Goals for Step 1 Infrastructure Drawings, Layout Air Flow Calculations Specifications/Prototypes of Equipment Cabinets, Acid-Resistant Locks & Ducts, etc. Procedures Drafts Packet to D.H. by Nov 22 nd Submission to Directorate by Nov 27 th. Facility Refurbishing (Sect. 3.1). Goals

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Goals for Step 1 Infrastructure Drawings, Layout Air Flow Calculations' - fancy


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  • Goals for Step 1

    • Infrastructure Drawings, Layout

    • Air Flow Calculations

    • Specifications/Prototypes of Equipment

      • Cabinets, Acid-Resistant Locks & Ducts, etc.

    • Procedures Drafts

  • Packet to D.H. by Nov 22nd

  • Submission to Directorate by Nov 27th


Facility refurbishing sect 3 1
Facility Refurbishing (Sect. 3.1)

Goals

  • (Estimate & Design to) Build air-ducts for intake of return duct to middle of lab

  • (..) Build air-ducts to move room supply ventilation toward middle of the room

  • (..) Build exhaust stack for ventilation hood

    Tasks and People

  • Design/Drafting Frank

    • Supervision/IB3 Experience Christian

  • Air-Flow Calculations Christian

    • Crosscheck Charlie

  • Material Prototype & Estimate Charlie

  • Work/Time Estimate Gregg


New equipment installation sect 3 2
New Equipment Installation (Sect. 3.2)

Goals

  • (Estimate to) Install recently purchased chemistry Hood.

  • (Estimate & Proposal to) Procure chemical cabinets with spill containment and fume removal features

  • (Estimate & Proposal to) Lock Cabinets and Chemical Waste Disposal Area

    Tasks and People

  • Material Prototype & Estimate Charlie

  • Work/Time Estimate Gregg/Charlie


Acid transportation sect 3 3
Acid Transportation (Sect. 3.3)

Goals

  • (Estimate to) Procure HDPE acid Carrier boxes.

    Tasks and People

  • Material Prototype & Estimate Charlie


Additional modifications sect 3 4
Additional Modifications (Sect. 3.4)

Goals

  • (Est. & Design to) Enclose etching area in pseudo-enclosure.

  • (Estimate to) Mount panic exit-bars-only on MDTL doors.

  • (Est. & Design to) Install secondary containment on the floor.

    Tasks and People

  • Design/Drafting Frank

    • Supervision/IB3 Experience Christian

  • Air-Flow Calculations Christian

    • Crosscheck Charlie

  • Material Prototype & Estimate Charlie/Dave

  • Work/Time Estimate Gary (Panic bars)

    Gregg (Enclosure)

    Charlie (Floor)

  • Life Safety Aspects Rich


Etching procedures sect 4 1 4 2
Etching Procedures (Sect. 4.1 – 4.2)

Goals (Step 1, 2 & 3 Goals are similar)

  • 1st Drafts of Etching & Disposal Procedures

  • 1st Draft of Emergency (Spill) & Medical Procedure

    Tasks and People

  • Organization/Setup/DCS Jamie

  • Technical Input Donna (main), Christian, Claire, Charlie, Alan

  • Revision/Approval Charlie

  • Safety Overview Rich



Training sect 5
Training (Sect. 5) is mentioned !

Goals

  • Finalize and Review Training Documentation

    Tasks and People

  • Training Preparation Dave Baird

  • Technical Review Charlie

  • Safety Review Rich (TD)

    ??? (AD)