nexus workgroup read v alidation scenarios
Download
Skip this Video
Download Presentation
Nexus Workgroup Read V alidation Scenarios

Loading in 2 Seconds...

play fullscreen
1 / 5

Nexus Workgroup Read V alidation Scenarios - PowerPoint PPT Presentation


  • 192 Views
  • Uploaded on

Nexus Workgroup Read V alidation Scenarios. 4 th December 2013. Background. Read Validation rules and tolerances developed during the Settlement BRD

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Nexus Workgroup Read V alidation Scenarios' - erich-hester


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
background
Background
  • Read Validation rules and tolerances developed during the Settlement BRD
  • Concern raised at 30th October workgroup that the tolerances may not be appropriate for Class 4 sites as a ‘flat profile’ is used (AQ / 365 x no. of days in period).
  • Workgroup agreed the principle of read validation was correct but would like to examine the tolerances further
  • The following slides provide a list of various scenarios considered by Xoserve during analysis of the AQ requirements to validate the principles & tolerances described in the BRD
scenarios
Scenarios
  • AQ = 1
    • Reason: the site has not been consuming gas for over 9 months
    • Consequence: read will fail validation
    • Outcome: AQ Correction process used to re-calculate the AQ then re-submit the read
  • AQ is significantly higher or lower than sites predicted consumption
    • Reason: change in plant or site previously ‘mothballed’
    • Consequence: read may fail validation
    • Outcome: AQ Correction process used to re-calculate the AQ then re-submit the read
scenarios cont
Scenarios cont.
  • Site Isolated
    • AQ would carry over until 9 months consumption was available during the non-isolated period therefore read would not fail
  • Vacant site
    • AQ would reduce as reads are loaded with zero/low consumption over a period
    • If read fails due to the AQ being low, the AQ Correction process to be used to amend AQ
  • Round The Clock value incorrect/not populated
    • Read would fail due to out of tolerance
    • Re-submit read with correct ‘Round the Clock’ (TTZ) count
scenarios cont1
Scenarios cont.
  • Change of Class – Class 4 to 2
    • SOQ is used to validate the reads, Shipper nominates the SOQ
  • Change of Class – Class 2 to 4
    • Daily reads previously loaded for site and AQ reviewed monthly. Reads should therefore pass the validations based on AQ
ad