Bond construction update facilities advisory committee
Sponsored Links
This presentation is the property of its rightful owner.
1 / 16

Bond Construction Update Facilities Advisory Committee PowerPoint PPT Presentation


  • 78 Views
  • Uploaded on
  • Presentation posted in: General

Bond Construction Update Facilities Advisory Committee. Long Beach Community College District November 9, 2011. EDUCATE  ENGAGE  EMPOWER. Agenda. Completed Construction Projects LAC W Trailers Demo PCC Tech 1 (Sheet Metal) Current Construction Projects

Download Presentation

Bond Construction Update Facilities Advisory Committee

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Bond Construction Update Facilities Advisory Committee

Long Beach Community College District

November 9, 2011

EDUCATE ENGAGE EMPOWER


Agenda

  • Completed Construction Projects

    • LAC W Trailers Demo

    • PCC Tech 1 (Sheet Metal)

  • Current Construction Projects

    • LAC Building A – Student Services Retrofit

    • LAC Building I (Bookstore)

    • LAC Master Landscape

    • LAC Stadium Parking Lot Lights and Veterans Stadium Lights

    • PCC MDAB (Multi-Disciplinary Academic Building)

    • LAC PCC Building CC Retrofit

  • Upcoming Construction Projects

    • LAC Math Technology Building

    • PCC Building GG

    • LAC Building C Retrofit

  • Q & A


Completed Construction Projects

LAC W Trailers Demo - Measure E 2008

  • Project addressed storm run off issues with bio swales

  • Site converted to a parking lot

  • Project completed Summer 2011


Completed Construction Projects

PCC Tech 1 (Sheet Metal) - Measure E 2008

  • Construction started Summer 2011

  • Equipment and utilities installed

  • Projected completed before start of Fall semester 2011


Current Construction Projects

LAC Building A – Student Services Retrofit

Measure E 2008

  • New home for A&R, Counseling, Health Services, Cashier, Transfer Center

  • Project currently in structural upgrade

  • New contractor in place

  • End of construction anticipated Summer 2012


Current Construction Projects

LAC Building I - Measure E 2008

  • Adds additional 4,000 square feet to existing building

  • Architecture to match LAC Mediterranean Theme

  • Work on framing and utilities underway

  • End of construction anticipated Fall 2011

  • Move in planned for late January or early Feburary


Current Construction Projects

LAC Master Landscape - Measure E 2008

  • Currently in Design Phase(Finalizing design)

  • Plans to be submitted to DSA November 2nd

  • Quad areas North and South of Bldg. A will bid Fall 2011

  • Remaining areas designed at 25%

  • Scope includes new hardscape/landscape and pedestrian pathways


Current Construction Projects

Stadium Parking Lot Lights and Stadium Lighting Measure E 2008

  • Stadium parking lot lights

    • Construction commenced 9/12

    • All bases have been installed

    • Currently in the process of installing light poles/fixtures

    • Install energy efficient lights with controls capabilities

  • Stadium lighting retrofit

    • Awaiting final DSA approval


Current Construction Projects

PCC MDAB

(Multi-Disciplinary Academic Building)

Measure E 2008

  • MDAB building remodel project

  • Phase 1 of 2 currently under construction

  • Project currently in demolition and structural reinforcement

  • Phase 1 Project to be completed Summer 2012


Upcoming Construction Projects

PCC Building CC Retrofit - Measure E 2008

  • Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices

  • Swing space located on PCC Campus (Bldg. GG)

  • Approved by DSA on 1/27/11

  • Bid process complete. Awarded to Angeles

  • To be completed concurrently with MDAB project phase 1

  • Anticipated end of construction Fall 2012


Upcoming Construction Projects

Will house Math and Culinary Arts instructional program as well as Reprographics

Design Build delivery method

Requesting Qualifications (RFQ) – was due 8/3

Shortlisted and interviewed 10 respondents (9/7-9/9)

Selected 3 and are currently requesting for proposals

Pre-RFP meeting with contractors to take place on 10/27

Anticipated start of construction 2013

LAC Math Technology Building – Measure E 2008


Upcoming Construction Projects

PCC Building GG - Measure E 2008

  • Design Build delivery method

  • Request for Qualifications (RFQ)

    • Start in November and due mid December

  • Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R, and Counseling

  • Estimated start of construction December 2013


Upcoming Construction Projects

LAC Building C Retrofit - Measure E 2008

  • Hired Architect to do design work

  • Currently in schematic phase

  • Work includes modernization of structure, classrooms spaces, and office areas


Liberal Arts Campus

Site Plan

l i b e r a l a r t s


Pacific Coast Campus

Site Plan

p a c i f i c c o a s t