Sheeler avenue townhomes planned development
This presentation is the property of its rightful owner.
Sponsored Links
1 / 35

Sheeler Avenue Townhomes Planned Development PowerPoint PPT Presentation


  • 87 Views
  • Uploaded on
  • Presentation posted in: General

Sheeler Avenue Townhomes Planned Development. The Keewin Real Property Company, LLC. Evidence Book. Printed Slides of Powerpoint Presentation to Orange County BCC on 7/10/07 Professional Credentials of Traffic Engineer Mohammed Abdallah , PE

Download Presentation

Sheeler Avenue Townhomes Planned Development

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Sheeler avenue townhomes planned development

Sheeler Avenue TownhomesPlanned Development

The Keewin Real Property Company, LLC


Evidence book

Evidence Book

  • Printed Slides of Powerpoint Presentation to Orange County BCC on 7/10/07

  • Professional Credentials of Traffic Engineer Mohammed Abdallah, PE

  • Professional Credential of Civil Engineer David Evans, PE

  • Traffic Impact Analysis for Sheeler Road dated December 2005

  • Phase I Environmental Site Assessment dated December 13, 2005

  • OC Capacity Reservation Certificate No. 06-90 dated November 29, 2006

  • Sales Comparison Analysis as of May 2007

  • Capacity Enhancement Agreement with OCPS dated May 22, 2007

  • Orange County Final Staff Recommendation dated June 20, 2007

  • Traffic Impact Memorandum dated July 9, 2007


Location

Location


Area future land use map

Area Future Land Use Map

Commercial

Low Density Residential

Medium Density Residential


Keewin s request

Keewin’s Request

Overturn Planning and Zoning Commission Recommendation for denial and approve Planned Development Rezoning for 174 townhomes (reduced from 200) in accordance with staff recommended conditions


Surrounding residential

Surrounding Residential


Surrounding residential1

Surrounding Residential


Surrounding residential2

Surrounding Residential


Surrounding residential3

Surrounding Residential


Nearby commercial

Nearby Commercial


Nearby commercial1

Nearby Commercial


Nearby commercial2

Nearby Commercial


Development considerations

Development Considerations

1. Future Land Use

2. Schools

3. Traffic


Future land use designation

Future Land Use Designation

  • Medium Density Residential future land use adopted 16 years ago in 1991

  • MDR Allows up to 20 Units Per Acre

  • Low Medium Density Allows up to 10 DU/A

  • Low Density Allows up to 4 DU/A

  • We Are reducing our request to 8.13 DU/A


School impacts

School Impacts

Capacity Enhancement Agreement Approved by OCPS May 22, 2007 and Executed

Additional Contribution Amount of $1.3 Million Less the Prepaid School Impact Fees

Capacity Available Upon Payment


Traffic impacts

Traffic Impacts

Capacity Reservation Certificate Executed

“The purpose of the Capacity Reservation process is to allow property owners and developers to ensure that capacity is available when it is needed for a particular project.” (Orange County Land Development Code)

Issued in November 2006.

Total Obligation of $429,275 with first payment of $144,727 made to Orange County on November 29, 2006


Orange county staff recommendation for approval

Orange County Staff Recommendation for Approval

  • Project “compatible with the existing development in the area.”

  • Project “consistent with the Medium Density Residential land use.”

  • Traffic Concurrency – “Capacity is available to be encumbered for this project.”


Planning zoning denial

Planning & Zoning: Denial

  • Reasons Stated:

    • Traffic/Inadequate Infrastructure

    • Consistency with Comp Plan

    • Compatibility


Changes to project since p z commission decision

Changes to Project Since P & Z Commission Decision

Project size has been reduced from 200 DU to 174 DU since hearing

Density has been reduced from 10 DU/A to 8.13 DU/A

Capacity Enhancement Agreement has now been executed by OCPS

Implication of having a Transportation Concurrency Reservation Certificate was not adequately understood by P & Z Commission

Grounds for denial cited by P & Z are not legally defensible


June 2007 community meeting issues

June 2007 Community Meeting Issues

  • Traffic Impacts

  • Environmental Issues

  • Accidents on Sheeler Road

  • Compatibility


Traffic concerns

Traffic Concerns

  • Community Meeting statements that there were numerous accidents on Sheeler Rd.

  • However, Orange County crash data states that in the vicinity of the project entrance and 10th Street, there were only 3 crashes between January 2006 and May 2007

  • Community Meeting statements that it was difficult to exit 10th Street today and that the project will significantly impair the conditions

  • However, current traffic studies reflect that there are only 60 vehicles in the evening peak hour and the road has a capacity many times that amount with average delays of 16 seconds at the stop sign at the 10th Street intersection with Sheeler. The intersection is operating at LOS C

  • The project traffic is only 6.5% of the total traffic on Sheeler and does not cause the road to fail. Sheeler is presently operating at 70% of capacity and can easily accommodate the project

  • And, opening of Keene Road Interchange with SR 414 in 2009 (before project fully opens) is expected to reduce amount of vehicles going north on Sheeler Road.


Traffic concerns1

Traffic Concerns

  • Project meets Traffic Concurrency Requirements

  • Project has a Concurrency Reservation Certificate with substantial funds paid to Orange County

  • Project contributed 33 feet of right of way to Orange County for widening of Sheeler Road

  • With Concurrency Reservation Certificate, traffic concurrency is not a legal issue


Environmental issues

Environmental Issues

  • Community Meeting statement that the area had many endangered or protected species

  • However, the facts are that an Ecological Constraints Review performed by environmental scientists reflects that only gopher tortoises actually appeared on site and they will be handled in the manner required by new regulations

  • Additional detailed environmental surveys by licensed professional required in accordance with Orange County land development regulations at time of Preliminary Subdivision Plan approval


Compatibility issues

Compatibility Issues

  • Current Land Use

    • North: Single Family (R-1)

    • East: Manufactured Homes (R-3) and Commercial (Church)

    • West: Single Family (R-1)

    • South: City of Apopka PUD (Single Family)

  • Future Land Use

    • North: Medium Density Residential

    • East: Commercial

    • West: Single Family Residential

    • South: City of Apopka Commercial, Residential and Orange County Medium Density Residential


What does compatibility not mean

What Does Compatibility Not Mean?

  • Does it mean that housing adjacent to each other must be the same density? ABSOLUTELY NOT!

  • What is the basis for that conclusion?

    • The Orange County Comprehensive Plan requires diversity of housing types

    • Common sense would suggest that if that were the case, then all housing would be the same everywhere

    • Best example might be to simply look at the Orange County Land Use Map

    • Another example-group homes in single family neighborhoods are compatible-case decided by the 5th DCA

  • Planning and Zoning Commission erroneously concluded that because there were no townhomes in the area, then the introduction of townhomes would create incompatibility


Community meeting concerns about compatibility

Community Meeting Concerns About Compatibility

  • Statements were made by area residents that they were opposed to this “low income housing project” and that it would devalue their homes

  • Public is misinformed about the nature of the project since it is a market rate “for sale” project that will have units in which the minimum sales price projection is in the range of $205,000 to $235,000 per unit

  • An analysis of home sales in the area of the project reflects 58 sales over the 2005-2006 time period when prices of homes were rapidly rising.

  • The average sales price of a home in the vicinity of the project was $176,000 during that period


Community meeting concerns about compatibility1

Community Meeting Concerns About Compatibility

Concerns were expressed that the townhomes would be populated by two and three families

Facts are that Orange County code limits the number of people that can reside in a residence

Townhouses will be subject to mandatory Homeowners Association which will assess fees to assure proper maintenance and to enforce occupancy restrictions to be contained in a recorded Declaration of Restrictive Covenants


Community meeting concerns about compatibility2

Community Meeting Concerns About Compatibility

  • Concerns were expressed that the townhomes could be rented

  • The owners of townhomes have the same right to rent their homes as the owners of single family detached residences

  • There may have been a misconception as to the development standards for townhomes as compared to the those applicable to single family residences:


Orange county zoning standard comparisons of adjacent residential properties

District Lot Size AC Area Width Front Back Side Height

R-1    5,000    1,000   50    20     20    5    35   

R-3  4,500    1,000   45  20    20    5    35

TH NA 1,200 NA 20 20 0 35

Orange County Zoning Standard Comparisons of Adjacent Residential Properties


Compatibility

Compatibility

Compatibility does not mean that housing types have to be the same

Orange County Code identifies setbacks, buffers, and walls, as methods to facilitate compatibility

Orange County regulations and practice encourage transitional land use designations as a compatibility tool

Project has a 25 foot buffer, meets all setback requirements, and has a masonry wall along Sheeler Avenue


Public policy considerations

Public Policy Considerations

FUTURE LAND USE: The Growth Management Plan for this property has been in place for 16 years designating a density of up to 20 dwelling units per acre.

To deny the project based upon compatibility with the Comp Plan is to ignore the County’s own policies, the planning horizon for future land use, and the fabric of the Future Land Use Map itself.


Public policy considerations1

Public Policy Considerations

URBAN SPRAWL: This project is within the Urban Service Area and is essentially an infill project.

Population projections as reflected in the Penn Study, My Region.org, and the Bureau of Economic and Business Research at the University of Florida all reflect enormous population gains in Orange County and central Florida through 2030 (Florida will become the 3rd most populous state behind California and Texas).

Failure to provide housing densities inside the Urban Service Area will unquestionably impact housing needs that stimulate urban sprawl.


Public policy considerations2

Public Policy Considerations

HOUSING: There is a present and growing housing need in Orange County for work force housing. While this project may ultimately not meet those standards, clearly, the housing costs for this townhome product in this location provides housing in a more affordable range and quality than can be achieved with traditional housing stock.


Public policy considerations3

Public Policy Considerations

CONCURRENCY: This project meets concurrency in the two most critical areas-transportation and education.

The County sets up infrastructure regulations that land developers must meet in order to build projects.

The developer has met ALL the County requirements, and to deny the project when it meets all standards is not good public policy.


Sheeler avenue townhomes planned development

Keewin respectfully requests that the Board of County Commissioners Approve the Project with the reduced unit count and in accordance with staff recommendations


  • Login