CONSTRUCTION LTD

CONSTRUCTION LTD. P R E S E N T A T I O N. Rustavi 2013.

etoile
Download Presentation

CONSTRUCTION LTD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONSTRUCTION LTD P R E S E N T A T I O N Rustavi 2013

  2. Construction LTD represents Rustavi metalwork construction plant manufacturing steel constructions of any kind and complexity. It was founded by physical entities. The factory has an area of 5.5 hectares. Out of this land industrial building occupies 2,7 hectares. The plant has 35 year history. There have been manufactured 700000 tones of welded steel constructions. For the time being, the plant uses both modern and traditional technologies, has highly qualified and experienced engineer technical personnel to produce high quality welded steel constructions applying automatic and semi-automatic welding techniques. Construction LTD has established long-term business cooperation with leading steel suppliers in Ukraine, China, Turkey, Kazakhstan. Furthermore, the company collaborates with primary European firms in the field of modern equipment and materials. Construction LTD has trade representatives in Turkey (Istanbul, Rize) and Austria (Vienna).

  3. The initial mission of Construction LTD was to provide southern part of Russia and Caucasus region countries (Armenia, Azerbaijan) with structural steel for both - industrial as well as civil construction. Nowadays, our production capacity enables us to restore our original assignment using the logistic advantages such as railway , motorway etc.

  4. Currently employed : • Management -15 Prs. • Workers – 200 Prs. • Qualified engineer personnel- 30 Prs. • Area -22000 sq. m. • Current annual production – 12000 tones of welded steel constructions • In case of making re-equipment, plant’s annual productivity can reach up to 50000 tones of steel welded constructions.

  5. Factory’s production list: • Roofing steel structures • Structural steel for industrial building • Steel monuments with various architectural design • Structural steel for civil construction • Steel framed buildings • Hydro technical equipment

  6. Mig/Mag welding equipment • Bridge cranes 6 units : 2-20 tones, 2-10 tones, 2-5 tones • Plasma/oxy cutting machine CNC controlled • Manual plasma cutting machines • Steel cutting guillotines – 2 Units • Plate rolling machines • Plate strengthening • Saw welding equipment • Profile bending machines • Hydraulic press breaks • Pipe bending equipment • Milling machine • Turning machine • Drilling machine (station, mobile) • Plates cutting out machine • Angle cutting machine • Compressors (various capacity) • Sandblasting, drop blasting equipment Factory’s production list: • Railway bridges • Road bridges • Railway wagons, hoppers, tanks • Electricity towers • Steel masts for various purposes • Steel reservoirs • Oil tanks with various capacity • Containers for special purposes • Shipping containers 20 ft, 40 Ft,

  7. State of the art • LABORATORY • KZO 50 oxygen filling unit PRODUCTION – O2 THE PURITY – 99,8 % THE CAPACITY – 200 CY. PER 24 HOURS Factory has a high class and advanced laboratory enabling the plant to check the production quality . Correspondingly, competent personnel can make ultrasonic checking of welded steel constructions and welded joints using the modern digital laboratory devices at both factory and erections sites, based on which, company issues test reports together with structural steel quality certificate.

  8. Projects: HEIDELBERG CEMENT PLANT IN RUSTAVI PROJECTS HEIDELBERG CEMENT PLANT IN RUSTAVI Steel structures quantity-4000 tones Contractor: Heidelberg Cement Status: Completed 100%

  9. Kempinski Hotel construction in Batumi Contractor: Promer engineering&Architecht Status: Completed 100%

  10. Status: Completed 100% Construction of Palace of Justice in Batumi Architected by: Favero&Milan ingegneria

  11. Radisson SAS Iveria Hotel Contractor: Uchgen Georgia Status: Completed 100%

  12. Avlabari State Residence in Tbilisi Contractor: Injhmsheni Status: Completed 100%

  13. Steel warehouses in Zugdidi. Contractor – Ferrero Agrigeorgia Status: Completed 100%

  14. Batching plants with fully automatic Control system. Ponichala, Gldani- Tbilisi. Status: Completed 100%

  15. Crisis management center in Tbilisi Status: Completed 100%

  16. Borjomi historical park-resort Status: Completed 100%

  17. Cement terminal in Supsa, Georgia Contractor: Heidelberg Cement Georgia Status: In Progress

  18. Fabrication of galvanized steel spike for Batumi University Contractor: Anagi LTD Status: In progress

  19. Construction of new customs terminal in Sarpi, at Turkey-Georgia. Contractor: Transmsheni J.S.C. Status: Completed

  20. Rustavi national auto track Status: Completed

  21. Rikhe exhibition & Music hall construction-Tbilisi, Georgia Status: In progress

  22. House of justice in Tbilisi Status: Completed

  23. Steel bridges on the Mtkvari river side Status: Completed

  24. Houses of justice in Telavi, Marneuli, Georgia. Status: Completed

  25. Tbilisi railway bypass project “Georgian Railway” LLC has launched the Tbilisi Railway Bypass Project for developing a new railway route that will bypass the central area of the city of Tbilisi. By moving certain railway infrastructure components from the centre of Tbilisi to the northern part of the city, freight and passenger trains will no longer transit through central Tbilisi. The Municipality of Tbilisi believes that this project will provide a number of benefits, including helping to alleviate future environmental and safety concerns and, because the move will make available commercially valuable land in central Tbilisi, fostering economic improvements and job growth in the city. Construction LTD was actively involved in mentioned project, company has delivered 6 units of railway steel bridges with all related components.

  26. HYDROPOWER SECTOR • Due to the high Hydro-Power Energy Potential • of Georgia and effective running process of Various • Capacities of HPP construction projects Construction LTD Has become a long termed supplier of following services&products in HPP projects: • Powerhouse steel buildings • Various types and capacity of gantry and overhead bridge cranes • Waterpipes and related hydro technical equpment (gates, lifting machines) Completed projects: MTKVARI HPP -Capacity - 36 MW Delivered: 36 meters Bridge, 125+20+5 MT overhead bridge crane, steel powerhouse building Ongoing projects: GUDAURI HPP-CAPACITY-8 MW To be delivered: Powerhouse building, 32 MT bridge Crane , water pipeline, turbine installation service ALAZANI 2 HPP-CAPACITY – 6 MW To be delivered: 25 MT overhead bridge crane

  27. Construction LTD established brand new industrial line in Georgia, company mutually with famous European vendors such as: Siemens, Schneider electrics, Kumsan vinc, Guralp vinc, started producing of Industrial cranes. Construction LTD has already launched 160 tones overhead crane for assembling TBM On Mtkvari HPP and 32 MT overhead crane for Gudauri HPP. • Production list • Overhead travelling cranes • Gantry cranes • Semi Gantry cranes • Jib cranes • Special designed transportation cranes • single & double girders for cranes

  28. WE CONSTRUCT SUCCESS . . . www.construction.ge 2 Mazniashvili st., 3700, Rustavi, Georgia Cell:+995 577 999906, +995 577947769 info@cs.ge Facebook.com/CONSTRUCTION