An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overhead Delivery Issues Update of NESC Subcommittee #5 Activities 2004 APPA E&O Joseph Rempe, P.E. Principal Engineer T&D, Tacoma Power APPA Representative on SC5

  2. What the NESC IS and What it is NOT • It IS a Performance Code – Set the minimum standard for operating performance. • It is NOT a design standard (ie. NEC) – It is not intended to be the design processes by which lines are designed. • A difficult act to maintain – the Nature of Engineers.

  3. Highlighted Proposed Changes for the 2005 NESC being considered by SC5 • Rule 250B – New Ice & Wind Loading Map • Rule 250C - 60 foot exclusion removed and Extreme Wind considered on all Distribution Structures. • New Rule 250D – Construction & Maintenance Loads

  4. Changes Cont. • Rule 261 - FRC (Fiber Reinforced Composite) acknowledged and accepted similar to Steel and Pre-Stressed Concrete. • Rule 277 – Insulator Strength • Section 25, 26, & 27 rewrite to reflect Reliability Based Design methodology of applying loads and structure strength.

  5. Rule 250B – Ice & Wind Loading • To include ASCE 7 Ice and Wind map. • Developed after the “Perfect Storm” crushed the NE and Eastern Canada • Cold Regions Research and Engineering Lab (CRREL) of the Army Corps of Engineers (Kathy Jones) & Bonneville Power Administration

  6. Rule 250B – Ice & Wind Loading Continued • Conductor Clearances is being addressed by Sub-Committee #4.

  7. Rule 250C – 60 foot exclusion • All wind data taken at 10m (33 ft.) [Can the current statement be defended in court?] • Larger Distribution Conductors and more Telecommunications attachments • Distribution Line Failures – typical rural line crossing over a hill: Bernoulli Effect • Most areas will not see the controlling load change from current practices for Grade C Construction.

  8. Rule 250C – Continued • Coastal areas are major exceptions. The rule change will limit wind pressure for Grade B design to withstand Class 2 hurricane strength winds. (Winds above this do major structure and vegetation damage that are not reasonable to design for) • Grade C max 15psi, Grade B max 22psi

  9. New Rule 250D – Construction and Maintenance Loads • Intent of new rule is to ensure a safe structure for workers to climb and/or work on from initial construction through replacement. • Rule 263A reference for Grade N construction

  10. Rule 261 - Fiberglass Reinforced Composite (FRC) Poles • The sub-committee has received a change proposal that supports the inclusion of FRC Poles in the same manner as Steel and Pre-Stressed Concrete Poles. • New ASCE Engineering Practice #104 for design using FRC Poles.

  11. Rule 277 – Insulator Strength • A presentation by ANSI C29 Committee to SC5 highlighted failure tests performed on Ceramic and NCI insulators. (Endurance factors need to be seriously considered when loading of Insulators.) • Sufficient concern was expressed by members of SC5 that a CP was created to address findings of ANSI C29 Committee. • Rule 253 would include new Rule 253B and new Table 253-3 for Support Hardware and Insulators.

  12. Section 25, 26, & 27 Rewrite • ANSI is developing a manual for designing structures following the Reliability Based Design (RBD) methodology for applying loads and selecting support structures and hardware. • To reflect the work of the RBD Task Force.

  13. Please Join Me on SC5! We have a chair open for you! History Stories Your input on the process A chance to visit Piscataway, NJ Contact Mike Hyland.