IT Planning and Managment. Lecture 11: Big-Bang ERP Implementation at a Global Company Part 2: SETTING THE STAGE. Collage of Information Technology University of Palestine, Gaza. Prepared by: Mahmoud Rafeek Alfarra. قال أحد السلف الصالح:.

emma-dorsey
Download Presentation

IT Planning and Managment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IT Planning and Managment Lecture 11: Big-Bang ERP Implementation at a Global Company Part 2: SETTING THE STAGE Collage of Information Technology University of Palestine, Gaza Prepared by: Mahmoud Rafeek Alfarra

  2. قال أحد السلف الصالح: مساكين أهل الدنيا ... غادروها و لم يذوقوا ألذ ما فيها قيل : و ما هو ألذ ما فيها؟ قال: ذكر الله

  3. Outlines • SETTING THE STAGE • Y2K Problem and DSW • Enterprise Resource Planning (ERP) • CASE DESCRIPTION (introduction) • Students’ activities • System Request • Problems from VCR

  4. SETTING THE STAGE • Information Systems (IS) at DSW were custom developed specifically for DSW since the early 1970s, when the IS unit consisted of an IS manager, six data-entry clerks, three operators, and four programmers. • The first functions to be automated, in batch mode, were accounting, costing, and budgeting.

  5. SETTING THE STAGE • Upgrading … • The IBM 4331 mainframe computer • An IBM 4341 and a 4341-31 • Hierarchical DataBase Management System (DBMS)

  6. SETTING THE STAGE • With a DBMS in place: • DSW recruited a number of systems analysts • Expanded its IS group to include ten programmers • Adopting a systems approach and building integrated systems that replaced fragmented ones.

  7. DSW Structure Additional Changes Made additional Changes 

  8. Y2K Problem • By 1995 the DSW as for many other firms was well aware of the seriousness of the Year 2000 (Y2K) problem . • Resolution of the Y2K problem was critical to survival • Decision Making Leading to ERP Implementation solution

  9. Enterprise Resource Planning • The scope of this case study is focused on a big-bang implementation of an Enterprise Resource Planning (ERP) system at DSW. • There are many different systems in a large company's "back office," including planning, manufacturing, distribution, shipping, and accounting.

  10. Enterprise Resource Planning • ERPis a system that integrates all of these functions into a single system, designed to serve the needs of each different department within the enterprise. • Usually ERP systems will have many components including hardware and software, in order to achieve integration. • Most ERP systems use a unified database to store data for various functions found throughout the organization.

  11. CASE DESCRIPTION • The Vice President of Information Systems (VPIS) thus began to seriously consider avoiding Y2K conversion altogether . • At the same time, shifting from a “make” strategy to a “buy” strategy

  12. Next Lecture isa Reach The Gooooal