Evolve with EcoSystem
This presentation is the property of its rightful owner.
Sponsored Links
1 / 9

Best Practices For Test Environment Management | Enov8 PowerPoint PPT Presentation


Test Environment Management is the function of understanding your cross-life-cycle and establishing proactive controls to ensure they are effectively used in a timely manner. Visit us at : https://goo.gl/lmdwnB

Download Presentation

Best Practices For Test Environment Management | Enov8

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Best practices for test environment management enov8

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

EcoSystem EM*

IT & Test

Environment

Manager

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

Typically over 50% of

organizational Infra and

license spend is for “Non-

Production”. *Mismanagement

of Non-Prod can cost an

organisations tens of millions per

annum.

RISING COSTS

Problem Statement

Common issues organisations face:

• Test environment outages & instability

• Test environments are not “fit for purpose”

WEAK “IT & TEST ENVIRONMENTS

MANAGEMENT” IS A LEADING

CAUSE

OF

LOW

PRODUCTIVITY AND LEADS TO

INFRA & LICENSE OVER-SPEND.

• Slow and untimely environment operations

IT

PROJECT

• Large volumes of decentralised information

• Infrastructure proliferation & overspend

LOW PRODUCTIVITY

On average, 20% of Dev &

Test productivity is lost due

to Test Environments

inefficiencies. *DevTest

inefficiencies lead to IT project

delays, corner cutting & less

quality.

• Poor decision making through poor insight

• Unmanageable project contention & chaos

• Change, release & configuration errors

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

About

EcoSystem EM

Enov8 propose to improve

organisations IT Environment

Management capability through

the establishment of a platform

that drives “GMSA”.

The primary objectives of our

solution is to establish

transparency and “proactive”

controls where there was once

blind-spots & chaos.

BE AGILE WITH DISCIPLINE!

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

Key Features of

EcoSystem EM

• Environment Dashboards

• Event Calendaring

• Environment Reports

• Release Management

• Advanced / Visual CMDB

• Batch Coordination

• Environment Modelling

• Run Sheet / Ops Management

• Project Demand Management

• Orchestration & Integration

• Test Demand Management

Methods

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

EMMI – IT ENVIRONMENT MANAGEMENT MATURITY INDEX

EcoSystem EM

Functional Scope

Activity & Behaviour

Resource Usage

Availability

Enterprise CMDB

Book of Knowledge

Support Portal

Ecosystem EM suite is designed to address

eight key dimensions as described in our

EMMI.

Configure

Provision

Decommission

IT Project

Test Cycles

BAU Needs

1. Knowledge Management

2. Demand Awareness

3. Planning & Coordination

Extract

Transform

Load

Calendars

Batches

Run-Sheets

4. IT Service Management

5. Application Automation

6. Data Automation

7. Infrastructure Orchestration

8. Status Accounting & Reporting

Build

Deploy

Test

Changes

Incidents

Releases

Typical Capability

With EcoSystem

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

The EcoSystem

EM Operating

Model

An “out of the box” IT & Test

Environment Management”

framework promoting transparency,

control and productivity through an

uplift in environment:

• Governance,

• Measurement,

• Operational standardisation and

• Automation methods.

EXTENSIBLE

ENGINE

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

Key Benefits of establishing a EcoSystem EM Framework

PRODUCTIVITY

Streamlined IT

operations and

delivery

through ops

standardisation

& automation.

DELIVERY

Higher Dev &

Test productivity

through less

outages and

environment

stability.

Lower

infrastructure

and licence

costs via better

planning &

coordination.

Reduced

project service

costs via

sharing &

resource

consolidation.

Improved

transparency /

visibility through

information

centralisation &

aggregation

COSTS

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


Best practices for test environment management enov8

Evolve with EcoSystem

Govern > Measure > Standardise > Automate

Call: +61 2 8916 6391

www.enov8.com

Level 5, 14 Martin Place

Sydney, NSW, 2000


  • Login