Specifications - review

    Format: GRIB2

    Frequency

    • Hourly for days 1-7

    • 6-hourly for days 1-14

      Resolution

      FIM: 1/8 degree lat/lon GFS, NAVGEM: 1/4 degree lat/lon

      Vertical levels

    • Isobaric levels

    • Increments of 25 hPa from 1000 hPa to 100 hPa, then 70/30/20/10/5/1 hPa

      Variables – 3D

      H RH

      T Condensate

      U Vertical velocity

      V

      Additional 2D variables

      2m temp 10m wind

      precip-total precip-convective snow water equivalent

      MSLP surface pressure surface elevation

      80m u/v precipitable water RH w.r.t PW OLR

      dynamic tropopause: potential temperature u/v pressure

      sensible heat flux latent heat flux

      downward shortwave radiation downward longwave radiation

      cloud-top height