1 / 11

GDPs in Support of SWAP

This document from Metron, Inc. provides guidance and analysis for the development of GDPs (Ground Delay Programs) for SWAP (Slot/Window Allocation Procedure) efforts. It discusses considerations for determining which airports and centers to include, as well as setting appropriate rates to reduce delays and control airspace volume.

estarner
Download Presentation

GDPs in Support of SWAP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GDPs in Support of SWAP Development of Guidance Material Metron, Inc Dec 14, 2000 Metron

  2. GDPs for SWAP Efforts • Guidance Material / Analysis - For S2001 • Exclude Center - For S2001 • GDP By Multi Fix • GDP By Multi Airport • GDP By FCA • Other Ideas Metron

  3. GDP Guidance • Consider GDP Goals • Reduce Airspace Volume • Reduce Arrival Rate to Control Departure Delays Metron

  4. Approach • Use Analysis of Historical Data to Provide a ‘Guide’ • Guide Can Be Used to Determine; • Which Airports Need to be Included • Which Center to Include, Exempt, or Exclude • What Rates Should Be Used • What Start and End Times Should be Used • Available to All CDM / SPT participants Metron

  5. How Rates Are Set • Evaluate Historical Data to Determine Average Demand • Between Centers • Through ARCS • Through Sectors • Based on Highest Demand Airports Provide Suggestions • Which Airports Should Have GDPs • What Rates Should be Used • Which Facilities Metron

  6. ZNY Demand Metron

  7. ZOB to ZNY Flows Metron

  8. ZDC to ZNY Flows Metron

  9. ZOB to ZNY Flowsw\ Excluded Centers Metron

  10. Critical Factors • All Programs Need Clearly Understood Goals • Post Event Analysis • Feedback and Adjustment of Guidance Metron

  11. Outstanding Issues • Handling of CNX’s & Subs • Accuracy and Stability of Arrival Fix Prediction • Integration of Airspace Volume & Airport Constraint Programs • How to Set Airport Rate To Meet Airspace Constraints (Variable Rate) Metron

More Related