1 / 5

Visual Design Project

Visual Design Project. By: S tephanie Clark, S arah K im, and Gracie Reber. Team norms!. Team norms Set due dates must be met within two days. Each due date set within group must be reasonable and consensual. Post an update- as to progress- at least once a week.

eshana
Download Presentation

Visual Design Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Visual Design Project By: Stephanie Clark, Sarah Kim, and Gracie Reber

  2. Team norms! • Team norms • Set due dates must be met within two days. • Each due date set within group must be reasonable and consensual. • Post an update- as to progress- at least once a week. • No design decision is to be made without consent of the whole group by vote. • No ideas are dumb. Any and all ideas are welcome. • All questions are welcome. • Every member must participate in the project. • We should find each other strengths and such. EX: that if someone is better at sketching we will let them do that. Someone’s better at inventor they do more of the building. Or proofing and editing. • HAVE FUN!!! • Consequences if norms are not met • If deadlines are not met first there will be a group intervention (email), then members talk with Mrs. Stracina, last, deadweight kicked out of group • If not dates are not reasonable they will be discussed and reset • If you do not post an update the team will assume you are not working and will begin the steps of intervention listed above. • If ideas are insulted there will be intervention. • If a decision is made without consent then consequences will be equal to those of missed deadlines. • Exceptions: • Illness: if ill the dates will be moved back the number of days absent • Miscommunication: if you do not understand a group decision ask questions and decision will be explained or reconsidered.

  3. Timeline • Day 2’s schedule • 4/18-Norms • 4/19-Timeline • 4/19-Design brief • 4/20-Sketches • 4/26 and 5/6- Team evaluation • 4/26 and 5/6- Self evaluations • 5/2-IDW creations of each part • 5/2-IDW of exploded view • 5/6-Power point presentation • Day 1’s schedule • 4/15-norms • 4/21-Timeline • 4/21-Design brief • 4/25-Sketches • 4/27 and 5/9-Team evaluations • 4/27 and 5/9-Self evaluations • 5/3-IDW creations of each part • 5/3-IDW of exploded view • 5/9-Power point presentation

  4. Sketches

  5. Our idws

More Related