1 / 16

Items and actions

Items and actions. Modifications to current forecasts Website and data Research into future forecasts Organization and implementation. Summer 2009. Modification to current forecasts. Replace deterministic forecast 3-category probabilistic shading + contouring calibrate

etana
Download Presentation

Items and actions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Items and actions • Modifications to current forecasts • Website and data • Research into future forecasts • Organization and implementation

  2. Summer 2009

  3. Modification to current forecasts • Replace deterministic forecast • 3-category probabilistic shading + contouring • calibrate • shading limits and “no forecast” • skill measures • aesthetics and website • Canada map + skill is 1st order with links: • 3 category full probabalistic • skill measures • data • …..

  4. Other approaches

  5. Proposal (see also Kharin report) • calibrate • shade > 40% • no shade => “no forecast” or “other” • map over Canadian region • no pole • no US • only 1 shading bar (see examples) • add skill map • links to • full probability forecasts • skill scores • data • mean and s

  6. SK example

  7. Details • Calibrate using Kharin method • Shade above 40% • no-shade = “no-forecast” or “other” • attach skill measure (eg. % correct) • links to: • full probability forecasts • other skill measures • past forecasts etc., but better web design

  8. Website and data • monthly, seasonal forecasts mislabelled under “modelling and analysis” • need button on weatheroffice page which at least indicates “extended forecasts” • Actions • inform Chas Lin, D. Whelpdale, and others .. • set up Website Task Force Monthly and Seasonal forecasts

  9. Website design: Forecasts hard to find (at best)

  10. Website task force • set up task force for Monthly and Seasonal Forecast section of website • propose a (re) design of MSF section • separate section for MSF – “new” forecast on main page • cleaner look, hierarchy of links to: • 3-panel probability forecasts • verification information • up to date explanatory information • data • etc. • produce an explicit proposalfor MSF section • including review process to keep up to date • set time limits for design/proposal • lobby and demand/promote action

  11. Data hard to find/out of date

  12. Forecast data task force • mechanism to keep forecast data up to date • link to explanatory material on HFP2 • provide additional information • basic statistics, mean and s • other variables for applications • energy • agriculture • focus for interaction with data users

  13. Other forecasts • HFP2+ and CMC seasonal forecast evolution • extend HFP2 to present • add additional forecast models (AGCM4, CHFP1, …) • Subseasonal • CCCma participation • initially in Bin Wang intercomparison • CCCma/RPN “research plan”, resources • GLACE2/GOAPP • surface initialization effects • part of GOAPP in conjunction with GUELPH • GLACE2 intercomparison

  14. CHIP2 • CHFP = HFP but 1-tier, coupledmulti-season forecast project • GOAPP Theme II project • contribution to WGSIP “Climate-system Intercomparison Project” i.e. their CHFP • basis for WGDIP/WGCM/CMIP5 decadal climate forecasts • how do we plan for and exploit CHFP?

  15. CHFP/coupled forecasting task force • document and summarize: • international and Canadian approaches • planning for research and operations • path to operations • melding with current CMC monthly/seasonal forecasts • outputs and multi-seasonal skill • ice forecasting • treatment on website • data availability • international aspects • supplying of forecasts to APCC • accessing and combining with other forecasts • contribution to WGSIP CHFP

  16. Other items • EC Resources for SIP • initial 1+1 “shared” personnel for SIP concentrated at RPN and CMC • at minimum need similar at CCCma • CFCAS/external resources • 1-year no-cost extension means some GOAPP effort to continue for a few months • prospect for CFCAS replacement seems dim • GOAPP report/meeting with EC and DFO – opportunity to stress: • activities in other G8 countries compared to Canada • amazing leveraged results with micro-resources • need for EC resources to continue progress • computing • highly trained personnel, one of the outputs of GOAPP • international efforts in SIP and applications of short term climate predictions

More Related