An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New BC3 RF Building LIU-SPS 200 MHz RF power upgrade

  2. New proposed area : BC3

  3. Close to BA3 + BB3 = BC3 BC3 New RF Amplifiers 929 RF workshop • All main RF equipments around • Close to RF workshop • Take advantage of ‘nearly empty’ GT10 gallery to install 350 mm RF coaxial transmission lines Easiest path to the pit • Access through 929 RF workshop • Reserved place for BB3 transformers • if needed in the future to replace oil transformers to cast resin transformers BA3 Siemens BAE3 Philips BB3 800 MHz RF Faraday Cage GT10 Gallery La dalle pour nouveaux transformateurs 28m x 4m

  4. Surfaces • Total surfaces: • Basement : 19.5 m x 36.5 m = 710 m2 • Mezzanine : 475 m2 • Total = 1185 m2 • Total surfaces for RF: • Basement = 550 m2 • Mezzanine = 475 m2 • Total = 1025 m2 • RF amplifiers : • Tubes solution : 1030 m2 • Tubes & combiners = 330 m2 • Drivers & controls = 200 m2 • Power supplies = 300 m2 • Cooling = 200 m2 • SSA solution : 1185 m2 • SSA = 825 m2 • Controls = 180 m2 • Power supplies & cooling = 180 m2 36.5 m 19.5 m

  5. Schedule 2011 2012 2013 2014 2015 2016 2017 2018 2019 Studies Tendering Construction Installation LLRF Design and proto Commissioning Start up LLRF Tests New RF Power Amplifiers and LLRF LLRF Series 2012 : Authorizations 2013 : Construction, NOT linked with LS1 Building ready end 2014 before first amplifier installation Services ready six months later for commissioning Studies Construction Cavities Pickups vacuumCV, EL LSS3 Tunnel Integration coaxial lines, Pickups Spare sections New power couplers Studies Authorizations Construction New RF Building Services (CV, EL) #2

  6. Budget Initial estimate (all inclusive) Basement 900 m2 + Mezzanine 450 m2 = 4’500 kCHF / 2.5 FTE CV & EL = 1’800 kCHF / 3.0 FTE Total = 6’300 kCHF / 5.5 FTE Building will be a bit smaller, budget difference will be useful for ‘un-scheduled’ issues

  7. Teams in charge